Skip to main content

Establishment profile

ROSCOE STEEL & CULVERT CO INC

1501 SOUTH 30TH STREET WEST, BILLINGS, MT, 59102
332312Fabricated Structural Metal Manufacturing

Download as PDF →

OSHA inspections
12
over 44 years
Violations
49
$15,028 in penalties
SVEP
YES
Severe violator program
Accident investigations on record
6 National Emphasis Program inspections · 1 OSHA follow-up

Summary

ROSCOE STEEL & CULVERT CO INC has accumulated 49 OSHA violations across 12 inspections over 44 years of recorded history, with $15,028 in total assessed penalties.

The establishment sits in the 99th percentile for violations within its industry-state peer group of 92 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 17 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

ROSCOE STEEL & CULVERT CO INC appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
12
0.3 / yr · last 44 yrs
Violations
49
1.1 / yr
Penalties
$15,028
$307 avg / violation
49% serious51% other
Inspection trigger · planned
8 of 12
Inspection trigger · referral
2 of 12

58% of inspections at this establishment produced violations, with 7 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 24 citations in this view · $15,028 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0212 A0122$3,863Jan 2004Mar 2005
29 CFR 1910.0147 C04 I22$413Mar 1990Aug 2008
29 CFR 1910.1200 F05 I22Mar 1990Feb 1994
29 CFR 1910.1200 F05 II22Mar 1990Feb 1994
29 CFR 1910.0106 D04 I11$3,500Jul 1998Jul 1998
29 CFR 1910.0212 A03 II11$2,200Jul 1998Jul 1998
29 CFR 1910.0253 B04 III11$1,100Jul 1998Jul 1998
29 CFR 1910.1000 D02 I11$650Mar 2005Mar 2005
29 CFR 1910.0303 G01 II11$600Jul 1998Jul 1998
29 CFR 1910.0219 D0111$500Feb 1994Feb 1994
29 CFR 1910.0095 I02 I11$500Feb 1994Feb 1994
29 CFR 1910.0134 I05 III11$450Feb 2005Feb 2005
29 CFR 1910.0147 C05 IID11$413Jan 2004Jan 2004
29 CFR 1910.0217 B04 I11$200Mar 1990Mar 1990
29 CFR 1910.0179 N04 I11$200Mar 1990Mar 1990
29 CFR 1910.0305 B0111$160Mar 1990Mar 1990
29 CFR 1910.0184 I09 III11$160Mar 1990Mar 1990
29 CFR 1910.0107 D0611$120Mar 1990Mar 1990
29 CFR 1910.1000 E11Mar 2005Mar 2005
29 CFR 1910.0147 D04 I11Jan 2004Jan 2004

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

99th

Worse on violations than nearly every other employer in NAICS 3323 within MT. Peer group: 92 employers. This establishment has 49 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
97th
peer median: $975
Inspection frequency
100th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for ROSCOE STEEL & CULVERT CO INC. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
3.4
BLS SOII 2024
Industry avg DART
1.8
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
8
Referral
2
Follow-up
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ROSCOE STEEL & CULVERT CO INC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
17 years ago

No federal enforcement activity has been recorded against this establishment in 17+ years. Most recent activity: 17 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for ROSCOE STEEL & CULVERT CO INC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for ROSCOE STEEL & CULVERT CO INC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for ROSCOE STEEL & CULVERT CO INC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for ROSCOE STEEL & CULVERT CO INC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for ROSCOE STEEL & CULVERT CO INC. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
ROSCOE STEEL & CULVERT CO
2847 HESPER ROAD · BILLINGS, MT, 59102
RCRANo Violation Identified00View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Motor carrier safety (FMCSA)

DOT number
32261
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for ROSCOE STEEL & CULVERT CO INC. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$816K
Awards
55
Top agency
Department of the Interior
$480K
Company-wide — ROSCOE STEEL AND CULVERT CO. (across 2 entities)
Obligated (5-yr)
$0
Obligated (all-time)
$971K
Awards (all-time)
73

Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.

