Skip to main content

Establishment profile

WITHERINGTON CONSTRUCTION CORP

HWY 98 AT ORCHARD, Mobile, AL, 36609

Download as PDF →

OSHA inspections
1
over 43 years
Violations
7
Penalties
$0
$0 avg

Summary

WITHERINGTON CONSTRUCTION CORP has accumulated 7 OSHA violations across 1 inspection over 43 years of recorded history.

The establishment sits in the 81st percentile for violations within its industry-state peer group of 27,145 employers. The most recent enforcement activity was recorded 43 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

WITHERINGTON CONSTRUCTION CORP appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
1
0.0 / yr · last 43 yrs
Violations
7
0.2 / yr
Penalties
$0
Inspection trigger · planned
1 of 1

100% of inspections at this establishment produced violations,

Peer comparison

81st

Worse on violations than most other employers. Peer group: 27,145 employers. This establishment has 7 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for WITHERINGTON CONSTRUCTION CORP. Verify directly with OSHA Injury Tracking Application

Inspection breakdown

Planned
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WITHERINGTON CONSTRUCTION CORP. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
43 years ago

No federal enforcement activity has been recorded against this establishment in 43+ years. Most recent activity: 43 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for WITHERINGTON CONSTRUCTION CORP. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for WITHERINGTON CONSTRUCTION CORP. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for WITHERINGTON CONSTRUCTION CORP. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WITHERINGTON CONSTRUCTION CORP. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for WITHERINGTON CONSTRUCTION CORP. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WITHERINGTON CONSTRUCTION CORP. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$27.4M
Awards
57
Top agency
General Services Administration
$27.4M
Largest awards (top 50 of 57)
  • General Services Administration
    BASEMENT RENOVATION
    contract · Last action 2011-10-24
    $2,452,299
  • General Services Administration
    CONSTRUCTION OF BIO-SAFE MAILROOM ON THE EXISTING LOADING DOCK. CONSTRUCT AND INSTALL NEW PRISONER ELEVATOR INCLUDING ELEVATOR CAB, EQUIPMENT, CONTROLS, ETC. AND ASSOCIATED MECHANICAL, ELECTRICAL, AND SECURITY WORK IN EXISTING ELEVATOR TOWER CONSTRUCTED UNDER A PREVIOUS PROJECT. BALANCE OF CONSTRUCTION AND INSTALLATION WORK RELATED TO NEW PRISONER ELEVATOR NOT COVERED UNDER LINE ITEM 0002. CONSTRUCT NEW VEHICLE SALLYPORT IN THE PARKING LOT OF THE BUILDING WITH A COMBINATION OF LIMESTONE AND EFIS EXTERIOR FINISH. CONSTRUCT NEW EMERGENCY GENERATOR ROOM ON THE LOADING DOCK OF THE BUILDING WITH A LIMESTONE FINISH. FURNISH AND INSTALL NEW EMERGENCY GENERATOR AND RELATED ACCESSORIES IN THIS ROOM.
    contract · Last action 2012-08-10
    $2,240,785
  • General Services Administration
    IGF::CT::IGF MEPSCOM BUILD-OUT MCCOY FB 14TH&15TH FL JACKSON MS.
    contract · Last action 2015-11-03
    $1,889,738
  • General Services Administration
    IGF::OT::IGF COURTROOM 7A RENOVATION, SAM GIBBONS FEDERAL COURTHOUSE, TAMPA FL
    contract · Last action 2016-07-28
    $1,788,025
  • General Services Administration
    IGF::OT::IGF DESIGN-BUILD TASK ORDER TO REPAIR WATER INTRUSION ISSUES AT THE U. S. COURTHOUSE, NATCHEZ MS MS008ZZ
    contract · Last action 2017-03-14
