Summary
SCHNEIDER ELECTRIC USA has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
SCHNEIDER ELECTRIC USA appears in UVA Corporate Prosecution Registry, CPSC product recalls, and NHTSA vehicle recalls records only. No matching records were found in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, or CMS nursing home enforcement.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for SCHNEIDER ELECTRIC USA. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for SCHNEIDER ELECTRIC USA. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SCHNEIDER ELECTRIC USA. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for SCHNEIDER ELECTRIC USA. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for SCHNEIDER ELECTRIC USA. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for SCHNEIDER ELECTRIC USA. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SCHNEIDER ELECTRIC USA. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for SCHNEIDER ELECTRIC USA. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
First case: 2020-12-16. Most recent: 2020-12-16. Source: UVA Corporate Prosecution Registry — federal pleas, DPAs, and NPAs.
CPSC product recalls
Top hazard: The circuit breaker can fail to trip when an overload occurs, posing the risk of fire, burn and electric shock.. Most recent recall: 2022-06-16. Source: Consumer Product Safety Commission, matched on company name.
CPSC recall roster
Every CPSC consumer-product recall associated with this manufacturer, most-recent first. Hazards reflect CPSC’s classification (laceration, fire, fall, choking, lead exposure, etc.). Each row links to the agency’s authoritative recall page for the full remedy / contact / recall-number detail. 4 recalls shown · 4 distinct hazard categories.
| Recall | Date | Hazards | Units | CPSC |
|---|---|---|---|---|
Schneider Electric™ Recalls 1.4 Million Electrical Panels Due to Thermal Burn and Fire Hazards #22159 | Jun 2022 | The load center can overheat, posing thermal burn and fire hazards. | — | View → |
Schneider Electric Recalls Square D Safety Switches Due to Electrical Shock Hazard #18140 | Apr 2018 | The power can stay on when the safety switch handle is in the "OFF" position, posing an electrical shock or electrocution hazard to consumers. | — | View → |
Schneider Electric Recalls PowerPact J-Frame Circuit Breakers Due to Fire, Burn, Electrical Shock Hazards #15050 | Dec 2014 | The circuit breaker will not trip during an overload condition, posing a risk of fire, burns and electrical shock. | — | View → |
Schneider Electric Recalls Square D-Brand F and K Frame Circuit Breakers Due to Fire Hazard #14134 | Mar 2014 | The circuit breaker can fail to trip when an overload occurs, posing the risk of fire, burn and electric shock. | — | View → |
Source: Consumer Product Safety Commission. Recall details (specific products, sale dates, remedy instructions) live on the cpsc.gov record linked from each row.
NHTSA vehicle & equipment recalls
Most-recalled component: EQUIPMENT. Most recent campaign: 2013-04-15. Source: National Highway Traffic Safety Administration, matched on manufacturer name.
NHTSA campaign roster
Every NHTSA recall campaign issued for this manufacturer, most-recent first. Component column shows the primary system cited (airbags, brakes, electrical, fuel system, etc.). FMVSS column shows the Federal Motor Vehicle Safety Standard cited, if any. Potentially affected = NHTSA’s estimate of vehicles in the recall scope. 2 campaigns shown · 1,335 units potentially affected · 1 distinct components.
| Campaign | Date | Component | Vehicles | FMVSS | Affected |
|---|---|---|---|---|---|
| 13E018000 | Apr 2013 | EQUIPMENT | SCHNEIDER ELECTRIC | — | 763 |
| 10E032000 | Aug 2010 | EQUIPMENT | XANTREX | — | 572 |
Source: NHTSA recall database. Each campaign typically covers multiple model years and trims; the Vehicles column shows the distinct makes affected (model lists collapse in this view to keep the row scannable).
