Establishment profile
THE BECHDON COMPANY, INC.
300 COMMERCE DRIVE, UPPER MARLBORO, MD, 20774
Summary
THE BECHDON COMPANY, INC. has accumulated 12 OSHA violations across 2 inspections over 33 years of recorded history, with $1,224 in total assessed penalties.
The establishment sits in the 93rd percentile for violations within its industry-state peer group of 38,476 employers. Inspection frequency runs at the 82nd percentile. The most recent enforcement activity was recorded 26 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
THE BECHDON COMPANY, INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 12 distinct standards shown · 12 citations in this view · $1,224 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0242 B | 1 | 1 | $437 | Sep 1993 | Sep 1993 |
| 29 CFR 1910.0215 B09 | 1 | 1 | $437 | Sep 1993 | Sep 1993 |
| 29 CFR 1910.0212 A01 | 1 | 1 | $350 | Sep 1993 | Sep 1993 |
| 29 CFR 1910.0132 F04 | 1 | 1 | — | Nov 1999 | Nov 1999 |
| 29 CFR 1910.0134 C02 | 1 | 1 | — | Nov 1999 | Nov 1999 |
| 29 CFR 1910.1200 F05 II | 1 | 1 | — | Nov 1999 | Nov 1999 |
| 29 CFR 1910.0107 B09 | 1 | 1 | — | Nov 1999 | Nov 1999 |
| 29 CFR 1910.0132 D02 | 1 | 1 | — | Nov 1999 | Nov 1999 |
| 29 CFR 1910.1200 F05 I | 1 | 1 | — | Nov 1999 | Nov 1999 |
| 29 CFR 1910.0037 Q02 | 1 | 1 | — | Sep 1993 | Sep 1993 |
| 29 CFR 1910.0037 Q01 | 1 | 1 | — | Sep 1993 | Sep 1993 |
| 29 CFR 1910.0101 B | 1 | 1 | — | Sep 1993 | Sep 1993 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers. Peer group: 38,476 employers. This establishment has 12 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for THE BECHDON COMPANY, INC.. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for THE BECHDON COMPANY, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 26+ years. Most recent activity: 26 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for THE BECHDON COMPANY, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for THE BECHDON COMPANY, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for THE BECHDON COMPANY, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for THE BECHDON COMPANY, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for THE BECHDON COMPANY, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for THE BECHDON COMPANY, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2015-04-07$2,024,972
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2011-04-27$1,465,873
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2012-05-02$1,412,929
- National Aeronautics and Space AdministrationIGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.contract · Last action 2020-04-22$1,394,845
- National Aeronautics and Space AdministrationSB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE&SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT&NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS.contract · Last action 2025-05-13$667,153
- Smithsonian InstitutionFABRICATION OF SPECTROGRAPH SUPPORT STRUCTURE ASSEMBLYcontract · Last action 2010-09-30$495,845
- Smithsonian InstitutionFABRICATION AND DELIVERY OF LENS MOUNT ASSEMBLYIES FOR BINOSPEC SPECTROGRAPHcontract · Last action 2011-04-29$493,830
- Smithsonian InstitutionMACHINE SHOPcontract · Last action 2011-09-28$469,940
- Department of DefenseSLAM ER DUMMY AIR TRAINING MISSILEScontract · Last action 2009-08-03$468,747
- National Aeronautics and Space AdministrationVENDOR TO SUPPLY INSPECTION REPORTS, SHOP ROUTERS, MATERIALS, DRAWINGS, FRACTURE CRITICAL HARDWARE, NDE IS REQUIRED AND VENDOR CERTIFICATE OF CONFORMANCE, MATERIAL CHEMICAL AND PHYSICAL REPORTS AND DELIVERED ITEMS.contract · Last action 2008-09-23$404,048
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2009-06-30$308,524
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2014-08-15$304,681
- Department of CommerceMACHINE PARTS - VACUUM JACKETScontract · Last action 2014-10-08$147,935
- Department of DefenseMACHINING MATERIALcontract · Last action 2014-01-06$135,525
- National Aeronautics and Space AdministrationVENDOR TO SUPPLY INSPECTION REPORTS, SHOP ROUTERS, MATERIALS, DRAWINGS, FRACTURE CRITICAL HARDWARE, NDE IS REQUIRED AND VENDOR CERTIFICATE OF CONFORMANCE, MATERIAL CHEMICAL AND PHYSICAL REPORTS AND DELIVERED ITEMS.contract · Last action 2008-07-14$132,450
