Establishment profile
WESTERN WOOD STRUCTURES INC
20675 SW 105TH AVE, TUALATIN, OR, 97062
236115 — New Single-Family Housing Construction (except For-Sale Builders)
Summary
WESTERN WOOD STRUCTURES INC has accumulated 13 OSHA violations across 3 inspections over 24 years of recorded history, with $3,410 in total assessed penalties.
The establishment sits in the 99th percentile for violations within its industry-state peer group of 6,180 employers. Inspection frequency runs at the 93rd percentile. The most recent enforcement activity was recorded 18 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
WESTERN WOOD STRUCTURES INC appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
67% of inspections at this establishment produced violations,
Peer comparison
Worse on violations than nearly every other employer in NAICS 2361 within OR. Peer group: 6,180 employers. This establishment has 13 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 37 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WESTERN WOOD STRUCTURES INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 18+ years. Most recent activity: 18 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for WESTERN WOOD STRUCTURES INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for WESTERN WOOD STRUCTURES INC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for WESTERN WOOD STRUCTURES INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for WESTERN WOOD STRUCTURES INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for WESTERN WOOD STRUCTURES INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WESTERN WOOD STRUCTURES INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of AgricultureINHT BRIDGE PURCHASEcontract · Last action 2019-05-31$236,200
- Department of AgriculturePALISADES RANGER DISTRICT INTENDS TO PURCHASE 5 TRAIL BRIDGES. THE BRIDGES ARE 4 STRINGER GLUE LAMINATED TIMBER BRIDGES AND MEET SPECIFICATIONS FOR PACK AND SADDLE. IF THE TOTAL COST FOR ALL 5 BRIDGES EXCEEDS AVAILABLE FUNDS THE FOREST MAY CHOOSE TOcontract · Last action 2024-03-15$205,800
- Department of Agriculture"GAOA" DIAMOND CREEK FALLS CREEK TRAIL BRIDGE - SUPPLY AND DELIVER F.O.B. DESTINATION 61 FOOT SPAN (62 FOOT OUT-OUT) PREFABRICATED BRIDGE SUPERSTRUCTURE, DESIGN, FABRICATE AND DELIVER DELIVERY 150 DAYS AROcontract · Last action 2024-06-05$102,250
- Department of AgricultureFISH LAKE CREEK TRAIL BRIDGE SUPPLY AND DELIVERYcontract · Last action 2022-04-27$74,149
- Department of AgricultureTRAIL BRIDGE SUPERSTRUCTURES (9)contract · Last action 2012-05-08$64,780
- Department of AgricultureSUPPLY. PURCHASE OF GLUED LAMINATED TIMBER BRIDGE DECKS - FURNISH PREFABRICATED, PORTABLE, LONGITUDINAL GLUED-LAMINATED, TREATED TIMBER SLAB BRIDGE USING STRUCTURAL LUMBER AND TIMBER OF THE REQUIRED STRESS AND GRADE. THE FURNISHED STRUCTURE SHALL MEEcontract · Last action 2021-05-20$61,230
- Department of AgricultureBOULDER CREEK TRAIL BRIDGE SUPPLY AND DELIVERYcontract · Last action 2020-06-02$51,890
- Department of AgricultureSOUTH FORK BEAR CREEK TRAIL BRIDGE AND BEAR CREEK TRAIL BRIDGEcontract · Last action 2021-08-23$51,624
