Summary
VALLEY QUARRIES has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
VALLEY QUARRIES appears in MSHA mine safety record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for VALLEY QUARRIES. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for VALLEY QUARRIES. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for VALLEY QUARRIES. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for VALLEY QUARRIES. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in PA — for VALLEY QUARRIES, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other VALLEY QUARRIES operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 49S&S · 100 contractor · $63,206 proposed / $58,272 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8576229 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | May 2010 | — | Yes | HighNegligence | $3,900 | $3,900 |
| 6535209 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | Yes | ModNegligence | $3,689 | $3,689 |
| 6535206 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | Yes | HighNegligence | $3,689 | $3,689 |
| 6063590 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | Yes | HighNegligence | $3,143 | $2,106 |
| 6063589 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | Yes | HighNegligence | $3,143 | $2,106 |
| 8574401 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | Yes | ModNegligence | $2,473 | $2,473 |
| 6044881 | Williamson Quarry Franklin, PA contractor: Valley Quarries, Inc | Mar 2007 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 6044879 | Williamson Quarry Franklin, PA contractor: Valley Quarries, Inc | Mar 2007 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 6044883 | Williamson Quarry Franklin, PA contractor: Valley Quarries, Inc | Feb 2007 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 6531190 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 6056581 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2008 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 6020887 | SHIPPENSBURG QUARRY Cumberland, PA contractor: Valley Quarries Inc | Jul 2004 | — | Yes | HighNegligence | $1,300 | $1,300 |
| 6063584 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | Yes | HighNegligence | $1,203 | $687 |
| 6050148 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Aug 2007 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 8574402 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 6064911 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | LowNegligence | $1,111 | $150 |
| 6058298 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | HighNegligence | $1,111 | $601 |
| 6535202 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | No | HighNegligence | $873 | $873 |
| 6060183 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jan 2009 | — | No | HighNegligence | $807 | $807 |
| 6535203 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | No | HighNegligence | $745 | $745 |
| 6063596 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Nov 2008 | — | No | ModNegligence | $745 | $745 |
| 6063588 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | HighNegligence | $745 | $540 |
| 6063580 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | HighNegligence | $745 | $745 |
| 6057915 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Feb 2008 | — | No | HighNegligence | $687 | $687 |
| 6535201 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | Yes | LowNegligence | $585 | $585 |
| 6056582 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2008 | — | Yes | LowNegligence | $585 | $585 |
| 6064909 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | HighNegligence | $499 | $285 |
| 8574375 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Aug 2010 | — | Yes | ModNegligence | $460 | $460 |
| 8574372 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Aug 2010 | — | Yes | ModNegligence | $460 | $460 |
| 8574371 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Aug 2010 | — | Yes | ModNegligence | $460 | $460 |
| 8571589 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | Yes | ModNegligence | $460 | $460 |
| 6028988 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Apr 2007 | — | Yes | HighNegligence | $440 | $440 |
| 6008176 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jun 2004 | — | Yes | ModNegligence | $383 | $383 |
| 8572996 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $362 | $362 |
| 8572994 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $362 | $362 |
| 8572993 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $362 | $362 |
| 8572992 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $362 | $362 |
| 8570437 | SHIPPENSBURG QUARRY Cumberland, PA contractor: Valley Quarries Inc | Jan 2010 | — | No | HighNegligence | $362 | $362 |
| 6060039 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | May 2008 | — | Yes | ModNegligence | $362 | $362 |
| 6058824 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2008 | — | Yes | LowNegligence | $362 | $362 |
| 8574417 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | ModNegligence | $334 | $334 |
| 8574412 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | ModNegligence | $334 | $334 |
| 8572999 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | Yes | LowNegligence | $334 | $334 |
| 6535205 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | No | HighNegligence | $334 | $334 |
| 6063594 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Nov 2008 | — | No | LowNegligence | $334 | $334 |
