Skip to main content

Establishment profile

ROCK-N-ROAD CONSTRUCTION

APPROXIMATELY 56 48'41.9"N 132 56'39.5"W, PETERSBURG, AK, 99833
Operated by Rock-N-Road Construction, Inc · 1 of 2 establishments
237310Highway, Street, and Bridge Construction
EIN 920092898

Download as PDF →

OSHA inspections
1
over 2 years
Violations
3
$6,033 in penalties
Penalties
$6,033
$2,011 avg
Accident investigations on record
1 OSHA follow-up

Summary

ROCK-N-ROAD CONSTRUCTION has accumulated 3 OSHA violations across 1 inspection over 2 years of recorded history, with $6,033 in total assessed penalties.

The establishment sits in the 59th percentile for violations within its industry-state peer group of 123 employers. The most recent enforcement activity was recorded 2 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

ROCK-N-ROAD CONSTRUCTION appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
1
0.5 / yr · last 2 yrs
Violations
3
1.5 / yr
Penalties
$6,033
$2,011 avg / violation
67% serious33% other
Inspection trigger · referral
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view · $6,033 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0900 H11$6,033May 2024May 2024
29 CFR 1904.0040 A11May 2024May 2024
29 CFR 1926.0909 C11May 2024May 2024

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

59th

Above average violations in NAICS 2373 within AK. Peer group: 123 employers. This establishment has 3 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
87th
peer median: $750
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.5
TRIR
0.0
vs industry
−2.5

Reported for 16 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.5
BLS SOII 2024
Industry avg DART
1.5
BLS SOII 2024
Self-reported TRIR
0.0
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Referral
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ROCK-N-ROAD CONSTRUCTION. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
2 years ago

No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for ROCK-N-ROAD CONSTRUCTION. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for ROCK-N-ROAD CONSTRUCTION. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for ROCK-N-ROAD CONSTRUCTION. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for ROCK-N-ROAD CONSTRUCTION. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for ROCK-N-ROAD CONSTRUCTION. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for ROCK-N-ROAD CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$14.3M
Obligated (all-time)
$25.8M
Awards
88
Top agency
Department of Agriculture
$25.8M
Company-wide — ROCK-N-ROAD CONSTRUCTION INC. (across 1 entity)
Obligated (5-yr)
$13.5M
Obligated (all-time)
$13.5M
Awards (all-time)
35

Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.

