Skip to main content

Establishment profile

WB CONSTRUCTION AND SONS

LA, 70634

Download as PDF →

OSHA inspections
0
Violations
0
Penalties
$0
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

WB CONSTRUCTION AND SONS has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 0 days ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

WB CONSTRUCTION AND SONS appears in UVA Corporate Prosecution Registry record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for WB CONSTRUCTION AND SONS. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for WB CONSTRUCTION AND SONS. Verify directly with OSHA Injury Tracking Application

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WB CONSTRUCTION AND SONS. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
0 days ago

Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for WB CONSTRUCTION AND SONS. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for WB CONSTRUCTION AND SONS. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for WB CONSTRUCTION AND SONS. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WB CONSTRUCTION AND SONS. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for WB CONSTRUCTION AND SONS. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

Prosecutions
1
Total payments
$96K
Disposition
Guilty Plea
Crime type
Fraud - General

First case: 2002-04-29. Most recent: 2002-04-29. Source: UVA Corporate Prosecution Registry — federal pleas, DPAs, and NPAs.

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$23.9M
Awards
37
Top agency
Department of Defense
$23.9M
Largest awards
  • Department of Defense
    FT POLK ROADS
    contract · Last action 2014-02-21
    $5,922,455
  • Department of Defense
    PAVE TEXAS AVE PHASE II
    contract · Last action 2012-08-02
    $2,766,091
  • Department of Defense
    FORT POLK AIRFIELD PAVING
    contract · Last action 2014-09-30
    $2,495,265
  • Department of Defense
    RE-SURFACE SELF AIRFIELD
    contract · Last action 2012-10-16
    $2,321,650
  • Department of Defense
    TEXAS AVE PHASE I
    contract · Last action 2012-09-18
    $1,935,328
  • Department of Defense
    REPAIR BASE FAILURE ACP 1, 2&12TH ST.
    contract · Last action 2012-06-29
    $1,196,691
  • Department of Defense
    GOLF COURSE RUNNING TRAIL REPAIR
    contract · Last action 2014-03-05
    $1,037,757
  • Department of Defense
    50 METER POOL PARKING LOT&ROAD UPGRADE
    contract · Last action 2013-04-23
    $693,591
  • Department of Defense
    DUST CONTROL (MISCELLANEOUS LINE ITEMS)
    contract · Last action 2013-01-28
    $599,999
  • Department of Defense
    WHISKEY-CHITTO ROADS
    contract · Last action 2012-09-29
    $562,005
  • Department of Defense
    THIS REQUIREMENT IS TO OVERLAY 1,400' OF YELLOW BRICK ROAD AND WIDEN SHOULDERS TO 2'
    contract · Last action 2014-02-13
    $544,621
  • Department of Defense
    DUST CONTROL USING WATER
    contract · Last action 2013-08-07
    $450,000
  • Department of Defense
    AAFES PARKING LOT&BK DRIVE THRU
    contract · Last action 2012-07-20
    $425,006
  • Department of Defense
    HOSPITAL MULTI-USE TRAIL
    contract · Last action 2014-03-05
    $397,419
  • Department of Defense
    BLDG 1166&CAV PARKING EROSION REPAIR
    contract · Last action 2012-09-27
    $375,773
  • Department of Defense
    STRIPING
    contract · Last action 2012-08-07
    $349,082
  • Department of Defense
    REPAIR APPROACH TO LWC 40
    contract · Last action 2012-09-26
    $342,462
  • Department of Defense
    REPAIR ROAD&PLACE LWC
    contract · Last action 2012-09-26
    $332,135
  • Department of Defense
    REPAIR SHOVING&DRAINAGE ON LOOKOUT RD
    contract · Last action 2012-07-11
    $249,999
  • Department of Defense
    REPAIR PARKING LOTS AND DRAINAGE
    contract · Last action 2012-09-20
    $237,345
  • Department of Defense
    REPAIR LWC 69&EROSION CONTROL
    contract · Last action 2012-07-20
    $183,762
  • Department of Defense
    THIS REQUIREMENT IS TO REPAIR MOTOR POOL BASE FAILURE.
    contract · Last action 2014-02-13
    $90,959
  • Department of Defense
    REPAIR AND REPLACE TWO RISERS
    contract · Last action 2012-09-27
    $62,122
  • Department of Defense
    WATER DUST CONTROL
    contract · Last action 2013-02-12
    $61,413
  • Department of Defense
    HOLLY SPRINGS ROAD
    contract · Last action 2013-05-03
    $52,649
  • Department of Defense
    MISCELLANEOUS LINE ITEMS
    contract · Last action 2013-02-07
    $49,999
  • Department of Defense
    THIS REQUIREMENT IS TO PROVIDE DUST CONTROL USING WATER FOR FORT POLK AND PEASON RIDGE AREA.
    contract · Last action 2014-01-23
    $48,618
  • Department of Defense
    REPAIR LWC 28&EROSION CONTROL
    contract · Last action 2012-09-27
    $37,797
  • Department of Defense
    REPAIR SEDIMENT BASIN OUTFLOW
    contract · Last action 2012-09-26
    $37,561
  • Department of Defense
    REPAIR RISER AT DMPBAC 19 AREA
    contract · Last action 2012-09-25
    $30,249
  • Department of Defense
    63 CORE SAMPLINGS AT MULTIPLE 11 LOCATIONS
    contract · Last action 2014-03-05
    $23,956
  • Department of Defense
    W.B. CONSTRUCTION BID OPENING PROTEST
    contract · Last action 2012-03-02
    $7,232
  • Department of Defense
    IGF::CT::IGF THIS REQUIREMENT IS FOR ISSUING A TASK ORDER FOR DUST CONTROL USING WATER
    contract · Last action 2014-11-26
    $1,152
  • Department of Defense
    SAFETY AND QC PLANS
    contract · Last action 2014-09-14
    $200
  • Department of Defense
    BASE PERIOD
    contract · Last action 2016-07-28
    $0
  • Department of Defense
    (BASE YEAR) - ROAD REPAIR, SUSTAINMENT
    contract · Last action 2014-02-27
    $0
  • Department of Defense
    BASE YEAR - ROADS&DRAINAGE IDIQ CONTRACT, FT. POLK, LA.
    contract · Last action 2012-03-28
    $0

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2016-07-28. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on WB CONSTRUCTION AND SONS from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is WB CONSTRUCTION AND SONS's OSHA violation history?
WB CONSTRUCTION AND SONS has no OSHA inspections on record.