- Department of Agriculture01 0414 GAOA 4FD NORTON COMPLEX TRAILHEAD BRIDGE PER SPECIFICATIONcontract · Last action 2023-06-30$50,870
- Department of AgricultureIGF::OT::IGF BOUNDARY BRIDGEcontract · Last action 2014-06-17$48,230
- Department of AgricultureFOSSIL TRAIL BRIDGE- TITLE II FUNDINGcontract · Last action 2013-09-17$40,820
- Department of AgricultureGRAND MOGUL TRAIL BRIDGE MATERIAL SUPPLY PROJECT.contract · Last action 2019-06-19$37,749
- Department of the InteriorSUPPLY & DELIVER FOOTBRIDGE MATERIALS, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIAcontract · Last action 2022-09-23$32,130
- Department of AgricultureSUPPLY CONTRACT FOR TRAIL BRIDGE SUPPLY AND DELIVERYcontract · Last action 2022-03-21$30,340
- Department of AgricultureGLUE LAMINATED STRINGER TRAIL BRIDGEcontract · Last action 2013-05-22$29,950
- Department of the InteriorSUPPLY & DELIVERY OF BRIDGE STRINGERS, LASSEN VOLCANIC NATIONAL PARK, TEHAMA COUNTY, CALIFORNIAcontract · Last action 2023-07-26$29,700
- Department of AgricultureANTHEM CREEK TRAIL BRIDGE SUPPLYcontract · Last action 2019-05-08$26,755
- Department of AgricultureFOR CONTRACT ACTION: FURNISHING AND DELIVERY OF TIMBER AND HARDWARE TO ASSEMBLE A BRIDGE. LOCATION: FERN CREEK/WHITE MT. R.D. SEE ATTACHMENTS FOR SPECIFICATIONS.contract · Last action 2012-03-22$24,710
- Department of the InteriorTHE NATIONAL PARK SERVICE (NPS) AT LASSEN VOLCANIC NATIONAL PARK HAS A FOR SUPPLY AND DELIVERY OF ONE (1) THREE STRING GLU-LAM BRIDGE. THE PROJECT IS LOCATED AT LASSEN VOLCANIC NATIONAL PARK MINERAL HEADQUARTERS, TEHAMA COUNTY, CA.contract · Last action 2025-06-10$23,415
- Department of the InteriorGLACIER NATIONAL PARK (GLAC) REQUIRES THE PURCHASE OF GLULAM COLUMNS OF VARIOUS DIMENSIONS AND LENGTHS. -SEE ATTACHED REQUIRED SPECIFICATION SHEET ALONG WITH DELIVERY REQUIREMENTS/RESTRICTIONS. DELIVERY LOCATION: NPS. GLACIER NP 61 SCOYEN CIRCcontract · Last action 2022-03-11$19,870
- Department of AgricultureIGF::OT::IGF UNION CREEK BRIDGE STRINGERS, NACHES RANGER DISTRICTcontract · Last action 2015-04-15$19,525
- Department of Agriculture6FT X 35FT GLUED LAMINATED STRINGER BRIDGE KIT NEEDED FOR INSTALLATION BY TU TEAM ON THE BULL CREEK PRJ, ON THE BOISE NF. SEE ATTACHED SPECIFICATIONS FOR DETAILS. TOTAL COST OF BRIDGE KIT = $18,600.00, THIS INCLUDES GLULAMINATING ON ALL BRIDE COMPONENTS AND SHIPPING TO DESTINATION. DELIVERY TO BE MADE NLT 28 JUNE 2012, AS PROJECT IS SCHEDULED TO COMMENCE 29 JUNE 2012.contract · Last action 2012-05-10$18,600
- Department of AgricultureIGF::OT::IGFcontract · Last action 2014-07-22$18,500
- Department of the InteriorREPLACEMENT GLULAM AND DIMENSIONAL LUMBER, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA.contract · Last action 2021-06-10$18,158
- Department of AgricultureEAST VALLEY CREEK TRAIL BRIDGE MATERIAL SUPPLY PROJECT.contract · Last action 2019-05-04$17,495
- Department of AgricultureMATERIALS PKG FOR 3 LINKS BRIDGE REPAIRS (CFTL02)contract · Last action 2012-02-27$16,742
- Department of the InteriorSHELTER FOR FIRE MANAGEMENT DEPARTMENTcontract · Last action 2009-08-27$16,450
