Skip to main content

Establishment profile

SHORT POWERLINE SERVICE

WY, 82637

Download as PDF →

OSHA inspections
0
Violations
0
Penalties
$0
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

SHORT POWERLINE SERVICE has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 0 days ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

SHORT POWERLINE SERVICE appears in NLRB labor relations and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for SHORT POWERLINE SERVICE. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for SHORT POWERLINE SERVICE. Verify directly with OSHA Injury Tracking Application

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SHORT POWERLINE SERVICE. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
0 days ago

Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for SHORT POWERLINE SERVICE. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for SHORT POWERLINE SERVICE. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

Company-level in WY — for SHORT POWERLINE SERVICE, not this location alone

Total cases
2
Unfair labor practice
1
Representation (union)
1

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SHORT POWERLINE SERVICE locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 1 ULP · 1 representation

Case numberTypeFiledClosedStatusRegion
27-RC-347151Representation electionJul 2024Apr 2025ClosedRegion 27, Denver, Colorado
27-CA-347071Unfair labor practiceJul 2024OpenRegion 27, Denver, Colorado

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SHORT POWERLINE SERVICE. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for SHORT POWERLINE SERVICE. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
1057995
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SHORT POWERLINE SERVICE. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$322K
Obligated (all-time)
$4.0M
Awards
17
Top agency
Department of Energy
$4.0M
Top agencies by obligation (this location)
Department of Energy$4.0M
Department of the Interior$17K
Largest awards
  • Department of Energy
    BEAVER CREEK - STERLING OPGW INSTALLATION IGF::OT::IGF
    contract · Last action 2017-11-15
    $1,004,629
  • Department of Energy
    BOYD-AIRPORT-WELD OPGW INSTALLATION FOR ROCKY MOUNTAIN REGION LOCATED IN LARIMER AND WELD COUNTIES COLORADO. IGF::OT::IGF
    contract · Last action 2020-04-01
    $720,885
  • Department of Energy
    SIDNEY-STERLING OPTICAL GROUND WIRE INSTALLATION AND STRUCTURE MAINTENANCE
    contract · Last action 2020-04-22
    $414,779
  • Department of Energy
    CONSTRUCT JAMESTOWN SUBSTATION, STAGE 15, NORTH DAKOTA
    contract · Last action 2021-07-13
    $383,816
  • Department of Energy
    BOX BUTTE LINE SWITCH AND STRUCTURE REPLACEMENT. IGF::OT::IGF
    contract · Last action 2017-09-25
    $341,611
  • Department of Energy
    SPENCE SUBSTATION CIRCUIT BREAKER REPLACEMENT. IGF::OT::IGF
    contract · Last action 2018-01-25
    $198,649
  • Department of Energy
    COLORADO/WYOMING OPGW INSTALLATION ON AULT-WELD NO. 1(EAST) AND NO. 2(WEST), CHEYENNE-SNOWY RANGE AND CHEYENNE-HAPPY JACK, AND ERIE-TERRY STREET. IGF::OT::IGF
    contract · Last action 2017-11-06
    $180,525
  • Department of Energy
    TRANSMISSION LINE HARDWARE, WESTERN AREA POWER ADMINISTRATION, ROCKY MOUNTAIN REGION
    contract · Last action 2025-07-07
    $160,113
  • Department of Energy
    SPENCE SUBSTATION STAGE 02
    contract · Last action 2021-10-20
    $145,629
  • Department of Energy
    PURCHASE AND DELIVERY OF TRANSMISSION LINE HARDWARE FOR WESTERN AREA POWER ADMINISTRATION, ROCKY MOUNTAIN REGION
    contract · Last action 2021-06-16
    $108,835
  • Department of Energy
    PURCHASE AND DELIVERY OF TRANSMISSION LINE HARDWARE, WESTERN AREA POWER ADMINISTRATION, ROCKY MOUNTAIN REGION, LOVELAND, COLORADO
    contract · Last action 2021-12-06
    $101,518
  • Department of Energy
    WAREHOUSE STOCK REPLENISHMENT
    contract · Last action 2025-09-18
    $83,538
  • Department of Energy
    LINE HARDWARE LOVELAND COLORADO
    contract · Last action 2021-02-23
    $77,926
  • Department of Energy
    LINE HARDWARE
    contract · Last action 2025-11-05
    $40,872
  • Department of Energy
    POWER POLE SIGNAGE, WESTERN AREA POWER ADMINISTRATION, ROCKY MOUNTAIN REGION
    contract · Last action 2025-06-26
    $26,125
  • Department of the Interior
    IGF::OT:IGF - OTHER FUNCTIONS - WY-GL WIRE AND POLE REPLACEMENT
    contract · Last action 2018-09-19
    $16,578
  • Department of Energy
    SC - DN 2022 PROJECT MISCELLANEOUS LINE HARDWARE
    contract · Last action 2022-03-28
    $14,766

Federal contract dollars to this establishment. Primary NAICS: 237130 - POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION. Last action: 2025-11-05. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on SHORT POWERLINE SERVICE from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is SHORT POWERLINE SERVICE's OSHA violation history?
SHORT POWERLINE SERVICE has no OSHA inspections on record.