| 6064905 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | HighNegligence | $334 | $153 |
| 6064903 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | ModNegligence | $334 | $334 |
| 6058300 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | ModNegligence | $334 | $334 |
| 6058299 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Sep 2008 | — | No | HighNegligence | $334 | $131 |
| 6046751 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | Jul 2007 | — | No | HighNegligence | $334 | $334 |
| 6036767 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jun 2006 | — | Yes | ModNegligence | $324 | $324 |
| 6036766 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jun 2006 | — | Yes | ModNegligence | $324 | $324 |
| 6036761 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | May 2006 | — | Yes | ModNegligence | $324 | $324 |
| 6036760 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | May 2006 | — | Yes | ModNegligence | $324 | $324 |
| 6535210 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | No | HighNegligence | $308 | $308 |
| 6056592 | Williamson Quarry Franklin, PA contractor: Valley Quarries, Inc | Apr 2008 | — | No | HighNegligence | $308 | $308 |
| 6058830 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2008 | — | No | HighNegligence | $308 | $308 |
| 6058829 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2008 | — | No | HighNegligence | $308 | $308 |
| 6058828 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2008 | — | No | HighNegligence | $308 | $308 |
| 6058827 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Apr 2008 | — | No | HighNegligence | $308 | $308 |
| 7738499 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Apr 2001 | — | Yes | ModNegligence | $277 | $207 |
| 6531200 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | No | ModNegligence | $263 | $263 |
| 6049153 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2007 | — | No | ModNegligence | $263 | $263 |
| 6050136 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Aug 2007 | — | No | ModNegligence | $263 | $263 |
| 8572991 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | ModNegligence | $243 | $243 |
| 6066584 | SHIPPENSBURG QUARRY Cumberland, PA contractor: Valley Quarries Inc | May 2009 | — | Yes | ModNegligence | $243 | $243 |
| 6060040 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | May 2008 | — | No | ModNegligence | $243 | $243 |
| 6057913 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jan 2008 | — | No | HighNegligence | $243 | $243 |
| 6036762 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | May 2006 | — | Yes | LowNegligence | $228 | $228 |
| 6036715 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jan 2006 | — | Yes | ModNegligence | $228 | $228 |
| 8574405 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $224 | $224 |
| 8572998 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $224 | $224 |
| 8572997 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Mar 2010 | — | No | LowNegligence | $224 | $224 |
| 6535421 | Mt. Cydonia Sand Plant I Franklin, PA contractor: Valley Quarries Inc | Jul 2009 | — | Yes | LowNegligence | $224 | $224 |
| 6535208 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Apr 2009 | — | No | ModNegligence | $224 | $224 |
| 6063597 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Nov 2008 | — | No | ModNegligence | $224 | $224 |
| 6063595 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Nov 2008 | — | No | ModNegligence | $224 | $224 |
| 6063587 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | ModNegligence | $224 | $224 |
| 6063586 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | ModNegligence | $224 | $224 |
| 6063585 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | ModNegligence | $224 | $224 |
| 6063582 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | ModNegligence | $224 | $224 |
| 6063581 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2008 | — | No | HighNegligence | $224 | $224 |
| 6057361 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | Apr 2008 | — | Yes | ModNegligence | $224 | $224 |
| 6049158 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2007 | — | No | ModNegligence | $224 | $224 |
| 6049157 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2007 | — | No | ModNegligence | $224 | $224 |
| 6049156 | Chambersburg Quarry Franklin, PA contractor: Valley Quarries Inc | Oct 2007 | — | No | ModNegligence | $224 | $224 |
| 6044855 | Mt. Cydonia Sand Plant I Franklin, PA contractor: Valley Quarries Inc | Mar 2007 | — | Yes | ModNegligence | $217 | $217 |
| 6007590 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | Oct 2003 | — | Yes | ModNegligence | $217 | $217 |
| 8576228 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | May 2010 | — | Yes | LowNegligence | $207 | $207 |
| 8576227 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | May 2010 | — | Yes | LowNegligence | $207 | $207 |
| 8576226 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | May 2010 | — | Yes | LowNegligence | $207 | $207 |
| 8576224 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | May 2010 | — | Yes | LowNegligence | $207 | $207 |
| 6050147 | Mt. Cydonia Sand Plant I Franklin, PA contractor: Valley Quarries Inc | Jul 2007 | — | Yes | ModNegligence | $207 | $207 |
| 6036714 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jan 2006 | — | No | ModNegligence | $207 | $207 |
| 6035095 | SHIPPENSBURG QUARRY Cumberland, PA contractor: Valley Quarries Inc | Jan 2006 | — | Yes | HighNegligence | $203 | $203 |
