Summary
WEEKLY BROS INC has accumulated 6 OSHA violations across 4 inspections over 23 years of recorded history, with $210 in total assessed penalties.
The establishment sits in the 87th percentile for violations within its industry-state peer group of 710 employers. Inspection frequency runs at the 87th percentile. The most recent enforcement activity was recorded 13 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
WEEKLY BROS INC appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
75% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 6 distinct standards shown · 6 citations in this view · $210 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 7031.501 | 1 | 1 | $210 | Jul 2011 | Jul 2011 |
| 29 CFR 1926.0300 A | 1 | 1 | — | Oct 2012 | Oct 2012 |
| 29 CFR 1926.0404 F06 | 1 | 1 | — | Jul 2011 | Jul 2011 |
| 29 CFR 7010.76506 B A | 1 | 1 | — | Mar 2003 | Mar 2003 |
| 29 CFR 7010.76506 D AI | 1 | 1 | — | Mar 2003 | Mar 2003 |
| 29 CFR 7030.50302 A | 1 | 1 | — | Mar 2003 | Mar 2003 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2373 within OR. Peer group: 710 employers. This establishment has 6 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for WEEKLY BROS INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WEEKLY BROS INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 13+ years. Most recent activity: 13 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for WEEKLY BROS INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in OR — for WEEKLY BROS INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other WEEKLY BROS INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 14 citations · 5S&S · 1 contractor · $14,551 proposed / $11,908 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6344524 | Weekly Bros Inc Douglas, OR | Jan 2004 | — | Yes | HighNegligence | $13,000 | $10,400 |
| 6338523 | Weekly Bros Inc Douglas, OR | Jan 2010 | — | Yes | ModNegligence | $243 | $243 |
| 6338521 | Weekly Bros Inc Douglas, OR | Jan 2010 | — | No | ModNegligence | $243 | $200 |
| 9612079 | Portable Crusher Curry, OR contractor: Weekly Bros. Inc. | Apr 2021 | — | No | LowNegligence | $125 | $125 |
| 6352623 | Weekly Bros Inc Douglas, OR | Nov 2003 | — | Yes | ModNegligence | $124 | $124 |
| 6352622 | Weekly Bros Inc Douglas, OR | Nov 2003 | — | Yes | ModNegligence | $124 | $124 |
| 8559299 | Weekly Bros Inc Douglas, OR | Nov 2010 | — | No | ModNegligence | $100 | $100 |
| 6338526 | Weekly Bros Inc Douglas, OR | Jan 2010 | — | No | LowNegligence | $100 | $100 |
| 6338525 | Weekly Bros Inc Douglas, OR | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6338524 | Weekly Bros Inc Douglas, OR | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6338522 | Weekly Bros Inc Douglas, OR | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6352621 | Weekly Bros Inc Douglas, OR | Nov 2003 | — | Yes | ModNegligence | $72 | $72 |
| 6352620 | Weekly Bros Inc Douglas, OR | Nov 2003 | — | No | ModNegligence | $60 | $60 |