Top agencies by obligation (this location)
Department of Agriculture$25.8M
Department of Homeland Security$3K
Largest awards (top 50 of 88)
  • Department of Agriculture
    IGF::OT::IGF KOSCIUSKO ROAD AND BRIDGE REPAIRS AND ROAD RECONSTRUCTION. AWARD OF ALL LINE ITEMS IN THE FOLLOWING SCHEDULES OF ITEMS: BASE AND OPTIONS 2, 5, 6&7
    contract · Last action 2016-10-03
    $2,436,738
  • Department of Agriculture
    GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 1.986 BRIDGE: HOONAH DOUBLE LANE BRIDGES PHASE TWO. REPLACE THE SINGLE LANE BRIDGE AT 8502 MP 1.986 WITH A LONGER DOUBLE LANE BRIDGE
    contract · Last action 2025-02-03
    $2,223,500
  • Department of Agriculture
    IGF::OT::IGF WRANGELL ROAD RECONDITIONING
    contract · Last action 2014-06-02
    $1,062,114
  • Department of Agriculture
    GAOA ZAREMBO ISLAND BOAT LAUNCH, ROAD RECONSTRUCTION, AOPS & ST JOHNS BRIDGE- ST JOHNS BRIDGE REPLACEMENT- REPLACE A 80' BRIDGE WITH A 112 ' BRIDGE ON ROAD 6290 AT MP1.1
    contract · Last action 2025-04-30
    $1,047,442
  • Department of Agriculture
    IIJA/BIL FALSE ISLAND AQUATIC ORGANISM PASSAGE RECONSTRUCTION: : THE PURPOSE OF THIS TASK ORDER FROM THE TONGASS MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO REPLACE 2 UNDERSIZED CORRUGATED METAL PIPES WITH AOP DESIGNED STRUCTURES ON NFS ROAD 7540F
    contract · Last action 2024-09-05
    $1,026,834
  • Department of Agriculture
    GAOA - WORK IS TO IMPROVE THREE CAMPSITES AND ACCESS ROAD DEVELOP ADDITIONAL PARKING INSTALL PAY STATION, 1 VAULT TOILET, 1 DAY USE PICNIC SHELTER AND RELATED AMENITIES, AND REPAIR EXISTING DOCK FACILITIES.
    contract · Last action 2025-09-23
    $993,453
  • Department of Agriculture
    HOONAH ROAD RESURFACING ON NFS ROADS 8530 (SECTIONS 1 AND 2) AND 8502.
    contract · Last action 2019-09-29
    $960,489
  • Department of Agriculture
    2020 HOONAH FISH PASSAGE&TRAFFIC SAFETY IMPROVEMENTS
    contract · Last action 2020-07-01
    $917,170
  • Department of Agriculture
    GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 3.478 BRIDGE; REMOVAL OF EXISTING BRIDGE AND CONSTRUCTION OF NEW 69' BRIDGE AND ABUTMENTS; RECONSTRUCTION OF ROAD FOR BRIDGE CONSTRUCTION
    contract · Last action 2025-01-30
    $894,051
  • Department of Agriculture
    GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: KMRD REMOTE DOCK
    contract · Last action 2024-09-25
    $835,677
  • Department of Agriculture
    BACK LOOP AQUATIC ORGANISM PASSAGE CONSTRUCTION CONSISTS OF REMOVING EXISTING CULVERT ON ROAD 3030110 AT MP 0.28 AND REPLACE WITH A 49 STEEL BRIDGE AND THE CONSTRUCTION OF A NEW SIMULATED STREAMBED. ALSO, THE REMOVAL OF AN EXISTING CULVERT ON ROAD 30
    contract · Last action 2023-10-19
    $804,530
  • Department of Agriculture
    STANEY CREEK AQUATIC ORGANISM PASSAGE CONSTRUCTION CONSISTS OF REMOVING EXISTING CULVERTS ON ROAD 2050 AT MP 10.36 AND 14.69 AND REPLACE WITH A NEW DESIGNED AQUATIC ORGANISM PASSAGE STRUCTURE AND THE CONSTRUCTION OF A NEW SIMULATED STREAMBED.
    contract · Last action 2023-08-29
    $800,340
  • Department of Agriculture
    GAOA TONGASS NF DOCK: SITKA AND PETERSBURG MARINE FACILITIES
    contract · Last action 2024-09-18
    $687,668
  • Department of Agriculture
    BACKLOOP ROAD RECONDITIONING; COMPLETE RECONDITIONING OF 5.15 MILES OF ROADWAY. THIS PROJECT WILL ALSO INVOLVE DEVELOPING A MATERIAL SOURCE, CRUSHING, HAULING, PLACING AND COMPACTION OF SURFACE BASE AGGREGATE AND INSTALLING MULTIPLE NEW CULVERTS.
    contract · Last action 2024-06-26
    $674,060
  • Department of Agriculture
    NEMO ROAD REPAIR
    contract · Last action 2011-12-05
    $665,859
  • Department of Agriculture
    GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: FALSE ISLAND REMOTE DOCK
    contract · Last action 2025-03-13
    $623,310
