Skip to main content

Establishment profile

SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS

MT, 59404
EIN 810401026

Download as PDF →

OSHA inspections
0
Violations
0
Penalties
$0
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 0 days ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS appears in MSHA mine safety and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
TRIR
0.0
vs industry

Reported for 35 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
0 days ago

Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in MT — for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS, not this location alone

Violations
106
Assessed penalties
$11,128

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 27S&S · $10,783 proposed / $10,265 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
8935610
STE Crushing Spread #1
Cascade, MT
Dec 2015YesModNegligence$263$263
6456994
STE Crushing Spread #2
Cascade, MT
Jan 2010YesModNegligence$243$243
6456991
STE Crushing Spread #1
Cascade, MT
Jan 2010YesModNegligence$243$243
6270679
STE Crushing Spread #1
Cascade, MT
Aug 2003NoModNegligence$152$73
5052792
STE Crushing Spread #1
Cascade, MT
Aug 2025NoModNegligence$151$151
5052791
STE Crushing Spread #1
Cascade, MT
Aug 2025NoModNegligence$151$151
5052790
STE Crushing Spread #1
Cascade, MT
Aug 2025NoLowNegligence$151$151
9828500
STE Crushing Spread #2
Cascade, MT
Mar 2025NoModNegligence$151$151
9828499
STE Crushing Spread #2
Cascade, MT
Mar 2025NoModNegligence$151$151
9828498
STE Crushing Spread #2
Cascade, MT
Mar 2025NoModNegligence$151$151
9828497
STE Crushing Spread #2
Cascade, MT
Mar 2025NoLowNegligence$151$151
5052704
STE Crushing Spread #2
Cascade, MT
Mar 2025NoLowNegligence$151$151
5052703
STE Crushing Spread #2
Cascade, MT
Mar 2025NoModNegligence$151$151
5052702
STE Crushing Spread #2
Cascade, MT
Mar 2025NoModNegligence$151$151
5052701
STE Crushing Spread #2
Cascade, MT
Mar 2025NoModNegligence$151$151
9653198
STE Crushing Spread #1
Cascade, MT
Jun 2022NoModNegligence$133$133
9652715
STE Crushing Spread #1
Cascade, MT
Apr 2021NoModNegligence$125$125
6270675
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$123$63
6270670
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$123$63
6270669
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$123$63
9308106
STE Crushing Spread #1
Cascade, MT
Jul 2019NoModNegligence$121$121
9308083
STE Crushing Spread #2
Cascade, MT
Jun 2019NoLowNegligence$121$121
9307481
STE Crushing Spread #2
Cascade, MT
Jul 2018NoModNegligence$118$118
9307480
STE Crushing Spread #2
Cascade, MT
Jul 2018NoLowNegligence$118$118
9307479
STE Crushing Spread #2
Cascade, MT
Jul 2018NoLowNegligence$118$118
9307478
STE Crushing Spread #2
Cascade, MT
Jul 2018NoModNegligence$118$118
9307477
STE Crushing Spread #2
Cascade, MT
Jul 2018NoModNegligence$118$118
9307433
STE Crushing Spread #1
Cascade, MT
Mar 2018NoModNegligence$118$118
9307432
STE Crushing Spread #1
Cascade, MT
Mar 2018NoModNegligence$118$118
6458199
STE Crushing Spread #1
Cascade, MT
Apr 2011NoLowNegligence$117$100
9306172
STE Crushing Spread #1
Cascade, MT
Jul 2017NoModNegligence$116$116
9306171
STE Crushing Spread #1
Cascade, MT
Jul 2017NoModNegligence$116$116
9306080
STE Crushing Spread #2
Cascade, MT
Mar 2017NoModNegligence$116$116
9306079
STE Crushing Spread #2
Cascade, MT
Mar 2017NoLowNegligence$116$116
9306078
STE Crushing Spread #2
Cascade, MT
Mar 2017NoModNegligence$116$116
9306077
STE Crushing Spread #2
Cascade, MT
Mar 2017NoModNegligence$116$116
9306076
STE Crushing Spread #2
Cascade, MT
Mar 2017YesModNegligence$116$116
9306075
STE Crushing Spread #2
Cascade, MT
Mar 2017YesModNegligence$116$116
8943877
STE Crushing Spread #1
Cascade, MT
Nov 2016NoModNegligence$114$114
8943876
STE Crushing Spread #1
Cascade, MT
Nov 2016NoModNegligence$114$114
8943875
STE Crushing Spread #1
Cascade, MT
Nov 2016YesModNegligence$114$114
8943874
STE Crushing Spread #1
Cascade, MT
Nov 2016NoModNegligence$114$114
8943873
STE Crushing Spread #1
Cascade, MT
Nov 2016YesModNegligence$114$114
8935611
STE Crushing Spread #1