| 6352619 | Weekly Bros Inc Douglas, OR | Nov 2003 | — | No | ModNegligence | $60 | $60 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for WEEKLY BROS INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WEEKLY BROS INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for WEEKLY BROS INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WEEKLY BROS INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of AgricultureIGF::OT::IGF ROAD 21 RECONSTRUCTIONcontract · Last action 2016-07-08$964,177
- Department of AgricultureIGF::OT::IGF ROAD 1934 MP 2.1 ERFOcontract · Last action 2014-10-21$830,895
- Department of the InteriorROCK CR RD FILL REPAIR - PHASE IIcontract · Last action 2012-11-07$704,398
- Department of AgricultureROAD 15 M.P. 2.25 ERFOcontract · Last action 2013-06-12$626,821
- Department of AgricultureMIDDLE FORK ERFOcontract · Last action 2009-10-30$524,199
- Department of AgricultureM. GIULIANI - GRAYBACK CREEK LEGACY ROAD RECONSTRUCTION WORK - WILD RIVERS RDcontract · Last action 2013-12-10$472,793
- Department of AgricultureROAD 28 SAFETY IMPROVEMENTS, ROAD CONSTRUCTIONcontract · Last action 2009-09-16$413,170
- Department of the InteriorMUNSON SEWER SYSTEM IMPROVEMENTS PROJECT, CRATER LAKE NATIONAL PARK, KLAMATH COUNTY, OREGONcontract · Last action 2010-09-24$410,000
- Department of AgricultureDIAMOND LAKE SNOPARKS AND CLEARWATER DAY USE IMPROVEMENTScontract · Last action 2011-11-16$407,293
- Department of AgricultureERFO RETAINING WALLS WIL RD 24 M.P. 7.8, RD 2618 M.P. 12.1 IGF::OT::IGFcontract · Last action 2014-09-17$404,558
- Department of AgricultureMULTI-AGENCY ROAD CONSTRUCTION IDIQ (2013) - GRAYBACK LEGACY ROADS 2016 PROJECT - WILD RIVERS RANGER DISTRICT, ROGUE RIVER-SISKIYOU NF THIS INDIVIDUAL PROJECT TASK ORDER CONTRACT INCUDES THE TERMS AND CONDITIONS OF THE BASE IDIQ MULTI-AGENCY ROAD CONSTRUCTION IDIQ (2013)CONTRACT AG-04T0-C-13-0036, AS SUPPLEMENTED BY PROJECT SPECIFIC SPECIFICATIONS, DRAWING AND OTHER CONTRACT REQUIREMENTS THERETO. COR: SCOTT BLOWER (541) 471-6745 IGF::OT::IGFcontract · Last action 2017-11-06$330,182
- Department of the InteriorTHE INSTALLATION OF A LINER, HARDWARE, DISINFECTION AND TESTING OF THE WEST CONCRETE COMPARTMENT, AND (2) REMOVAL AND RELOCATION OF THE VALVES FROM THE EXISTING VALVE HOUSE ADJACENT TO THE STORAGE FACILITY TO THE NEW LOCATIONS INDICATED IN THE ATTACHED PLAN SET. THE VALVE RELOCATION WORK INCLUDES THE VALVES, RISERS, FITTINGS, THRUST BLOCKING, EXCAVATION, BACKFILL, COMPACTION, TEMPORARY WATER BY-PASS, DISINFECTION AND TESTING.contract · Last action 2011-07-07$300,860
- Department of AgricultureIDIQ MULTI-AGENCY ROAD CONSTRUCTION IGF::OT::IGFcontract · Last action 2015-09-23$231,835
- Department of AgricultureREPLACEMENT OF POTABLE WATER TANK AND CONTROLScontract · Last action 2011-10-05$222,848
- Department of AgricultureM GIULIANI - AAP# 06SO1012 52925 JHSN RESERVOIR REPAIRScontract · Last action 2012-07-11$215,873
- Department of AgricultureTASK ORDER ON CONSTRUCTION IDIQ: 2741 BOULDER CREEK ROAD DECOMMISSIONINGcontract · Last action 2010-09-22$202,420
- Department of AgricultureMCKENZIE TRAILHEAD AND WILD AND SCENIC VIEWPOINTcontract · Last action 2008-09-26$169,819
- Department of AgricultureMILL CREEK I CULVERT REPLACEMENT - TASK ORDER FOR ROAD CONSTRUCTION IDIQ CONTRACTcontract · Last action 2009-12-14$169,226