    $1,348,084
  • General Services Administration
    IGF::OT::IGF INTERIOR AND EXTERIOR WATERPROOFING REPAIRS, BIRMINGHAM, AL
    contract · Last action 2013-10-17
    $1,203,876
  • General Services Administration
    DEMOLIOTION AND INSTALLATION OF CHILLER AT THE ASHEVILLE FEDERAL BUILDING IGF::OT::IGF
    contract · Last action 2015-09-14
    $1,162,500
  • General Services Administration
    IGF::CT::IGF DB HVAC UPGRADE, ANERNETHY FB, ABERDEEN, MS
    contract · Last action 2016-09-15
    $1,128,649
  • General Services Administration
    RENOVATE U.S. MARSHAL SERVICE SPACE, ALTON LENNON FEDERAL BUILDING AND COURTHOUSE, WILMINGTON, NC
    contract · Last action 2009-04-29
    $1,092,428
  • General Services Administration
    IGF::CT::IGF 4TH&9TH FLOOR RENOVATION
    contract · Last action 2016-04-22
    $1,063,607
  • General Services Administration
    IGF::OT::IGF 1. CONSTRUCTION OF GSA FUNDED SHELL WORK FOR THE BANKRUPTCY COURT ON THE 1ST FLOOR. SHELL WORK INCLUDES DEMOLITION OF EXISTING WALLS, CEILINGS, VAULT, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SAFETY SYSTEMS. ALSO INCLUDED IS CONSTRUCTION OF NEW PERIMETER WALLS, INCLUDING NEW EXTERIOR WALLS, NEW PUBLIC CORRIDOR AS WELL AS NEW HVAC AND NEW SUSPENDED ACOUSTICAL CEILING SYSTEM BASED UPON AN OPEN SPACE PLAN. ALSO INCLUDED IS CONSTRUCTION OF THE RENOVATIONS/RESTORATION OF THE EXISTING HISTORIC LOBBY, NEW PUBLIC RESTROOMS AND NEW SPRINKLER SYSTEM AND MODIFICATIONS TO THE FIRE ALARM SYSTEM THROUGHOUT THE ENTIRE PROJECT AREA. CONSTRUCTION WORK TO CONFORM WITH FINAL DESIGN DOCUMENTS DATED JULY 11, 2012. 2. CONSTRUCT U.S. BANKRUPTCY COURT FUNDED TENANT IMPROVEMENTS (TI'S) FOR THE BANKRUPTCY COURT ALTERATIONS, INCLUDING NEW WALLS WITHIN THE PERIMETER WALLS, FINISHES, MILLWORK, UPGRADED CEILINGS, ELECTRICAL DISTRIBUTION AND OUTLETS, INFRASTRUCTURE FOR BANKRUPTCY COURT TELEPHONE, IT&SECURITY SYSTEMS, PLUMBING AND VENTILATION FOR PRIVATE TOILET, ETC. CONSTRUCTION WORK TO CONFORM WITH FINAL DESIGN DOCUMENTS DATED JULY 11, 2012. 3. CONSTRUCT GSA FUNDED TENANT IMPROVEMENTS (TI'S) FOR THE BANKRUPTCY COURT ALTERATIONS, INCLUDING NEW WALLS WITHIN THE PERIMETER WALLS, FINISHES, MILLWORK, UPGRADED CEILINGS, ELECTRICAL DISTRIBUTION AND OUTLETS, INFRASTRUCTURE FOR BANKRUPTCY COURT TELEPHONE, IT&SECURITY SYSTEMS, PLUMBING AND VENTILATION FOR PRIVATE TOILET, ETC. CONSTRUCTION WORK TO CONFORM WITH FINAL DESIGN DOCUMENTS DATED JULY 11, 2012.
    contract · Last action 2014-09-11
    $1,009,889
  • General Services Administration
    DETENTION CENTER FOR USMS
    contract · Last action 2012-01-24
    $870,445
  • General Services Administration
    ALUMINUM CURTAIN WALL RENOVATION AT THE HUGO BLACK FEDERAL CH IN BIRMINGHAM, AL.
    contract · Last action 2009-12-09
    $821,146
  • General Services Administration
    IGF::OT::IGF REPLACE THE CHILLER AT THE ARNOW US COURTHOUSE, PENSACOLA, FL.
    contract · Last action 2014-09-24
    $803,435
  • General Services Administration
    IGF::CT::IGF ELEVATOR REPLACEMENT AND UPGRADES, WILLIAM M COLMER FB HATTIESBURG, MS
    contract · Last action 2018-09-19
    $706,859
  • General Services Administration
    IGF::OT::IGF PADUCAH CEILING REPLACEMENT PROJECT - US FEDERAL COURTHOUSE - PADUCAH, KY
    contract · Last action 2018-07-12
    $637,639
  • General Services Administration
    GENERAL RENOVATIONS IRS, COVINGTON, KY
    contract · Last action 2010-03-19
    $583,187
  • General Services Administration