Cascade, MT
Dec 2015NoModNegligence$112$112
8831960
STE Crushing Spread #1
Cascade, MT
Nov 2014YesModNegligence$108$108
6456903
STE Crushing Spread #1
Cascade, MT
Sep 2009YesModNegligence$108$108
8935609
STE Crushing Spread #1
Cascade, MT
Dec 2015NoModNegligence$100$100
8935608
STE Crushing Spread #1
Cascade, MT
Dec 2015NoModNegligence$100$100
8831962
STE Crushing Spread #1
Cascade, MT
Nov 2014NoModNegligence$100$100
8831961
STE Crushing Spread #1
Cascade, MT
Nov 2014NoModNegligence$100$100
8762372
STE Crushing Spread #2
Cascade, MT
Mar 2014NoModNegligence$100$100
8762371
STE Crushing Spread #1
Cascade, MT
Mar 2014NoModNegligence$100$100
8762370
STE Crushing Spread #1
Cascade, MT
Mar 2014NoModNegligence$100$100
8758418
STE Crushing Spread #2
Cascade, MT
Jun 2013NoLowNegligence$100$100
8749194
STE Crushing Spread #1
Cascade, MT
May 2013NoModNegligence$100$100
8749193
STE Crushing Spread #1
Cascade, MT
May 2013NoModNegligence$100$100
8758419
STE Crushing Spread #2
Cascade, MT
Jul 2012NoModNegligence$100$100
6592804
STE Crushing Spread #2
Cascade, MT
Apr 2011NoModNegligence$100$100
6592803
STE Crushing Spread #2
Cascade, MT
Apr 2011NoModNegligence$100$100
6592802
STE Crushing Spread #1
Cascade, MT
Apr 2011NoModNegligence$100$100
6592801
STE Crushing Spread #1
Cascade, MT
Apr 2011YesModNegligence$100$100
6458200
STE Crushing Spread #1
Cascade, MT
Apr 2011NoModNegligence$100$100
6456996
STE Crushing Spread #2
Cascade, MT
Jan 2010NoModNegligence$100$100
6456995
STE Crushing Spread #2
Cascade, MT
Jan 2010NoModNegligence$100$100
6456993
STE Crushing Spread #1
Cascade, MT
Jan 2010YesModNegligence$100$100
6456992
STE Crushing Spread #1
Cascade, MT
Jan 2010YesModNegligence$100$100
6456990
STE Crushing Spread #1
Cascade, MT
Jan 2010NoModNegligence$100$100
6456907
STE Crushing Spread #1
Cascade, MT
Sep 2009NoModNegligence$100$100
6456906
STE Crushing Spread #2
Cascade, MT
Sep 2009NoModNegligence$100$100
6456905
STE Crushing Spread #2
Cascade, MT
Sep 2009NoModNegligence$100$100
6456904
STE Crushing Spread #1
Cascade, MT
Sep 2009NoModNegligence$100$100
6417968
STE Crushing Spread #1
Cascade, MT
Jul 2008NoLowNegligence$100$100
6417967
STE Crushing Spread #1
Cascade, MT
Jul 2008YesModNegligence$100$100
6269065
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$98$60
6269061
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$98$60
7904668
STE Crushing Spread #1
Cascade, MT
May 2000YesModNegligence$97$69
7904669
STE Crushing Spread #1
Cascade, MT
Apr 2000YesModNegligence$90$64
7904667
STE Crushing Spread #1
Cascade, MT
Apr 2000YesModNegligence$90$64
7904666
STE Crushing Spread #1
Cascade, MT
Apr 2000YesModNegligence$90$64
6270672
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$72$60
6269067
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$72$60
6269059
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$72$60
6269056
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$72$60
6269055
STE Crushing Spread #1
Cascade, MT
Jul 2003YesModNegligence$72$60
6324509
STE Crushing Spread #1
Cascade, MT
Feb 2007NoLowNegligence$60$60
6324508
STE Crushing Spread #1
Cascade, MT
Feb 2007NoLowNegligence$60$60
6324507
STE Crushing Spread #1
Cascade, MT
Feb 2007NoLowNegligence$60$60
6322824
STE Crushing Spread #2
Cascade, MT
Sep 2005NoModNegligence$60$60
6270682
STE Crushing Spread #1
Cascade, MT
Aug 2003NoModNegligence$60$60
6270681
STE Crushing Spread #1
Cascade, MT
Aug 2003NoModNegligence$60$60
6270694
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6270677
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6270674
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6270673
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6270671
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6269068
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6269064
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6269063
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6269062
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60
6269060
STE Crushing Spread #1
Cascade, MT
Jul 2003NoModNegligence$60$60