  • Department of Agriculture
    REMOVAL OF THE MARINE ACCESS FACILITY; COUVERDEN/HOMESHORE MARINE ACCESS FACILITY BULKHEAD AND A LARGE PORTION OF THE CAUSEWAY. THE END PRODUCT WILL BE A DRIVABLE RAMP FOR EQUIPMENT AND BARGE LOADING
    contract · Last action 2021-11-02
    $593,917
  • Department of Agriculture
    GAOA PRINCE OF WALES ISLAND POLK ROAD AOP 2100 MP 12.53 IS A NEW CONSTRUCTION CONTRACT ACTION WHICH ENTAILS THE REMOVAL AND DISPOSAL OF AN EXISTING CMP ON ROAD 2100 MP 12.53 AND REPLACE WITH A 60' LENGTH STEEL MODULAR BRIDGE. RECONSTRUCTING THE
    contract · Last action 2023-07-06
    $586,039
  • Department of Agriculture
    MIDDLE RIDGE ROAD SURFACING
    contract · Last action 2013-03-05
    $489,736
  • Department of Agriculture
    SOUTH MITKOF BOAT RAMP
    contract · Last action 2013-09-13
    $467,253
  • Department of Agriculture
    IGF::OT::IGF FALLS CREEK BRIDGE DESIGN AND REPLACEMENT
    contract · Last action 2017-06-16
    $424,210
  • Department of Agriculture
    HOONAH ERFO AOP STREAM CROSSING IMPROVEMENTS
    contract · Last action 2023-05-30
    $413,925
  • Department of Agriculture
    GAOA CENTRAL PRINCE OF WALES ROAD IMPROVEMENTS: 2051 MP 1.42 AOP REMOVE EXISTING STRUCTURAL PLATE 15'5 SPAN X 105 RISE AND REPLACE WITH A 60 FEET LONG 4 GIRDER STEEL BRIDGE. RECONSTRUCT STREAM WITH STREAM SIMULATION ROCK FOR AQUATIC PASSAGE.
    contract · Last action 2022-06-21
    $412,600
  • Department of Agriculture
    THE PETERSBURG RANGER DISTRICT OF THE TONGASS NATIONAL FOREST REHABILITATION OF APPROXIMATELY 0.6 MILES OF STREAM CORRIDOR AND THE ADJOINING FLOODPLAIN ON EAST OHMER CREEK, NORTH AND SOUTH FORKS OF LUMPY CREEK (TRIBUTARIES TO EAST OHMER), AND A SMALL
    contract · Last action 2022-07-25
    $405,316
  • Department of Agriculture
    2020 HOONAH AOP IMPROVEMENTS ROAD 8576
    contract · Last action 2020-09-11
    $332,643
  • Department of Agriculture
    DEWATERING, EXCAVATION, ROCK EXCAVATION, INSTALLATION OF STRUCTURES, DEVELOPMENT OF QUARRY, BORROW MATERIAL FROM NEARBY QUARRY FOR MATERIAL, HAUL, RECONSTRUCTING STREAMBED AND BANKS WITH INSTREAM ROCK STRUCTURES, BACKFILL, AND SOIL EROSION CONTROL
    contract · Last action 2025-01-21
    $314,670
  • Department of Agriculture
    IGF::OT::IGF REPLACEMENT OF EXCURSION INLET BRIDGE
    contract · Last action 2018-12-04
    $306,979
  • Department of Agriculture
    SOUTH POW ROAD DRAINAGE STABILIZATION IGF::OT::IGF
    contract · Last action 2015-04-23
    $299,100
  • Department of Agriculture
    AOP CULVERT REPLACEMENT NFSR 2030790 MP 1.08
    contract · Last action 2023-08-07
    $298,780
  • Department of Agriculture
    TONGASS NATIONAL FOREST - GAOA ROOSEVELT HARBOR DOCK REPAIR
    contract · Last action 2024-08-05
    $287,076
  • Department of Agriculture
    TAS::12 1102::TAS RECOVERY 3 LAKES BRIDGE REPLACEMENT. THIS PROJECT CONSISTS OF REMOVING 3 EXISTING CULVERTS AND REPLACING THEM WITH AN 80 FOOT MODULAR BRIDGE.
    contract · Last action 2010-08-24
    $266,843
  • Department of Agriculture
    IGF::OT::IGF KUIU ISLAND WOOD FALLING AND EXTRACTION CONTRACT OTHER FUNCTIONS
    contract · Last action 2013-07-12
    $263,925
  • Department of Agriculture
    POW ROCK CRUSHING: DEVELOP AGGREGATE, CRUSH AND STOCKPILE AGGREGATE
    contract · Last action 2021-07-07
    $239,000
  • Department of Agriculture
    2024 POW SHAHEEN STANEY AOP- THE PURPOSE OF THIS TASK ORDER FROM THE REGION 10 MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO (1) REPLACE 1 UNDERSIZED CORRUGATED METAL PIPE WITH AN AOP DESIGNED CULVERT ON NFS ROAD 2050300 MP 4.67, TO (2) PLACE 300 CY
    contract · Last action 2024-08-15
    $238,975
  • Department of Agriculture
    HOONAH BRIDGE RECONSTRUCTION ON NFS ROAD 8516&8534
    contract · Last action 2018-07-02
    $224,154
  • Department of Agriculture