    IGF::OT::IGF PARKING GARAGE UPGRADES, MOBILE, AL
    contract · Last action 2015-09-01
    $530,864
  • General Services Administration
    IGF::CT::IGF INTERIOR RENOVATION AND ASBESTOS SERVICES IN ANNISON, AL
    contract · Last action 2017-08-18
    $500,292
  • General Services Administration
    IGF::CT::IGF PAINT&CARPET FOR FBI AT EAGLECREST BLDG.
    contract · Last action 2016-11-02
    $483,399
  • General Services Administration
    IGF::OT::IGF REPLACE ROOF AT COURTHOUSE IN VICKSBURG, MS
    contract · Last action 2016-08-30
    $445,202
  • General Services Administration
    IGF::OT::IGF THIS IS A PROCUREMENT FOR THE DEA TO EXPAND THEIR 10TH FLOOR SPACE AT THE ROMANO L. MAZZOLI FEDERAL BUILDING AT 600 DR. MLK JR. PLACE, LOUISVILLE, KY 40202-2238 KY0086ZZ
    contract · Last action 2019-05-01
    $407,572
  • General Services Administration
    IGF::OT::IGF INSTALLING SECURITY FENCE AT THE COURTHOUSE IN HATTIESBURG, MS
    contract · Last action 2016-07-27
    $404,829
  • General Services Administration
    THE DESIGN AND REPLACEMENT OF EXISTING GENERATOR,ELECTRICAL PANEL, AND ELECTRICAL TRANSFER SWITCH IN THE PENTHOUSE.THE LOCATION IS THE WILLIAM M. COLMER FB-CT, IN HATTIESBURG MS.
    contract · Last action 2012-12-18
    $392,291
  • General Services Administration
    TASK ORDER UNDER CONTRACT GS04P16EXD7018 LOCATED AT THE MAZZOLI FB (KY0086ZZ), 600 DR. MARTIN L. KING, PL., LOUISVILLE, KY. 40202.
    contract · Last action 2021-02-26
    $372,613
  • General Services Administration
    IGF::OT::IGF TASK ORDER AWARD TO ENHANCE JUDGE'S ENTRYWAYS INTO CHAMBERS AND TO BUILD COURTROOM BENCHES. MS0007ZZ
    contract · Last action 2015-08-26
    $364,371
  • General Services Administration
    IGF::OT::IGF "OTHER FUNCTIONS" REPAIR PERIMETER FAN COIL UNITS; FEDERAL BUILDING FEDERAL BUILDING 109 ST. JOSEPH ST. MOBILE, AL 36602-3605
    contract · Last action 2015-11-02
    $361,867
  • General Services Administration
    THIS IS A PROCUREMENT FOR THE US ARMY CORPS OF ENGINEERS FOR THE 9TH FLOOR PHASE IV SPACE RENOVATIONS AT THE MAZZOLI FB AT 600 DR. MLK JR PLACE LOUISVILLE KY 40202 (KY0086ZZ)
    contract · Last action 2019-08-13
    $329,740
  • General Services Administration
    IGF::OT::IGF THIS IS A PROCUREMENT FOR THE USACE TO PERFORM 1ST FLOOR SPACE RENOVATIONS AT THE ROMANO L. MAZZOLI USFB; 600 DR MLK JR PLACE, LOUISVILLE, KY 40202-2238 (KY0086ZZ)
    contract · Last action 2018-09-07
    $325,919
  • General Services Administration
    USMS RENOVATIONS ATTHE HUGO L. BLACK COURTHOUSE IN BIRMINGHAM, AL
    contract · Last action 2010-01-29
    $310,863
  • General Services Administration
    IGF::CT::IGF IRS #CI VSR BUIL OUT ON 3RD FLOOR OF WILLIAM M COLMER BLDG
    contract · Last action 2015-11-18
    $291,380
  • General Services Administration
    2ND AND 3RD FLOOR RENOVATIONS
    contract · Last action 2008-08-08
    $220,338
  • General Services Administration
    IGF::OT::IGF NEW AWARD DESIGN-BUILD 3RD FLOOR SPACE MODIFICATIONS LOCATION: WAYCROSS, GEORGIA UNITED STATES POST OFFICE-COURTHOUSE
    contract · Last action 2017-02-16
    $203,134
  • General Services Administration
    ACCOMPLISH ALTERATIONS FOR U.S. DISTRICT COURTS ON FIRST FLOOR AT THE G. ROSS ANDERSON FB-CT, 315 S. MCDUFFIE ST., ANDERSON, SC. PROJECT INVOLVES APPROX. 2,848 SQ FT OF 2ND GENERATION COURT'S SPACE.
    contract · Last action 2012-07-09
    $171,988
  • General Services Administration