- Department of AgricultureWOLVERINE CREEK TRAIL BRIDGE MATERIALS, INCLUDING STRINGERS, ABUTMENTS SILL, BACKING PLANKS, DECK, HANDRAIL, RUNNING PLANKS, ALL HARDWARE TO ATTACHE AND ASSEMBLE THESE ITEMS, TIMBER SILL, ABUTMENT ANCHOR BOLTS, AND STRAPS. TIMBER ELEMENTS TO BE CUT Acontract · Last action 2020-09-22$15,990
- Department of AgricultureWHITE RIVER NF - RUEDI RESERVOIR PRE-FAB TRAIL BRIDGEcontract · Last action 2016-08-23$15,560
- Department of AgricultureUC FOOTBRIDGEcontract · Last action 2008-09-10$14,300
- Department of AgriculturePNF-MAJOR PROJECT BUTTERFLY VALLEY TRAIL LUMBER AND HARDWAREcontract · Last action 2020-09-23$14,211
- Department of Agriculturecontract · Last action 2009-03-27$13,600
- Department of AgriculturePYRAMID TRAIL BRIDGE STRINGERScontract · Last action 2012-09-26$12,400
- Department of AgricultureTRAIL BRIDGE MATERIALS. GLU LAMINATED PRESSURE TREATED STRINGERS, DECKING AND HARDWAREcontract · Last action 2012-08-15$9,670
- Department of Agriculture25' TIMBER TRAIL BRIDGE AT TIMPOONEKE/SALAMANDER FLAT TRAILcontract · Last action 2016-03-02$9,530
- Department of Agriculture6' X 23' GIRDER BRIDGE (KIT FORM) (PER ATTACHED SPECIFICATIONS)contract · Last action 2012-07-17$9,200
- Department of AgricultureMARSH CREEK SUPPLIES FOR SALMON CHALLIS NATIONAL FORESTcontract · Last action 2019-06-19$9,120
Federal contract dollars to this establishment. Primary NAICS: 321999 - ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING. Last action: 2025-06-10. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2008-03-19 | Follow-up | 0 | — | $0 | |
| 2007-11-28 | Planned | 10 | 4 | $3,310 | |
| 2001-08-07 | Planned | 3 | — | $100 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in new single-family housing construction (except for-sale builders) within OR, ordered by federal enforcement volume:
- RUSSELL CONSTRUCTION INCPORTLAND — 2 federal enforcement records
- TIMBER TECHNOLOGIES LLCBEAVERTON — 2 federal enforcement records
- PRESTO HOMES INCHILLSBORO — 2 federal enforcement records
- PHOENIX INDUSTRIAL INCSPRINGFIELD — 2 federal enforcement records
- PRESTO HOMES INCBEAVERTON — 2 federal enforcement records
- R & H CONSTRUCTION COPORTLAND — 2 federal enforcement records
- TIMBER TECHNOLOGIES LLCHILLSBORO — 2 federal enforcement records
- PRESTO HOMES INCEUGENE — 2 federal enforcement records
- G BUILDERS LLCCORVALLIS — 2 federal enforcement records
- G BUILDERS LLCMONMOUTH — 2 federal enforcement records
Related searches
- New Single-Family Housing Construction (except For-Sale Builders)All employers in this industry
- Employers in ORState-wide enforcement data
- New Single-Family Housing in ORIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on WESTERN WOOD STRUCTURES INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is WESTERN WOOD STRUCTURES INC's OSHA violation history?
- WESTERN WOOD STRUCTURES INC has 3 OSHA inspections on record with 13 violations and $3,410 in total penalties.
- How does WESTERN WOOD STRUCTURES INC's safety record compare to its industry?
- WESTERN WOOD STRUCTURES INC operates in the new single-family housing construction (except for-sale builders) industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. WESTERN WOOD STRUCTURES INC's self-reported DART rate is 0 compared to an industry average of 1.4.