- Department of CommerceMACHINE PARTScontract · Last action 2014-05-30$131,005
- National Aeronautics and Space AdministrationFABRICATION BLANKET PURCHASE AGREEMENTcontract · Last action 2009-07-14$130,669
- Department of DefenseINSULATOR RINGScontract · Last action 2011-09-22$126,750
- Department of CommerceMACHINING OF PARTS FOR NCNRcontract · Last action 2014-05-29$119,975
- Department of CommerceMACHINING OF PARTScontract · Last action 2014-05-30$118,539
- Department of CommerceMACHINE PARTS - VACUUMcontract · Last action 2014-05-29$116,455
- Department of CommerceMACHINING OF PARTS - VACUUM JACKETScontract · Last action 2014-05-29$113,680
- Department of CommerceCANDOR CRYOGENIC DETECTOR PROTOTYPE 1 PARTScontract · Last action 2018-09-12$100,127
- Department of DefenseFABRICATED ACOUSTIC ITEMScontract · Last action 2009-09-09$91,024
- Smithsonian InstitutionBASE CART MACHINING FOR INSTRUMENT SUPPORT STRUCTUREcontract · Last action 2010-12-23$90,700
- Department of DefenseBURST DIAPHRAGMS-STAINLESS STEELcontract · Last action 2008-02-20$84,000
- Department of CommerceVACUUM JACKETS - MACHINING OF PARTScontract · Last action 2014-05-30$82,064
- National Aeronautics and Space AdministrationINNER HEMISPHERE INSULATORcontract · Last action 2021-06-11$81,650
- National Aeronautics and Space AdministrationIGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.contract · Last action 2017-11-01$77,294
- Smithsonian InstitutionLENS HOUSINGS; MACHINE SHOPcontract · Last action 2012-07-23$74,530
- Department of DefenseLENS SUPPORT BEAMcontract · Last action 2015-09-30$66,540
- Department of CommerceFABRICATION OF PARTS FOR SHIM ARM DRIVEcontract · Last action 2014-01-09$62,975
- Department of CommerceMACHINE PARTS FOR THE NCNRcontract · Last action 2014-05-29$51,895
- Smithsonian InstitutionMACHINING OF FOLD MIRROR ASSEMBLYcontract · Last action 2012-08-22$49,965
- Department of DefensePROGRAM REVIEW AND AUDITcontract · Last action 2008-10-21$49,800
- Department of DefenseLENS SUPPORT BEAMcontract · Last action 2014-08-15$48,550
- Department of DefenseMCM-100 ASSEMBLIEScontract · Last action 2008-05-29$48,375
- Department of CommerceMACHINE PARTScontract · Last action 2010-05-20$46,000
- Department of DefenseDIODE RIM AND RINGScontract · Last action 2011-09-26$45,460
- Department of CommerceMACHINE PARTS FOR THE NCNRcontract · Last action 2014-05-29$44,990
- Department of DefenseFINISH UMM RINGcontract · Last action 2010-08-06$41,960
- Department of DefenseSERVICEScontract · Last action 2009-08-21$40,795
- Smithsonian InstitutionFABRICATION OF TOP COVER FOR BINOSPEC PROJECTcontract · Last action 2011-11-04$39,750
- Department of CommerceIGF::OT::IGF BUELL MAP ENCASEMENT FABRICATIONcontract · Last action 2014-05-23$38,160
- National Aeronautics and Space AdministrationALIGNMENT BLOCKcontract · Last action 2009-09-28$37,800
- Department of DefenseMACHINED PARTScontract · Last action 2010-11-15$33,255
- Department of DefenseDETECTOR PLATEcontract · Last action 2008-09-26$33,173
- Department of DefenseRFQ 91066 - ONE RATCHET AMMO LIFT ASSEMBLYcontract · Last action 2009-08-27$32,800
- Smithsonian InstitutionBINOSPEC CART MACHINING AND ASSEMBLYcontract · Last action 2011-04-29$30,870
- Department of DefenseRFQ 91035 - ONE M9 ACE VISION SYSTEMcontract · Last action 2009-08-27$29,998
Federal contract dollars to this establishment. Primary NAICS: 332999 - ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING. Last action: 2025-05-13. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1999-08-31 | Planned | 6 | — | $0 | |
| 1993-07-19 | Planned | 6 | 3 | $1,224 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in MDState-wide enforcement data
About this data
This profile aggregates federal enforcement records on THE BECHDON COMPANY, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is THE BECHDON COMPANY, INC.'s OSHA violation history?
- THE BECHDON COMPANY, INC. has 2 OSHA inspections on record with 12 violations and $1,224 in total penalties.