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
322051
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$29.4M
Obligated (all-time)
$67.4M
Awards
59
Top agency
Department of Transportation
$49.3M
Top agencies by obligation (this location)
Department of Transportation$49.3M
Department of Defense$14.3M
Department of Agriculture$3.3M
Department of the Interior$445K
Largest awards (top 50 of 59)
  • Department of Transportation
    FUNDS CONSTRUCTION CONTRACT: MT DAR MALM 2024(1), DEFENSE ACCESS ROADS FY 2024. WORK INCLUDES ROADWAY RECONDITIONING, AGGREGATE SURFACING, AGGREGATE STABILIZATION, SUBEXCAVATION, AND DRAINAGE IMPROVEMENTS.
    contract · Last action 2025-07-01
    $8,635,472
  • Department of Transportation
    MT DAR MALM 2023(1), DEFENSE ACCESS ROADS FY 2023. THIS PROJECT IS IN HARLOWTON MT AND CONSISTS OF ROADWAY RECONDITIONING, AGGREGATE SURFACING, STABILIZATION AND DRAINAGE IMPROVEMENTS.
    contract · Last action 2025-03-28
    $8,237,263
  • Department of Transportation
    MT DAR 2022(1), DEFENSE ACCESS ROADS FY 2022
    contract · Last action 2025-03-24
    $7,114,433
  • Department of Transportation
    IGF::CT::IGF MT DOD 16(54), MINUTEMAN MISSILE BASE ROADS
    contract · Last action 2019-08-23
    $6,656,988
  • Department of Transportation
    IGF::CT::IGF MT DAR 18(52) MINUTEMAN MISSILE BASE ROADS
    contract · Last action 2017-02-02
    $6,209,159
  • Department of Transportation
    MT DAR 2018(1), DEFENSE ACCESS ROADS FY 2018
    contract · Last action 2021-09-10
    $5,828,646
  • Department of Transportation
    MT DAR 2019(1), DEFENSE ACCESS ROADS FY 2019 _ MT TETON 144(1), NORTH FORK PROJECT
    contract · Last action 2022-02-01
    $4,748,141
  • Department of Defense
    REPAIR DRAINAGE AND OUTFALLS. THIS PROJECT CONSISTS OF REPLACEMENT AND REPAIR OF STORM DRAINAGE RELATED FACILITIES AT VARIOUS STORMWATER OUTFALLS AT MALMSTROM AFB, MT.
    contract · Last action 2025-09-29
    $3,510,640
  • Department of Agriculture
    IGF::OT::IGF WARM SPRINGS CREEK PHASE 1 RECLAMATION
    contract · Last action 2017-04-25
    $1,319,304
  • Department of Transportation
    IGF::CT::IGF MT DAR 15(2), DEFENSE ACCESS ROAD BY MILE STANFORD
    contract · Last action 2017-01-10
    $1,160,000
  • Department of Defense
    ROAD IMPROVEMENTS
    contract · Last action 2019-04-24
    $1,081,939
  • Department of Agriculture
    CATARACT SMALL MINES PHASE IIIRECLAMATION OF THE MORNING GLORY TAILINGS, SIRIUS, AND CRACKER MINE
    contract · Last action 2011-01-12
    $967,482
  • Department of Defense
    ACCESS ROAD WSA
    contract · Last action 2013-09-27
    $927,990
  • Department of Transportation
    MT OMAD 18(42) MINUTEMAN MISSILE BASE ROADS
    contract · Last action 2010-02-11
    $908,553
  • Department of Defense
    MOFLOOD- FORT PECK RIPRAP. PROJECT #336737