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of TransportationPURCHASE THE SWITCHGEAR LINE UP FOR THE ZMP ACEPS II PHASE 1 INSTALLATIONcontract · Last action 2023-09-22$2,651,651
- Department of TransportationTHE PURPOSE OF THIS FIRM-FIXED-PRICE DELIVERY ORDER IS TO PROCURE CRITICAL ESSENTIAL POWER SYSTEMS (ACEPS) II, PHASE I UPGRADES FOR THE CLEVELAND AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) (ZOB).contract · Last action 2023-08-23$2,171,098
- Department of TransportationTHE PURPOSE OF TASK ORDER (TO) 03 IS TO PROCURE SECTION J-13-B.4 CONFIGURATION A UNDER CLIN 100 OF THE BASE PERIOD. CONFIGURATION A IS IN SUPPORT OF THE AIR TRAFFIC CONTROL CENTERS (ARTCC) CRITICAL ESSENTIAL POWER SYSTEMS (ACEPS) UPGRADES FOR SEATTLE ARTCC (ZSE) ACEPS TYPE II PHASE I PROGRAM.contract · Last action 2023-08-07$2,107,862
- Department of TransportationKANSAS CITY ARTCC ACEPS II PHASE I SWITCHGEAR LINE UPcontract · Last action 2023-08-07$2,107,862
- Department of TransportationHOUSTON ARTCC(ZHU), HOUSTON, TX ACEPS II PHASE I, JCN 1006690contract · Last action 2023-08-07$2,107,862
- Department of TransportationALBUQUERQUE ARTCC ACEPS II PHASE I SWITCHGEAR LINE UPcontract · Last action 2023-08-07$2,107,862
- Department of TransportationINDIANAPOLIS ARTCC ACEPS II PHASE I SWITCHGEAR LINE UPcontract · Last action 2023-08-07$2,107,862
- Department of TransportationELECTRICAL DISTRIBUTION EQUIPMENTcontract · Last action 2018-11-19$2,107,862
- Department of TransportationEDE EQUIPMENTcontract · Last action 2020-05-14$2,085,362
- Department of TransportationPURCHASE THE SWITCHGEAR LINE UP FOR THE ZOB ACEPS II PHASE 2 PROJECTcontract · Last action 2023-09-19$1,782,612
- Department of TransportationPURCHASE THE SWITCHGEAR LINE UP FOR THE ZMP ACEPS II PHASE 2 AT MINNEAPOLIS, MN ARTCC ZMPcontract · Last action 2023-09-19$1,782,612
- Department of TransportationF11 TERMINAL FUNDING TO SCHNEIDER ELECTRIC GFE ELECTRICAL FOR EQUIPMENT ORDER - TUL ATCT REPLACEMENT, JCN - 23004457contract · Last action 2024-06-28$1,739,870
- Department of TransportationZTL ACEPS II PHASE 2 SCHNEIDER SWITCHGEAR EQUIPMENT PURCHASEcontract · Last action 2023-04-07$1,727,924
- Department of TransportationZBW ACEPS II PHASE 2 SCHNEIDER SWITCHGEAR EQUIPMENT PURCHASEcontract · Last action 2023-04-07$1,688,265
- Department of TransportationZAN ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, ELECTRICAL SWITCHGEAR PURCHASEcontract · Last action 2023-04-07$1,612,497
- Department of TransportationTHE ACQUISITION AND LIFE CYCLE IN-SERVICE SUPPORT OF INTERIOR ELECTRICAL DISTRIBUTION EQUIPMENT AT THE WJHTC.contract · Last action 2023-04-10$1,601,808
- Department of TransportationZLC ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, ELECTRICAL SWITCHGEAR PURCHASEcontract · Last action 2023-04-07$1,518,141
- General Services AdministrationIGF::CL::IGF ION EEM ANNUAL PREMIUM SUPPORTcontract · Last action 2023-05-15$1,450,541
- Department of TransportationPROVIDE ELECTRICAL DISTRIBUTION EQUIPMENT (EDE) FOR THE NEW CHS TRACON BUILDING, LOCATED IN CHARLESTON, SC.contract · Last action 2025-05-06$1,438,556
- Department of TransportationORDERING FAA EPMS DATA COLLECTION EQUIPMENT TEN ATCT WHICH INCLUDE CHICAGO, IL ORDB, WEST PALM BEACH, FL PBI, SAN FRANCISCO, CA SFO, TUCSON, AZ TUS, GUAM AGANA ZUA, CLEVELAND, OH CLE, HOUSTON, TX I90, LAS VEGAS, NV LAS, FLUSHING, NY LGA AND MEMPHIS,contract · Last action 2023-02-24$1,383,549
- Department of TransportationPURCHASE OF SQ D EDE EQUIPMENT FOR VARIOUS SITEScontract · Last action 2018-01-08$1,302,738
- Department of TransportationIGF::OT::IGF NY TRACON PHASE II E/G REPLACEMENTcontract · Last action 2021-01-05$1,282,735
- Department of TransportationEDE EQUIPMENT PURCHASE - FAA MIDWAY MDW ATCTcontract · Last action 2025-06-03$983,189
- Department of TransportationCRITICAL POWER DISTRIBUTION SYSTEM CPDS ELECTRICAL DISTRIBUTION EQUIPMENT EDE AND ELECTRICAL POWER MONITORING SYSTEM EPMS INSTALLATION FOR D01 DENVER TRACONcontract · Last action 2026-03-26$960,182
- Department of TransportationMODIFYING EXISTING CONTRACT - 693KA8-18-D-00018 - ATLANTA NEMC EXPANSION SCHNEIDER GFEcontract · Last action 2024-09-10$910,595