| 7749013 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | Dec 2001 | — | Yes | ModNegligence | $184 | $184 |
| 6036713 | Gettysburg Quarry Adams, PA contractor: Valley Quarries Inc | Jan 2006 | — | Yes | ModNegligence | $177 | $177 |
| 6034657 | MT CYDONIA SAND PLANT II Franklin, PA contractor: Valley Quarries Inc | Jan 2006 | — | Yes | HighNegligence | $177 | $177 |
| 6036755 | Fairfield Quarry Adams, PA contractor: Valley Quarries Inc | Apr 2006 | — | Yes | ModNegligence | $165 | $165 |
| 6005166 | MT CYDONIA SAND PLANT III Cumberland, PA contractor: Valley Quarries Inc | Jun 2005 | — | Yes | HighNegligence | $165 | $165 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for VALLEY QUARRIES. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for VALLEY QUARRIES. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for VALLEY QUARRIES. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for VALLEY QUARRIES. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of DefenseWIDEN MAINE AVEcontract · Last action 2011-03-03$273,670
- Department of the Interior3/4 AND 3/8 BROWN STONE AND BROWN BANK SANDcontract · Last action 2013-09-11$23,871
- Department of the InteriorBROWN STONE AND BANK SAND FOR TRAILScontract · Last action 2011-06-10$14,201
- Department of the InteriorBROWN LANDSCAPE STONE AND BANK SANDcontract · Last action 2009-10-27$12,670
- Department of DefenseSTONE 2RCcontract · Last action 2012-04-09$11,117
- Department of the InteriorGATE: INFIELD TOPPING - MILLER FIELDcontract · Last action 2010-03-31$10,350
- Department of the Interior1,000 TONS OF PA 2A STONEcontract · Last action 2012-07-23$8,940
- Department of DefenseSTONE 2RC, LIMESTONE 2B, RIP RAP R4,RIP RAP FILL R5, AND CONCRETE.contract · Last action 2012-09-05$8,228
- Department of the InteriorSTONEcontract · Last action 2009-07-22$8,073
- Department of DefenseANTI-SKID LIMESTONEcontract · Last action 2011-01-29$7,075
- Department of DefenseSTONE 2RCcontract · Last action 2012-07-26$6,400
- Department of DefenseCONCRETE READY MIX 4,000 PSIcontract · Last action 2012-03-07$5,832
- Department of the Interior3/4" BROWN GRAVEL AND BROWN BANK SAND.contract · Last action 2012-04-20$5,477
- Department of DefenseSAND (MASONRY)contract · Last action 2013-05-13$5,421
- Department of DefenseLIMESTONE ANTISKIDcontract · Last action 2011-08-04$5,296
- Department of DefenseCONCRETE 3,500 PSI CONCRETE, STONE 2RC AND LIMESTONE 2Bcontract · Last action 2012-03-08$5,230
- Department of DefenseSTONE 2RCcontract · Last action 2012-04-09$5,220
- Department of DefenseSTONE 2RCcontract · Last action 2012-11-27$5,038
- Department of DefenseLIMESTONE AND CONCRETEcontract · Last action 2012-06-14$5,002
- Department of DefenseCONCRETEcontract · Last action 2012-04-05$4,514
- Department of DefenseLIMESTONE ANTISKID, LEMCcontract · Last action 2012-04-09$4,451
- Department of DefenseLIMESTONE 2Bcontract · Last action 2012-05-17$4,420
- Department of DefenseSTONE 2RCcontract · Last action 2013-05-28$4,200
- Department of DefenseSTONE 2RCcontract · Last action 2012-06-13$4,000
- Department of DefenseSTONE 2RCcontract · Last action 2012-06-13$4,000
- Department of DefenseSTONE 2RCcontract · Last action 2012-06-01$4,000
- Department of DefenseSTONE 2RC, LIMESTONE 2B, AND STONE, AASSHTO.contract · Last action 2012-04-16$3,863
- Department of DefenseSTONE 2RCcontract · Last action 2013-05-01$3,826
- Department of DefenseCONCRETE 3,500 PSI CONCRETE AND LIMESTONE.contract · Last action 2012-11-06$3,822
- Department of DefenseSTONE 2RCcontract · Last action 2012-04-09$3,636
- Department of DefenseSTONE 2RCcontract · Last action 2013-05-01$3,360
- Department of DefenseSTONE 2RCcontract · Last action 2012-10-03$3,200
- Department of DefenseSTONE 2RCcontract · Last action 2012-04-16$3,200
- Department of DefenseCONCRETE 3,500 PSI CONCRETEcontract · Last action 2013-03-15$3,192
- Department of DefenseSTONE 2RCcontract · Last action 2012-03-08$2,940
- Department of DefenseSTONE 2RCcontract · Last action 2011-12-17$2,940
- Department of DefenseLIMESTONEcontract · Last action 2012-04-09$2,761
- Department of DefenseSTONE 2RCcontract · Last action 2011-09-17$2,388
- Department of DefenseSTONE 2RCcontract · Last action 2012-03-19$2,205
- Department of DefenseSTONE, AASHTO SPECS #1contract · Last action 2012-04-04$2,169
- Department of DefenseCONCRETE 3,500 PSI CONCRETE AND LIMESTONE.contract · Last action 2012-06-25$2,030
- Department of DefenseLIMESTONE 2Bcontract · Last action 2012-04-24$2,020
- Department of DefenseLIMESTONE NO. 10 DUSTcontract · Last action 2012-04-26$2,007
- Department of DefenseCONCRETE 3,500 PSI CONCRETEcontract · Last action 2012-04-09$1,995
- Department of DefenseSTONE 2RCcontract · Last action 2012-03-19$1,838
- Department of DefenseCONCRETEcontract · Last action 2011-09-17$1,683
- Department of DefenseCONCRETEcontract · Last action 2012-04-09$1,677
- Department of DefenseSTONE 2RCcontract · Last action 2012-11-06$1,600
- Department of DefenseSTONE 2RCcontract · Last action 2012-06-13$1,600
- Department of DefenseRIP RAP FILL R5contract · Last action 2011-09-17$1,460
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2013-09-11. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Related searches
- Employers in PAState-wide enforcement data
About this data
This profile aggregates federal enforcement records on VALLEY QUARRIES from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is VALLEY QUARRIES's OSHA violation history?
- VALLEY QUARRIES has no OSHA inspections on record.