    contract · Last action 2011-12-21
    $879,206
  • Department of Defense
    THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND INCIDENTALS NECESSARY FOR THE COMPLETE DEMOLITION OF DORM 631 INCLUDING BUILDING UTILITIES, ADJACENT SIDEWALKS, AND FOUNDATION FOR DISPOSAL OFF SITE.
    contract · Last action 2025-09-25
    $872,232
  • Department of Defense
    SRT - CIVIL - DRAA FP RIP RAP STOCKPILE; PROJECT NO.: 372971
    contract · Last action 2012-09-24
    $795,163
  • Department of Agriculture
    ROAD RECONSTRUCTION-MEMORIAL WAY #487--PHASE 1, STAGE 2B
    contract · Last action 2017-04-10
    $666,442
  • Department of Defense
    Q-0 KNOW QUANTITY WORK REQUIRED
    contract · Last action 2009-08-06
    $558,549
  • Department of Defense
    DEMO OF BUILDING 1150, TO INCLUDE ROADWAY IMPROVEMENTS, SITE UTILITY ABANDONMENT, AND DESIGN/INSTALLATION OF UNDERGROUND IRRIGATION SYSTEM WITH SEED/GRASS.
    contract · Last action 2019-10-30
    $480,927
  • Department of Defense
    PURCHASE OF AGGREGATE EARTHWORK MATERIALS.
    contract · Last action 2022-06-23
    $465,537
  • Department of Defense
    REPAIR DORM PARKING LOT 762 & 735
    contract · Last action 2011-04-14
    $455,017
  • Department of the Interior
    CONTRACTOR SHALL FURNISH ALL EQUIPMENT, TRANSPORTATION , AND LABOR NECESSARY TO FURNISH AND DELIVER 3/4" FRACTURED ROAD MIX GRAVEL ( MONTANA DOT GRADATION FOR CRUSHED TOP SURFACING TYPE "A" GRADE 2) . CONTRACTOR SHALL DELIVER ROAD MIX AND BELLY DUMP ON AREAS DESIGNATED BY REFUGE STAFF ALONG THE AUTO TOUR ROUTE ( HIGHLIGHTED IN YELLOW OF ATTACHED MAP OF BENTON LAKE NWR, MONTANA.) SCHEDULED DELIVERIES WILL BE COORDINATED WITH REFUGE STAFF AND NOT ALL QUANTITIES REQUIRED BY THIS CONTRACT WILL BE DELIVERED AT ONE TIME. REFUGE STAFF US FWS EMPLOYEES WILL SPREAD THE GRAVEL. TOTAL QUANTITIES (31,000 TONS) REQUIRED BY RESULTANT CONTRACT SHALL BE DELIVERED AS COORDINATED BY THE REFUGE STAFF WITHIN 90 DAYS AFTER AWARD OF CONTRACT.
    contract · Last action 2015-11-12
    $445,160
  • Department of Defense
    IGF::OT::IGF CABLE EROSION/CONDUIT REPAIR
    contract · Last action 2015-01-30
    $424,740
  • Department of Defense
    FY12 HICS BORING
    contract · Last action 2015-01-30
    $420,247
  • Department of Agriculture
    DEADMAN/MEMORIAL WAY ROADS RECONSTRUCTION, PHASE 1
    contract · Last action 2014-10-03
    $396,412
  • Department of Defense
    C - FORT PECK ROCK SUPPLY CALL ORDER RIPRAP
    contract · Last action 2011-09-30
    $373,658
  • Department of Defense
    SRT-CIVIL 12"-18" FIELD STONE RIPRAP SUPPLY; PROJECT NO. 372971
    contract · Last action 2012-04-26
    $273,650
  • Department of Defense
    DEMOLITION OF BUILDING 1705 AT MALMSTROM AIR FORCE BASE, MONTANA.
    contract · Last action 2023-03-22
    $257,742
  • Department of Defense
    IGF::OT::IGF CABLE EROSION/CONDUIT REPAIR
