Summary
TUCSON ELECTRIC POWER has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
TUCSON ELECTRIC POWER appears in MSHA mine safety, NLRB labor relations, and OFLC visa and labor certification (historical) records only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for TUCSON ELECTRIC POWER. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for TUCSON ELECTRIC POWER. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for TUCSON ELECTRIC POWER. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for TUCSON ELECTRIC POWER. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in AZ — for TUCSON ELECTRIC POWER, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other TUCSON ELECTRIC POWER operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 1 citation · 1 contractor · $100 proposed / $100 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6427984 | Freeport-McMoRan Sierrita Ops. Pima, AZ contractor: Tucson Electric Power Company | Jul 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in AZ — for TUCSON ELECTRIC POWER, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other TUCSON ELECTRIC POWER locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 5 cases · 4 ULP · 1 representation
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 28-RC-382261 | Representation election | Mar 2026 | Mar 2026 | Closed | Region 28, Phoenix, Arizona |
| 28-CA-317186 | Unfair labor practice | Apr 2023 | Nov 2025 | Closed | Region 28, Phoenix, Arizona |
| 28-CA-229167 | Unfair labor practice | Oct 2018 | Dec 2018 | Closed | Region 28, Phoenix, Arizona |
| 28-CA-149598 | Unfair labor practice | Apr 2015 | Apr 2015 | Closed | Region 28, Phoenix, Arizona |
| 28-CA-021484 | Unfair labor practice | Jul 2007 | Aug 2007 | Closed | Region 28, Phoenix, Arizona |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage. Historical data only: DOL ended OFLC Performance Data Disclosure publication in 2026, so the figures above reflect filings through the last ingested cycle and are not being refreshed. Treat as a historical snapshot, not a current signal.
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for TUCSON ELECTRIC POWER. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
TUCSON ELECTRIC POWER COMPANY 88 EAST BROADWAY BLVD. · TUCSON, AZ, 85701 | — | — | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for TUCSON ELECTRIC POWER. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of DefenseTHIS PROJECT INVOLVES PROVIDING ALL MATERIALS AND LABOR TO COMPLETE THE CONSTRUCTION OF THE PRIMARY ELECTRIC OVERHEAD POLE LINE CIRCUIT FOR ENERGY RESILIENCY AT DAVIS-MONTHAN AFB. THIS CONTRACT ACTION IS AN AWARD OFF GSA CONTRACT 47PA0724D0002.contract · Last action 2025-09-22$4,860,536
- Department of JusticeIGF::OT::IGF ESTIMATE FOR ELECTRICITY SERVICES FOR FY 14contract · Last action 2013-10-04$2,100,000
- Department of Veterans AffairsELECTRIC UTILITY SERVICEcontract · Last action 2019-10-01$2,015,000
- Department of JusticeIGF::OT::IGF ESTIMATE FOR ELECTRICITY SERVICES FOR FY 18contract · Last action 2017-10-10$1,920,000
- Department of JusticeIGF::OT::IGF ESTIMATE FOR ELECTRICITY SERVICES FOR FY 17contract · Last action 2016-10-24$1,920,000
- Department of JusticeIGF::OT::IGF ESTIMATE FOR ELECTRICITY SERVICES FOR FY 16contract · Last action 2015-10-07$1,920,000
- Department of JusticeFCC TUCSON ELECTRIC UTILITY SERVICE FY26 CONTRACT #47PA0724D0002contract · Last action 2026-04-14$1,877,915
- Department of JusticeFY23 P39/P4 TUCSON ELECTRIC POWERcontract · Last action 2023-10-30$1,847,191
- Department of JusticeIGF::OT::IGF ESTIMATE FOR ELECTRICITY SERVICES FOR FY 15contract · Last action 2015-12-04$1,739,231
- Department of JusticeIGF::OT::IGF ESTIMATE FOR ELECTRICITY SERVICES FOR FY19contract · Last action 2019-07-17$1,674,800
- Department of JusticeESTIMATE FOR ELECTRICITY FOR FY 2012contract · Last action 2012-10-30$1,613,684
- Department of JusticeEO14042 TEP FOR OCTOBER 01, 2021 - DECEMBER 03, 2021.contract · Last action 2022-09-08$1,592,441
- Department of JusticeELECTRIC UTILITY SERVICES FOR THE FEDERAL CORRECTIONAL COMPLEX TUCSON FOR FISCAL YEAR 08contract · Last action 2007-10-10$1,582,685
- Department of JusticeESTIMATE FOR ELECTRICITY SERVICES FOR FY20contract · Last action 2020-09-18$1,532,234
- Department of JusticeRP# 0001-21 ELECTRIC SUPPLY (OCTOBER 1, 2020 - SEPTEMBER 30, 2021)contract · Last action 2021-09-13$1,530,107