Top agencies by obligation (this location)
Department of the Interior$480K
Department of Agriculture$301K
Department of Defense$32K
Department of Transportation$4K
Largest awards (top 50 of 55)
  • Department of Agriculture
    LAKE CREEK & TRAIL CREEK BRIDGES
    contract · Last action 2010-09-16
    $68,700
  • Department of Agriculture
    TAS::12 1118::TAS RECOVERY - RAMONA BRIDGE AKA 25 MILE CREEK BRIDGE SUPPLY. SUPPLY ON ONE (1) PRE-FABRICATED STEEL GIRDER BRIDGE. SUPPLY AND DELIVERY TO THE CHELAN RANGER DISTRICT.
    contract · Last action 2010-04-09
    $67,384
  • Department of the Interior
    WHISTLECREEK BRIDGE DESIGN, FABRICATION, DELIVERY
    contract · Last action 2010-08-17
    $48,464
  • Department of the Interior
    TAS:: 14 1610::TAS WATER CONTROL STRUCTURES
    contract · Last action 2010-05-19
    $38,800
  • Department of Defense
    TAS::96 3135::TAS RECOVERYPROJECT#322635::RP# BRIDGE, FREE-SPAN, 4' X 62' PEDESTRIAN
    contract · Last action 2009-09-17
    $31,600
  • Department of the Interior
    WATER CONTROL STRUCTURE
    contract · Last action 2008-07-30
    $27,532
  • Department of Agriculture
    LITTLE PISTOL CREEK PREFABRICATED STEEL TRUSS TRAIL BRIDGE
    contract · Last action 2012-06-04
    $27,100
  • Department of Agriculture
    PARKS- NFSR 103 ARCHPIPE
    contract · Last action 2010-08-24
    $24,948
  • Department of Agriculture
    2011 FLOOD REPAIR CULVERTS
    contract · Last action 2011-09-19
    $24,738
  • Department of the Interior
    CATTLE GUARDS
    contract · Last action 2010-10-21
    $23,727
  • Department of the Interior
    IRRIGATION FIELD SUPPLIES FOR WIND RIVER AGENCY
    contract · Last action 2010-04-07
    $23,076
  • Department of the Interior
    CULVERTS AND GATES
    contract · Last action 2010-07-02
    $21,497
  • Department of Agriculture
    CMP CULVERTS
    contract · Last action 2011-09-12
    $21,164
  • Department of the Interior
    FISH HAVEN BRIDGE
    contract · Last action 2010-03-22
    $21,000
  • Department of the Interior
    HEADGATES, BANDS AND CORRUGATED PIPE
    contract · Last action 2011-04-04
    $19,796
  • Department of the Interior
    FURNISH CULVERTS TO CM RUSSELL NWR
    contract · Last action 2010-06-24
    $17,887
  • Department of Agriculture
    ROSCOE STEEL&CULVERT/B-D NF, BUTTE CULVERTS AND GEOTEXTILE
    contract · Last action 2011-09-21
    $17,406
  • Department of the Interior
    PIPES AND CULVERT FOR DRAINAGE
    contract · Last action 2010-07-13
    $16,606
  • Department of the Interior
    CULVERTS 2011
    contract · Last action 2011-08-30
    $16,080
  • Department of the Interior
    CULVERTS
    contract · Last action 2008-08-06
    $15,735
  • Department of the Interior
    GRAY REEF PEDESTRIAN BRIDGE
    contract · Last action 2009-12-02
    $15,155
  • Department of the Interior
    contract · Last action 2008-08-05
    $14,227
  • Department of the Interior
    CULVERT PIPE 48 INCH DIA
    contract · Last action 2011-07-25
    $14,047
  • Department of Agriculture
    CARIBOU CITY CULVERTS
    contract · Last action 2010-09-08
    $13,843
  • Department of the Interior
    CORRUGATED STEEL PRODUCTS
    contract · Last action 2008-09-18
    $13,706
  • Department of the Interior
    GLG - CATTLEGUARD GRIDS & WINGS
    contract · Last action 2010-04-28
    $13,134
  • Department of the Interior
    COCO MATTING & STAPLES, EROSION CONTROL BLANKETS, CFFO
    contract · Last action 2009-11-10
    $11,180
  • Department of the Interior
    CULVERTS FOR EMERGENCY ROAD REPAIR AT SAND LAKE
    contract · Last action 2011-06-16
    $11,127
  • Department of the Interior
    BR-12 GATES&PIPE
    contract · Last action 2011-04-13
    $10,785
  • Department of Agriculture
    KNF / HUDSON CULVERT / 3 BIDS INCLUDED /
    contract · Last action 2010-09-22
    $10,068