- Department of TransportationDO/TO 693KA8-18-F-00312 ORDERS ELECTRICAL SWITCHGEAR REQUIRED TO INSTALL ACEPS II PHASE II SYSTEM AT THE ENGINEERING SUPPORT FACILITY (ESF) AT WAKE FOREST, NC, REQUIRED FOR TESTING/TRAINING PRIOR TO IMPLEMENTATION AT ARTCC FACILITIES.contract · Last action 2020-10-26$889,239
- Department of TransportationCRITICAL POWER DISTRIBUTION SYSTEM CPDS ELECTRICAL DISTRIBUTION EQUIPMENT AND ELECTRICAL POWER MONITORING SYSTEM EPMS INSTALLATION FOR SALT LAKE CITY UT ATCTcontract · Last action 2025-08-07$873,820
- Department of DefensePOWER METER W/REMOTE DISPLAY IGF::OT::IGFcontract · Last action 2017-04-28$827,110
- Department of JusticeIGF::OT::IGF SCADA PMCScontract · Last action 2023-12-19$808,548
- Department of TransportationTHE PURPOSE OF THIS DELIVERY ORDER (DO) IS TO PROCURE: 1. ELECTRICAL DISTRIBUTION EQUIPMENT (EDE) FOR THE FORT MYERS, FL ATCT/TRACON. 2. A POWER SYSTEM STUDY OF THE FORT MYERS ATCT/TRACON.contract · Last action 2022-05-24$799,189
- Department of TransportationELECTRICAL DISTRIBUTION EQUIPMENT FOR SDF ATCTcontract · Last action 2025-08-25$759,997
- Department of TransportationCPDS FUNDS FOR FAA F11 ORLANDO TRACON EQUIPMENT PURCHASE JCN:23008376contract · Last action 2023-09-22$728,983
- Department of TransportationF35 BIL CPDS FUNDS AT FAA TPA TAMPA ATCT FOR EPMS (ELECTRICAL POWER MONITORING SYSTEM) TO MONITOR THE ELECTRICAL EQUIPMENT. JCN# 1800004contract · Last action 2024-06-25$727,480
- Department of TransportationPURCHASE OF GOVERNMENT FURNISHED EQUIPMENT THROUGH THE SQUARE D EDE CONTRACT NUMBER 693KA8-18-D-00018 IN SUPPORT OF THE NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITY, TETERBORO, NEW JERSEY.contract · Last action 2024-06-03$721,540
- Department of TransportationSIDE CAR AND CIRCUIT BREAKER EQUIPMENT AT MIAMI (MIA) ARTCCcontract · Last action 2025-12-08$686,190
- Department of TransportationSPARES, TRACAB EQUIPMENT AND STARTUP FOR DTW ATCT CPDS. EDE EQUIPMENT FOR DEN ATCT CPDScontract · Last action 2018-03-28$680,998
- Department of TransportationF35 BIL CPDS FUNDS AT FAA ZSU SAN JUAN CERAP FOR EPMS PANEL EQUIPMENT AND ACCESSORIES. JCN# 21003526contract · Last action 2025-06-24$656,054
- Department of TransportationELECTRICAL DISTRIBUTION EQUIPMENT FOR MCO CPDS UPGRADEcontract · Last action 2023-02-09$643,225
- Department of TransportationELECTRICAL DISTRIBUTION EQUIPMENT JOBSHOP AND DATA CENTER CONSTRUCTIONcontract · Last action 2024-06-05$623,387
- Department of TransportationCPDS FUND FOR EPMS INSTALLATIONcontract · Last action 2025-05-16$603,097
- Department of TransportationELECTRICAL DISTRIBUTION EQUIPMENT FOR PHASE 2 OF THE ORD M ATCT CPDS UPGRADEcontract · Last action 2023-04-07$566,087
- Department of TransportationELECTRICAL DISTRIBUTION EQUIPMENT AT LAX ATCT FOR CPDS UPGRADEcontract · Last action 2023-04-07$543,633
- Department of TransportationEO14042 ELECTRICAL DISTRIBUTION EQUIPMENT FOR DTW ATCT CPDS PHASE 2contract · Last action 2025-05-12$535,484
- Department of Veterans AffairsIGF::OT::IGF - METERING HOSTING AND SUPPORTcontract · Last action 2016-11-30$518,489
- Department of TransportationTHE PURCHASE OF EQUIPMENT AT THE PORTLAND FACILITY.contract · Last action 2023-04-07$500,732
- Department of TransportationFUNDING FOR THE POWER SYSTEM AT GSO.contract · Last action 2023-04-07$464,350
- Department of TransportationF35 IIJA CPDS FUNDING FOR QMB PANELBOARD WITH ATTACHED SIDE CAR AND COMPONENTS - FAA FT. LAUDERDALE FL FLL ATCTcontract · Last action 2025-07-08$450,745
- Department of TransportationVOICE LAB FIT OUTcontract · Last action 2024-05-13$437,444
- Department of DefensePOWER METER W/REMOTE DISPLAYcontract · Last action 2016-09-28$421,109
- Department of TransportationTO PROVIDE FUNDING FOR THE PURCHASE OF ADDITIONAL ELECTRICAL DISTRIBUTION EQUIPMENT AND SAFETY SWITCHES.contract · Last action 2023-09-12$386,895
Federal contract dollars to this establishment. Primary NAICS: 335311 - POWER, DISTRIBUTION, AND SPECIALTY TRANSFORMER MANUFACTURING. Last action: 2026-04-17. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Related searches
- Employers in MAState-wide enforcement data
About this data
This profile aggregates federal enforcement records on SCHNEIDER ELECTRIC USA from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is SCHNEIDER ELECTRIC USA's OSHA violation history?
- SCHNEIDER ELECTRIC USA has no OSHA inspections on record.