    IGF::OT::IGF, HVAC DUCTWORK MODIFICATIONS.
    contract · Last action 2014-08-06
    $108,421
  • General Services Administration
    RENOVATE CLERK'S SPACES, ROBERTS BUILDING, MOBILE, AL
    contract · Last action 2012-01-26
    $102,497
  • General Services Administration
    IGF::OT::IGF DB ELECTRICAL GROUNDING UPGRADES, FMJ FB-CT ANNEX, MONTGOMERY, AL
    contract · Last action 2014-09-18
    $87,652
  • General Services Administration
    JOINT FITNESS ROOM UPGRADE.
    contract · Last action 2010-03-04
    $43,986
  • General Services Administration
    RENOVATIN/ALTERATION OF HISTORIC BUILDING FOR USE AS U.S. FEDERAL COURTHOUSE
    contract · Last action 2008-08-08
    $36,706
  • General Services Administration
    ROOF REPAIR
    contract · Last action 2010-05-27
    $35,958
  • General Services Administration
    IGF::OT::IGF "OTHER FUNCTIONS" INSTALL WATER SOURCE HEAT PUMP; USACE READINESS SUPPORT CENTER PROBATION BUILDING 201 ST. MICHAEL STREET MOBILE, AL 36602-2902
    contract · Last action 2015-05-15
    $20,739
  • General Services Administration
    IGF::OT::IGF "OTHER FUNCTIONS" REPLACE HVAC; FAS AL0076AB FEDERAL BUILDING MOBILE, AL
    contract · Last action 2014-09-26
    $18,549
  • General Services Administration
    PROVIDE DESIGN AND INSTALLATION OF FENCING, FLAG POLE, LANDSCAPING, AND BUILDING PLAQUES.
    contract · Last action 2008-03-05
    $17,960
  • General Services Administration
    BUILDING UPGRADES AND EXTERIOR STAIR
    contract · Last action 2007-10-30
    $9,639
  • General Services Administration
    ROOF WARRANTY FOR AL0076AB
    contract · Last action 2008-02-05
    $4,999
  • General Services Administration
    REPLACE 4" ROOF DRAIN ASSEMBLY WITH NEW 4" DRAIN ASSEBLY.
    contract · Last action 2010-09-16
    $4,784
  • General Services Administration
    REPLACE 150 AMP BREAKER. PROJECT WAS HEADED BY DESIGN AND CONSTRUCTION. BREAKER REPLACEMENT WAS APPROVED BY DESIGN AND CONSTRUCTION. $2830.00
    contract · Last action 2011-01-25
    $2,830
  • General Services Administration
    IGF::OT::IGF NEW AWARD---MULTIPLE AWARD GENERAL CONSTRUCTION IDIQ, KENTUCKY AND TENNESSEE
    contract · Last action 2021-08-08
    $0
  • General Services Administration
    PROVIDE ALL LABOR MATERIALS SUPERVISION, TOOLS AND EQUIPMENT NECESSARY FOR GENERAL REPAIRS AND ALTERATIONS TO GOVERNMENT OWNED AND LEASED FACILITIES FOR GEORGIA, N. FLORIDA, ALABAMA, MISSISSIPPI, AND TENNESSEE. THIS WILL BE AN INDEFINITE QUANTITY CONTRACT FOR GENERAL CONSTRUCTION, REPAIRS AND ALTERATIONS WITH THE ABILITY TO PERFORM ASSOCIATED DESIGN SERVICES FOR CONSTRUCTION PROJECTS RANGING FROM APPROXIMATELY $1,000 TO $5,000,000. ANY CONTRACTS AWARDED THIS SOLICITATION WILL BE FOR A ONE YEAR BASE PERIOD WITH FOUR ADDITIONAL ONE YEAR OPTIONS.
    contract · Last action 2016-09-21
    $0
  • General Services Administration
    ASHVILLE CHILLER REPLACEMENT PROJECT ASHEVILLE NORTH CAROLINA FEDERAL BUILDING IGF::OT::IGF
    contract · Last action 2015-12-31
    $0

Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2021-08-08. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1983-04-19Planned7$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on WITHERINGTON CONSTRUCTION CORP from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is WITHERINGTON CONSTRUCTION CORP's OSHA violation history?
WITHERINGTON CONSTRUCTION CORP has 1 OSHA inspection on record with 7 violations and $0 in total penalties.