- Department of AgricultureIGF::OT::IGF 2013 UMPQUA NATIONAL FOREST LEGACY ROADS DECOMMISSIONINGcontract · Last action 2016-11-10$166,883
- Department of AgricultureIGF::OT::IGF WEEKLY BROScontract · Last action 2015-10-15$164,066
- Department of AgricultureIGF::OT::IGF MOE THIN OPTED ROADS TASK ORDERcontract · Last action 2014-08-28$149,015
- Department of AgricultureJOHNSON CREEK CULVERT REPLACEMENTcontract · Last action 2012-09-17$129,003
- Department of AgricultureUPPER N.U. RIVER ANADROMOUS FISH SPAWNING HAB RESTORATION-BOULDER PLACEMT,GRAVEL AUG, MOBILIZATION CONTRACT, 2 YR PERF PERIOD, MAX QUANTITY BOULDERS IS 30, MAX GRAVEL IS 1720 CU YDScontract · Last action 2009-05-28$121,044
- Department of AgricultureUPPER NU RIVER ANADROMOUS FISH SPAWNING HABITAT RESTORATION 2contract · Last action 2011-08-10$116,860
- Department of AgricultureMOWICH CREEK CULVERT REPLACEMENTcontract · Last action 2011-09-26$103,646
- Department of AgricultureCEDAR CREEK ROAD 3821 FISH PASSAGE CULVERT REPLACEMENTScontract · Last action 2009-08-31$99,777
- Department of AgricultureIGF::OT::IGF BEAR CAMP ROAD CULVERT REPLACEMENTScontract · Last action 2014-08-04$99,400
- Department of AgricultureAAP# 06SO 1007 34471 ERFO 2006 REPAIR DAMAGE ON GOLD BEACH / POWERS RDScontract · Last action 2010-02-08$82,076
- Department of AgricultureTASK ORDER FOR "ROAD 4710-480 CULVERT REPLACEMENT"contract · Last action 2008-10-20$80,398
- Department of AgricultureTASK ORDER ON CONSTRUCTION IDIQ: 3817-100 ROAD DECOMMISSIONINGcontract · Last action 2010-08-05$73,653
- Department of the InteriorIGF::OT::IGF FS MULTI-AGENCY ROAD CONSTRUCTION IDIQ - SIUSLAW CULVERT REPLACEMENTcontract · Last action 2015-06-09$73,395
- Department of AgricultureLOWER PINNACLE CREEK FISH PASSAGE - TASK ORDER FOR ROAD CONSTRUCTION IDIQ CONTRACTcontract · Last action 2009-07-07$65,605
- Department of AgricultureWHITE MULE CREEK CULVERT REPLACEMENT CONSTRUCTION CONTRACT. TASK ORDER TO ROAD CONSTRUCTION IDIQ CONTRACT.contract · Last action 2011-09-23$48,740
- Department of AgricultureIGF::OT::IGF FOR OTHER FUNCTIONS PACIFICORP PIPE #6520ᦇ REPLACEMENTS.contract · Last action 2015-09-09$43,810
- Department of AgricultureIGF::OT::IGF FOR OTHER FUNCTIONS CULVERT REPLACEMENT AND RECONSTRUCT ROADcontract · Last action 2013-09-17$43,774
- Department of AgricultureIGF::OT::IGF FOR OTHER FUNCTIONS BUCKEYE RD 29 MP 0.21 REPAIRcontract · Last action 2014-10-15$28,890
- Department of AgricultureROAD CONSTRUCTION IDIQ - MIDDLE FORK GUARDRAIL REPLACEMENT. WORKPLAN: CWF2 FSRM18 COOP WORK OTHER ROAD MTC MR. WORKPLAN: CWF2 FSRM18 COOP WORK OTHER ROAD MTC MFcontract · Last action 2012-09-18$27,440
- Department of AgricultureUPPER ILLINOIS RIVER BRIDGE APPROACH REPAIR ON THE WILD RIVERS RANGER DISTRICT OF THE ROGUE RIVER-SISKIYOU NATIONAL FOREST.contract · Last action 2009-09-22$27,300
- Department of AgricultureERFO SITE 06-13-06, FOREST ROAD 3831, MILE POST 6.2contract · Last action 2008-08-14$18,043