    HOONAH ERFO 8516 AOP- CLEAR SLIDE FROM 8516 ROAD, REESTABLISH DITCHES, CONSTRUCT A LOG CULVERT AND CONSTRUCT A 90 FOOT BRIDGE. TRANSPORT BRIDGE FROM ROWAN BAY.
    contract · Last action 2022-05-26
    $207,475
  • Department of Agriculture
    1005 EAM CONST WRD PHASE 2 ZAREMBO ISLAND BOAT LAUNCH- ST JOHNS BRIDGE- ROAD 6590 ROAD RECONSTRUCTION, CULVERT INSTALLATION, AND SURFACING ON ZAREMBO ISLAND. THE WORK WILL CONSIST OF ROADWAY RECONDITIONING, CULVERT INSTALLATION, THE DEVELOPMENT OF A
    contract · Last action 2025-09-08
    $189,550
  • Department of Agriculture
    2020 SITKA RANGER DISTRICT CORNER BAY BRIDGE REPLACEMENT
    contract · Last action 2020-09-11
    $175,324
  • Department of Agriculture
    GAOA TONGASS NF DOCK: WRANGELL MARINE FACILITY
    contract · Last action 2024-08-05
    $164,240
  • Department of Agriculture
    A 48" DIAMETER CORRUGATED METAL PIPE CULVERT ON RD 6265 MILEPOST 0.313 WILL BE REPLACED WITH AN AQUATIC ORGANISM PASSAGE CONSISTING OF A 142"X 91"X 66' CORRUGATED METAL PIPE ARCH WITH STREAM SIMULATION ROCK, STREAMBANKS, AND STREA
    contract · Last action 2022-08-26
    $152,710
  • Department of Agriculture
    MITKOF ROAD MAINTENANCE 2014 IDIQ ROAD MTCE TASK ORDER IGF::OT::IGF
    contract · Last action 2014-05-30
    $139,479
  • Department of Agriculture
    TAS::12 1102::TAS RECOVERY KUIU BRIDGE RAIL AND PLANK REPLACEMENT
    contract · Last action 2011-02-22
    $137,237
  • Department of Agriculture
    CRD ROCK CRUSHING
    contract · Last action 2024-09-25
    $119,250
  • Department of Agriculture
    PETERSBURG MOUNTAIN TRAIL RECONSTRUCTION PHASE 2
    contract · Last action 2010-07-15
    $108,450
  • Department of Agriculture
    2015 MITKOF ROAD MAINTENANCE IGF::OT::IGF
    contract · Last action 2015-05-15
    $106,013
  • Department of Agriculture
    2020 8 FATHOM ROAD SYSTEM MAINTENANCE
    contract · Last action 2020-07-27
    $75,675
  • Department of Agriculture
    POW STORM DAMAGE ROAD REPAIRS CONSISTS OF PERFORMING URGENT ROAD REPAIRS TO STORM DAMAGED ROADS TO RECONDITION EXISTING DITCHES AND CULVERTS, REPAIR ROAD SURFACES, HAULING & PLACING SURFACE AGGREGATES, NEW CULVERT INSTALLATION, SLIDE DEBRIS REMOV
    contract · Last action 2023-03-31
    $73,828
  • Department of Agriculture
    PRD MITKOF ISLAND BRIDGE RESURFACING
    contract · Last action 2024-09-04
    $64,600
  • Department of Agriculture
    TONGASS NATIONAL FOREST: RUSH PEAK BRIDGE CONSTRUCTION.
    contract · Last action 2023-09-22
    $49,550
  • Department of Agriculture
    USE HEAVY EQUIPMENT TO REMOVE ROAD PRISMS TO IMPROVE WATERSHED FUNCTION.
    contract · Last action 2021-06-30
    $47,140

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-03-05. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2024-04-29Referral32$6,033

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

ROCK-N-ROAD CONSTRUCTION is one of 2 establishments rolled up under the parent organization Rock-N-Road Construction, Inc.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Rock-N-Road Construction, Inc across all 2 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in highway, street, and bridge construction within AK, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on ROCK-N-ROAD CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Rock-N-Road Construction, Inc, which operates 2 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is ROCK-N-ROAD CONSTRUCTION's OSHA violation history?
ROCK-N-ROAD CONSTRUCTION has 1 OSHA inspection on record with 3 violations and $6,033 in total penalties.
How does ROCK-N-ROAD CONSTRUCTION's safety record compare to its industry?
ROCK-N-ROAD CONSTRUCTION operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. ROCK-N-ROAD CONSTRUCTION's self-reported DART rate is 0 compared to an industry average of 1.5.