Establishment profile
TOOL MASTERS INC.
2305 MISSOURI STREET, TUSCUMBIA, AL, 35674
332119 — Metal Crown, Closure, and Other Metal Stamping (except Automotive)
Summary
TOOL MASTERS INC. has accumulated 36 OSHA violations across 10 inspections over 41 years of recorded history, with $26,420 in total assessed penalties.
The establishment sits in the 100th percentile for violations within its industry-state peer group of 31 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 6 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
TOOL MASTERS INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
40% of inspections at this establishment produced violations, with 4 inspections producing serious-or-greater violations.
Peer comparison
Worse on violations than nearly every other employer in NAICS 3321 within AL. Peer group: 31 employers. This establishment has 36 OSHA violations; peer median is 8.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 24 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for TOOL MASTERS INC.. Verify directly with Occupational Safety and Health Administration →
OSHA accident events
Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.
| Date | Event | Injuries | Hospitalized | Fatalities | |
|---|---|---|---|---|---|
| Jan 14, 1987 | FRACTURE,MAINTENANCE,MACHINIST,BACK,CRUSHED,STRUCK BY,FALLING OBJECT,PUNCH PRESSFatality | 1 | — | 1 |
Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 6+ years. Most recent activity: 6 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for TOOL MASTERS INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for TOOL MASTERS INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for TOOL MASTERS INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for TOOL MASTERS INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for TOOL MASTERS INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for TOOL MASTERS INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseMETAL PARTS DELIVERY ORDER IN SUPPORT OF PM-CCS AND PINE BLUFF ARSENSAL.contract · Last action 2026-01-20$4,455,915
- Department of DefenseMETAL PARTS DELIVERY ORDER IN SUPPORT OF PM-CCS AND PINE BLUFF ARSENAL.contract · Last action 2026-01-20$2,976,796
- Department of DefenseDELIVERY ORDER FOR METALS PARTS IN SUPPORT OR GRENADE'S MISSION AT JMC. DELIVERY DATE SET FOR 09 SEPT 2022.contract · Last action 2022-09-29$2,791,516
- Department of DefenseDELIVERY ORDER FOR M8 INNER COVERS, OUTER COVERS, AND CONTAINERS IN SUPPORT M8 SMOKE POT METAL PARTS PROGRAM AT PINE BLUFF ARSENALcontract · Last action 2025-10-29$2,761,822
- Department of DefenseMETAL PARTS FROM TMI IN SUPPORT OF PBA.contract · Last action 2024-04-25$2,077,529
- Department of Defense200508!500166!2100!W52P1J!U.S. ARMY INDUSTRIAL OPERATIONS !W52P1J05C3012 !A!N! !N! ! !20050512!20060929!058644030!058644030!058644030!N!TOOL MASTERS, INC !2305 MISSOURI ST !TUSCUMBIA !AL!35674!77280!033!01!TUSCUMBIA !COLBERT !ALABAMA !+000000608052!N!N!000000608052!1330!GRENADES !A6 !AMMUNITION !000 !* !332993!E! !3! ! ! ! ! !20200930!B! ! !A! !A!U!J!2!003!K! !A!N!Z! ! !N!B!N!N! ! !A! !B!A!000!A!B!Y!A! ! ! ! ! !0001! !contract · Last action 2017-03-03$1,115,613
- Department of DefenseM18/M83 AND AN-M14 METAL PARTScontract · Last action 2018-09-19$1,024,473
- Department of DefensePURCHASE M8 SMOKE POT METAL PARTS.contract · Last action 2021-12-02$960,723
- Department of DefenseM18/M83 AND AN-M14 GRENADE METAL PARTScontract · Last action 2017-09-28$957,616
- Department of DefenseMETAL PARTS AND COMPONENTS FOR CANISTER GRENADES AT PINE BLUFF ARSENAL.contract · Last action 2025-10-29$940,705
- Department of DefenseM8 METAL PARTS KITS-ORDERING PERIOD 5contract · Last action 2012-10-22$872,480
- Department of DefenseM18/M83 AND AN-M14 METAL PARTScontract · Last action 2018-09-19$863,690
- Department of DefenseGREN MPTS, SET F/M18&M83, AN-M14contract · Last action 2018-09-19$823,299
- Department of DefenseDELIVERY ORDER 0009 METAL PARTScontract · Last action 2018-09-19$774,022
- Department of DefenseM8 SMOKE POT METAL PARTScontract · Last action 2015-01-21$759,127
- Department of DefensePURCHASE M18 AND M83 METAL PARTS.contract · Last action 2018-10-24$687,652
- Department of DefensePURCHASE M18/M83 METAL PARTS.contract · Last action 2020-05-18$674,975
- Department of DefenseM18/M83 METAL PARTScontract · Last action 2017-09-11$665,730
- Department of DefenseM18/M83 METAL PARTScontract · Last action 2016-02-17$594,335
- Department of DefenseM98 GAS COVERcontract · Last action 2022-05-04$591,396
- Department of DefenseM8 SMOKE POT METAL PARTScontract · Last action 2013-08-29$559,969
- Department of DefenseM8 SMOKE POT METAL PARTScontract · Last action 2016-03-11$469,060
- Department of DefenseM18 METAL PARTS DELIVERY ORDER 0002contract · Last action 2018-10-24$456,091
- Department of DefensePURCHASE M18 AND M83 METAL PARTS.contract · Last action 2018-10-24$430,784