- Department of Justice151060 ELECTRICITY FOR FCC TUCSON FY-09contract · Last action 2009-09-22$1,482,461
- Department of Justice151003 ESTIMATE FOR ELECTRICITY FOR FY 2011contract · Last action 2010-10-04$1,475,397
- Department of Justice151060 ESTIMATE FOR ELECTRICITY SERVICES FOR FY 10contract · Last action 2009-10-05$1,466,491
- Department of StatePLANT ELECTRICITYcontract · Last action 2011-09-29$1,224,445
- Department of JusticeIGF::OT::IGF ESTIMATED ELECTRICAL USAGE FOR THE MONTHS OF OCTOBER 2012 THRU MARCH 2013.contract · Last action 2013-07-12$1,176,649
- Department of StateELECTRICITYcontract · Last action 2012-08-06$1,124,000
- Department of StateELECTRICITY SERVICE TO NOGALES WASTEWATER TREATMENT PLANT. IGF::OT::IGF.contract · Last action 2014-09-27$1,051,000
- Department of StateIGF::CT::IGF ELECTRIC SERVICES FOR NOGALES INTERNATIONAL WASTEWATER TREATMENT PLANT FOR PERIOD 10/1/12 THROUGH 09/30/13.contract · Last action 2014-06-26$1,033,980
- Department of JusticeFCC TUCSON ELECTRIC SERVICE FY25 3/1/25 - 9/30/25 CONTRACT # 47PA0724D0002contract · Last action 2025-08-25$996,645
- General Services AdministrationELECTRIC SERVICE, GSA BUILDINGS IN TUCSONcontract · Last action 2020-03-30$910,500
- Department of JusticeIGF::OT::IGF ESTABLISH ESTIMATE FOR ELECTRICAL SERVICES FOR FCC TUCSON FOR JUNE 6, 2013 THRU SEPTEMBER 30, 2013.contract · Last action 2013-07-12$600,000
- Department of Veterans AffairsUTILITIEScontract · Last action 2019-11-12$328,550
- Department of Veterans AffairsELECTRICAL SERVICE FY20contract · Last action 2020-07-13$303,625
- Department of Veterans AffairsEXPRESS REPORT: IGF::OT::IGF TO REPORT ELECTRIC EXPENDITURES FOR FY16 FOR TUCSON CMOP PAID ON 1358contract · Last action 2015-10-01$301,060
- Department of Veterans AffairsIGF::OT::IGF - SOLAR PHOTOVOLTAIC SYSTEM INTERCONNECTION EQUIPMENT INSTALLATION REQUIRED TO CONNECT SYSTEM TO THE ELECTRICAL GRID AT TUCSON VETERANS AFFAIRS MEDICAL CENTER.contract · Last action 2015-03-17$130,735
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2010-08-01$29,379
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2012-07-01$28,627
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2012-08-01$27,995
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2011-07-21$27,876
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2010-07-01$27,610
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2012-06-01$27,306
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2012-09-01$27,268
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2011-08-18$25,607
- Department of Veterans AffairsIGF::OT::IGF - ASSESSMENT OF THE USE OF A SITE TO SITE VPN FOR THE TRANSMISSION OF REAL-TIME SOLAR DATA TO TUCSON VA MEDICAL CENTER TO TUCSON ELECTRIC POWER (TEP). THE TRANSMISSION OF REAL-TIME DATA IS A REQUIREMENT OF THE INTERCONNECTION AGREEMENT BETWEEN TUCSON VAMC AND TEP.contract · Last action 2015-09-30$25,000
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2010-10-30$24,873
- Department of Veterans AffairsELECTRICITY - AUGUST 2008contract · Last action 2008-08-01$23,000
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2012-01-01$22,826
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2011-06-24$22,727
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2012-05-01$22,725
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2010-11-17$22,716
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2010-06-01$22,713
- Department of Veterans AffairsEXPRESS REPORTcontract · Last action 2011-11-22$21,260
- Department of Veterans AffairsELECTRICITY - SEPTEMBER 2008contract · Last action 2008-09-01$21,000
- Department of Veterans AffairsELECTRICITY - 2008contract · Last action 2008-07-01$21,000
- Department of Veterans AffairsELECTRICITY - JUNE 2008contract · Last action 2008-06-01$21,000
Federal contract dollars to this establishment. Primary NAICS: 221112 - FOSSIL FUEL ELECTRIC POWER GENERATION. Last action: 2026-04-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Related searches
- Employers in AZState-wide enforcement data
About this data
This profile aggregates federal enforcement records on TUCSON ELECTRIC POWER from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is TUCSON ELECTRIC POWER's OSHA violation history?
- TUCSON ELECTRIC POWER has no OSHA inspections on record.