  • Department of Agriculture
    TWO CORRUGATED GALVANIZED STEEL PIPE ARCHES (I.E. SQUASHED PIPE) PIPES 40 FEET LONG AND 7 FEET WIDE. CORRUGATIONS, PIPE GUAGE, AND CORRESPONDING MINIMUM FILL OF 1 - 2 FEET SHALL MEET AASHTO REQUIREMENTS FOR H-20 LOADING. MATERIALS SHALL INCLUDE PIPE, COUPLING BANDS AND ALL HARDWARE TO ATTACH AND ASSEMBLE THESE ITEMS. DELIVERY WILL BE MADE TO: THE CAIBOU-TARGHEE NATIONAL FOREST, WESTSIDE RANGER DISTRICT OFFICE, 4350 CLIFFS DRIVE, POATELLO, IDAHO 83204.
    contract · Last action 2011-07-20
    $9,912
  • Department of the Interior
    WATER CONTROL STRUCTURE AND RIP RAP FABRIC
    contract · Last action 2011-08-29
    $9,806
  • Department of the Interior
    EROSION CONTROL MATTING AND STAPLES
    contract · Last action 2010-08-13
    $9,748
  • Department of the Interior
    CMP DROP BOARD RISERS
    contract · Last action 2010-07-23
    $9,710
  • Department of the Interior
    CORRUGATED METAL PIPE CULVERTS 18"X30' 16 GAUGE GALVANIZED
    contract · Last action 2011-08-26
    $9,661
  • Department of Agriculture
    TAS::12 1102::TAS ARRA 3-14 FOOT CATTLEGUARD W/WINGS H-20 LOAD RATING
    contract · Last action 2010-02-09
    $8,362
  • Department of the Interior
    CATTLE GUARD WINGS
    contract · Last action 2010-12-09
    $7,667
  • Department of the Interior
    CULVERTS
    contract · Last action 2010-09-02
    $7,616
  • Department of the Interior
    MANUFACUTER WATER CONTROL STURCTURE
    contract · Last action 2011-08-23
    $7,101
  • Department of the Interior
    PARTS FOR EAGLE FEATHER ROADS PROJECT IN BUSBY, MT
    contract · Last action 2009-08-06
    $5,701
  • Department of the Interior
    DETENTION 1592#1 DAM REPAIR PIPE
    contract · Last action 2011-07-15
    $5,599
  • Department of the Interior
    ROAD CULVERT PIPE
    contract · Last action 2007-11-05
    $5,397
  • Department of the Interior
    contract · Last action 2008-03-11
    $4,213
  • Department of the Interior
    CORREGATED STEEL CULVERT AND BANDS
    contract · Last action 2011-07-07
    $4,070
  • Department of Agriculture
    REPLACEMENT CATTLE GUARD RAILS FOR REPAIRS TO FOREST CATTLE GUARDS.
    contract · Last action 2010-07-15
    $3,789
  • Department of the Interior
    contract · Last action 2008-01-25
    $3,732
  • Department of Transportation
    PROVIDE GALVANIZED STEEL PIPE, STEEL FASTENERS AND DELIVERY
    contract · Last action 2012-05-21
    $3,661
  • Department of Agriculture
    ROSCOE STEEL/CATTLEQUARDS
    contract · Last action 2010-09-17
    $3,615
  • Department of the Interior
    CULVERT
    contract · Last action 2012-02-24
    $0
  • Department of the Interior
    CORRUGATED STEEL PRODUCTS
    contract · Last action 2008-04-17
    $0

Federal contract dollars to this establishment. Primary NAICS: 332312 - FABRICATED STRUCTURAL METAL MANUFACTURING. Last action: 2012-06-04. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2008-07-29Planned11$413
2005-01-20Planned33$1,100
2004-11-01Planned1$3,200
2004-01-09Follow-up0$0
2004-01-06Planned32$1,075
2000-05-24Referral0$0
1998-05-26Planned0$0
1998-05-26Planned1010$7,400
1995-09-07Planned0$0
1994-01-06Planned202$1,000
1990-02-21Referral116$840
1981-08-25Follow-up0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in fabricated structural metal manufacturing within MT, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on ROSCOE STEEL & CULVERT CO INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is ROSCOE STEEL & CULVERT CO INC's OSHA violation history?
ROSCOE STEEL & CULVERT CO INC has 12 OSHA inspections on record with 49 violations and $15,027.5 in total penalties.
How does ROSCOE STEEL & CULVERT CO INC's safety record compare to its industry?
ROSCOE STEEL & CULVERT CO INC operates in the fabricated structural metal manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 3.4.