- Department of DefenseM18/M83 GRENADE METAL PARTS SETS (TOP AND BODY)contract · Last action 2016-01-14$377,931
- Department of DefensePURCHASE M18/M83 METAL PARTS.contract · Last action 2019-12-19$369,929
- Department of DefenseMETAL PARTS KITS-PERIOD 3contract · Last action 2011-03-25$314,577
- Department of DefenseMETAL PARTS KITScontract · Last action 2010-06-02$311,649
- Department of DefenseM8 SMOKE POT METAL PARTScontract · Last action 2010-06-02$279,000
- Department of DefensePRODUCTION AND FIRST ARTICLE TEST SMOKE HAND GRENADE METAL PARTScontract · Last action 2019-09-25$266,509
- Department of DefenseTHE PURPOSE OF THIS DELIVERY ORDER IS TO PURCHASE 728 M8 SMOKE POT INNER COVER ASSEMBLIES, OUTER ASSEMBLIES, AND CONTAINERS FOR PINE BLUFF ARSENAL.contract · Last action 2021-02-03$142,790
- Department of DefenseM18/M83 TOPS AND BODIES METAL PARTS SETS - ADDITIONAL FY 10 REQUIREMENTScontract · Last action 2011-12-21$139,307
- Department of DefenseM18/M83 METAL PARTScontract · Last action 2011-12-21$117,397
- Department of DefenseM18 AND M83 GRENADE METAL PARTS SETScontract · Last action 2011-12-21$112,125
- Department of DefenseSUPPORT, PARACHUTE MAIN&DROGUEcontract · Last action 2012-01-23$102,528
- Department of DefenseM98 GAS COVERS AND M98 PARTICULATE COVERS FOR PINE BLUFF ARSENALcontract · Last action 2023-08-01$83,893
- Department of DefenseMETAL PARTS KITS-PERIOD 3contract · Last action 2010-05-12$81,654
- Department of DefensePURCHASE M18 AND M83 METAL PARTS.contract · Last action 2018-11-14$79,526
- Department of DefenseAN-M14 METALS PARTS DELIVERY OF TOPS&BODIES BY 9/28/2020contract · Last action 2020-06-29$77,892
- Department of DefenseMETAL PARTS FOR M18/M83, AND AN-M14contract · Last action 2017-09-29$38,783
- Department of DefenseM330 GRENADE TOPS AND BODIES IN SUPPORT OF PINE BLUFF ARSENAL AND M8/M18 GRENADE TOPS AND BODIES IN SUPPORT OF ABERDEEN PROVING GROUND.contract · Last action 2025-02-12$22,656
- Department of DefenseMETAL PARTS FOR M18/M83 SMOKE GRENADEcontract · Last action 2012-09-26$10,600
- Department of DefenseDELIVERY ORDER FOR METAL PARTS ITEMS IN SUPPORT OF PINE BLUFF ARSENAL GRENADE PROGRAM.contract · Last action 2023-03-17$7,290
- Department of DefenseM18/M83 GRENADE METAL PARTScontract · Last action 2016-01-14$2,975
- Department of DefenseMETAL PARTS FOR GRENADES IN SUPPORT OF PM-CCScontract · Last action 2025-09-24$0
- Department of DefenseM8 SMOKE POT METAL COMPONENTS IN SUPPORT OF PINE BLUFF ARSENALcontract · Last action 2025-09-24$0
- Department of DefenseSMOKE GRENADE METAL PARTS FOR PBA.contract · Last action 2023-08-07$0
- Department of DefenseM8 SMOKE POT METAL PARTScontract · Last action 2019-12-17$0
- Department of DefenseM18/M83 METAL PARTScontract · Last action 2018-10-09$0
- Department of DefenseM18/M83 AND AN-M14 GRENADE METAL PARTScontract · Last action 2018-06-05$0
Federal contract dollars to this establishment. Primary NAICS: 332993 - AMMUNITION (EXCEPT SMALL ARMS) MANUFACTURING. Last action: 2026-01-20. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2019-10-07 | Complaint | 0 | — | $0 | |
| 2015-05-19 | Complaint | 10 | 7 | $4,080 | |
| 2011-08-18 | Follow-up | 0 | — | $0 | |
| 2011-08-12 | Follow-up | 0 | — | $0 | |
| 2010-11-09 | Referral | 11 | 10 | $11,200 | |
| 2010-11-04 | Referral | 6 | 6 | $10,500 | |
| 1995-04-05 | Planned | 0 | — | $0 | |
| 1994-05-17 | Planned | 0 | — | $0 | |
| 1987-01-15 | Accident | 9 | 6 | $640 | |
| 1984-10-30 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in metal crown, closure, and other metal stamping (except automotive) within AL, ordered by federal enforcement volume:
- CHIPTEC, LLCDECATUR — 1 federal enforcement record
- WENZEL METAL SPINNING, INC.SCOTTSBORO — 1 federal enforcement record
- JCIM, LLCMC CALLA — 1 federal enforcement record
- SUPERIOR METAL PRODUCTSCULLMAN — 0 federal enforcement records
Related searches
- Metal Crown, Closure, and Other Metal Stamping (except Automotive)All employers in this industry
- Employers in ALState-wide enforcement data
- Metal Crown, Closure, in ALIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on TOOL MASTERS INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is TOOL MASTERS INC.'s OSHA violation history?
- TOOL MASTERS INC. has 10 OSHA inspections on record with 36 violations and $26,420 in total penalties.
- How does TOOL MASTERS INC.'s safety record compare to its industry?
- TOOL MASTERS INC. operates in the metal crown, closure, and other metal stamping (except automotive) industry. The industry average Total Recordable Incident Rate (TRIR) is 4.2. TOOL MASTERS INC.'s self-reported DART rate is 4.86 compared to an industry average of 2.5.
- Has TOOL MASTERS INC. had any workplace fatalities?
- Yes. Federal records show 1 fatality investigation involving TOOL MASTERS INC..