    contract · Last action 2014-07-02
    $248,935
  • Department of Defense
    IGF::OT::IGF- DIRECTIONAL BORE CABLE REPAIR
    contract · Last action 2016-05-23
    $225,672
  • Department of Defense
    DIRECTIONAL BORE COBBLE 4 CONDUIT
    contract · Last action 2018-03-23
    $205,070
  • Department of Defense
    341 MW MISSILE HICS CABLE EROSION/CONDUIT REPAIR- TASK ORDER 2
    contract · Last action 2021-04-09
    $162,077
  • Department of Defense
    3/4" MINUS ROAD MATERIAL
    contract · Last action 2017-10-24
    $145,575
  • Department of Defense
    K _C8 A DIRECTIONAL BORE
    contract · Last action 2015-02-11
    $126,282
  • Department of Defense
    HICS BORING - CONDUIT REPAIR AND REPLACEMENT WORK IN THE MALMSTROM AFB MISSILE COMPLEX
    contract · Last action 2019-08-07
    $125,696
  • Department of Defense
    MISSILE COMPLEX CABLE EROSION/CONDUIT REPAIR - TASK ORDER 5
    contract · Last action 2023-07-24
    $123,195
  • Department of Defense
    IGF::OT::IGF HICS CABLE BORINGS IDIQ
    contract · Last action 2017-06-14
    $105,823
  • Department of Defense
    HICS CABLE BORING IDIQ
    contract · Last action 2018-01-30
    $104,084
  • Department of Defense
    MISSILE COMPLEX CABLE EROSION/CORROSION REPAIR - TASK ORDER 6
    contract · Last action 2024-05-09
    $100,434
  • Department of Defense
    ASPHALT/CONCRETE CRUSHING
    contract · Last action 2011-07-19
    $99,497
  • Department of Defense
    341 MW MISSILE HICS CABLE EROSION/CONDUIT REPAIR - TASK ORDER 04
    contract · Last action 2022-06-06
    $94,963
  • Department of Defense
    WASTECONCRETE REMOVAL FROM MALMSTROM AFB
    contract · Last action 2008-10-21
    $89,000
  • Department of Defense
    HICS BORING - CONDUIT REPAIR AND REPLACEMENT WORK IN THE MALMSTROM AFB MISSILE COMPLEX
    contract · Last action 2020-02-07
    $82,642
  • Department of Defense
    IGF::OT::IGF DIRECTIONAL BORE COBBLE 4 INCH CONDUIT
    contract · Last action 2016-03-28
    $76,354
  • Department of Defense
    CONTAMINATED SOIL REMOVAL SERVICES
    contract · Last action 2025-01-28
    $64,406
  • Department of Defense
    HICS BORING/EROSION, TASK ORDER 1 FOR MALMSTROM AFB.
    contract · Last action 2020-09-10
    $59,497
  • Department of Defense
    341 MW MISSILE CABLE EROSION/CONDUIT REPAIR
    contract · Last action 2025-03-05
    $48,746
  • Department of Defense
    341 MW MISSILE HICS CABLE EROSION/CONDUIT REPAIR- TASK ORDER 3
    contract · Last action 2021-05-24
    $48,181
  • Department of Defense
    DIRECTIONAL BORE COBBLE 4 CONDUIT
    contract · Last action 2018-09-14
    $47,455

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2025-09-29. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS's OSHA violation history?
SHUMAKER TRUCKING AND EXCAVATING CONTRACTORS has no OSHA inspections on record.