- Department of AgricultureMIDDLE FORK APPLEGATE #2 BRIDGE TEMPORARY STRUCTURE, ROGUE RIVER-SISKIYOU NF (SOLICITATION NO. AG-04N7-S-15-0050, AMEND 1 DTD 7/23/15 AND REVISED SCHEDULE DATED 8/19/15) INDIVIDUAL PROJECT TASK ORDER AWARD IS BEING MADE FOR ITEM 57102 - DELIVER GOVERNMENT FURNISHED BRIDGE SUPERSTRUCTURE. THIS ITEM CONSISTS OF RETRIEVAL OF BRIDGE PARTS FROM THE GOVERNMENT FACILITIES, TRANSPORT OF ALL BRIDGE PARTS TO THE SITE INCLUDING TEMPORARY STORAGE AREAS AS NEEDED. SEE SECTION C-2-PROJECT LOCATION, G-9 GOVERNMENT-FURNISHED PROPERTY AND SPECIFICATION 571-PREFABRICATED BRIDGES FOR PROJECT LOCATIONS AND OTHER SPECIFICS. ERIC GRIM, PE, IS THE COR FOR THIS PROJECT. IGF::OT::IGFcontract · Last action 2015-08-27$17,680
- Department of AgricultureIGF::OT::IGF FOR OTHER FUNCTIONS REPLACEMENT OF BRIDGE RAILScontract · Last action 2014-09-22$15,850
- Department of AgricultureTASK ORDER FOR RD. 28, MP 8.5, CONSTRUCTION IDIQcontract · Last action 2007-10-15$14,936
- Department of AgricultureEMERGENCY GUARDRAIL/POST REMOVAL/REPLACEMENT SERVICES IN CONNECTION WITH HAZARD TREE REMOVAL ALONG HWY 138 FOR RATTLE FIRE BAER ACTIVITIEScontract · Last action 2009-04-16$5,233
- Department of AgricultureADDITIONAL WORK ERFO SITE 06-02-06contract · Last action 2008-06-26$4,435
- Department of AgricultureERFO SITE 06-02-06contract · Last action 2008-06-23$4,435
- Department of AgricultureBUCKHEAD MTN. ROAD 2814 MP 0.25contract · Last action 2007-12-17$3,360
- Department of AgricultureIGF::OT::IGF ROAD 1506 REPAIRScontract · Last action 2016-09-14$0
- Department of AgricultureMULTI-AGENCY ROAD CONSTRUCTION IDIQ IGF::OT::IGFcontract · Last action 2016-01-01$0
- Department of AgricultureMULTI-FOREST ROAD CONSTRUCTION IDIQcontract · Last action 2012-09-14$0
- Department of AgricultureIDIQ ROAD CONSTRUCTION AND RECONSTRUCTIONcontract · Last action 2009-08-31$0
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2017-11-06. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2012-09-20 | Planned | 1 | — | $0 | |
| 2011-06-08 | Planned | 2 | 1 | $210 | |
| 2010-06-24 | Planned | 0 | — | $0 | |
| 2003-02-12 | Planned | 3 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within OR, ordered by federal enforcement volume:
- LASKEY-CLIFTON CORPORATIONREEDSPORT — 3 federal enforcement records
- MID-VALLEY GRAVEL COMPANYPHILOMATH — 3 federal enforcement records
- LTM INCMEDFORD — 3 federal enforcement records
- KIEWIT PACIFIC COPORTLAND — 2 federal enforcement records
- JIM TURIN & SONS INCRHODODENDRON — 2 federal enforcement records
- LASKEY-CLIFTON CORPORATIONMYRTLE POINT — 2 federal enforcement records
- JAL CONSTRUCTION INCREDMOND — 2 federal enforcement records
- KNIFE RIVER CORPORATION NORTHWESTBEND — 2 federal enforcement records
- KERR CONTRACTORS INCTIGARD — 2 federal enforcement records
- KERR CONTRACTORS INCHAPPY VALLEY — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in ORState-wide enforcement data
- Highway, Street, and in ORIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on WEEKLY BROS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is WEEKLY BROS INC's OSHA violation history?
- WEEKLY BROS INC has 4 OSHA inspections on record with 6 violations and $210 in total penalties.
- How does WEEKLY BROS INC's safety record compare to its industry?
- WEEKLY BROS INC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.