Establishment profile
PETERS CONCRETE COMPANY
RACCOONBERRY DR., BELLEVUE, WI, 54311
237110 — Water and Sewer Line and Related Structures Construction
Summary
PETERS CONCRETE COMPANY has accumulated 8 OSHA violations across 3 inspections over 34 years of recorded history, with $1,350 in total assessed penalties.
The establishment sits in the 96th percentile for violations within its industry-state peer group of 773 employers. Inspection frequency runs at the 92nd percentile. The most recent enforcement activity was recorded 8 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
PETERS CONCRETE COMPANY appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 8 distinct standards shown · 8 citations in this view · $1,350 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0601 B04 | 1 | 1 | $400 | Jul 1992 | Jul 1992 |
| 29 CFR 1926.0601 B03 | 1 | 1 | $400 | Jul 1992 | Jul 1992 |
| 29 CFR 1926.0059 H01 | 1 | 1 | $225 | Jul 1992 | Jul 1992 |
| 29 CFR 1926.0059 E01 | 1 | 1 | $225 | Jul 1992 | Jul 1992 |
| 29 CFR 1910.0215 A04 | 1 | 1 | $100 | Sep 1997 | Sep 1997 |
| 29 CFR 1910.0253 B04 III | 1 | 1 | — | Sep 1997 | Sep 1997 |
| 29 CFR 1910.0215 B09 | 1 | 1 | — | Sep 1997 | Sep 1997 |
| 29 CFR 1926.0601 B14 | 1 | 1 | — | Jul 1992 | Jul 1992 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer in NAICS 2371 within WI. Peer group: 773 employers. This establishment has 8 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for PETERS CONCRETE COMPANY. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PETERS CONCRETE COMPANY. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 8+ years. Most recent activity: 8 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for PETERS CONCRETE COMPANY. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WI — for PETERS CONCRETE COMPANY, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other PETERS CONCRETE COMPANY operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 48S&S · $78,467 proposed / $51,369 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6189288 | Generator 350 KVA Brown, WI | Apr 2007 | — | Yes | HighNegligence | $9,800 | $2,500 |
| 6189285 | Generator 350 KVA Brown, WI | Apr 2007 | — | Yes | HighNegligence | $9,800 | $3,000 |
| 6189284 | Generator 350 KVA Brown, WI | Apr 2007 | — | Yes | HighNegligence | $9,800 | $2,500 |
| 6177916 | Portable Crusher #2 Brown, WI | Nov 2024 | — | Yes | HighNegligence | $9,004 | $9,004 |
| 6199414 | Generator 225 KW Brown, WI | Dec 2007 | — | Yes | HighNegligence | $4,800 | $2,400 |
| 6177970 | 600 KW Brown, WI | Feb 2025 | — | Yes | HighNegligence | $3,263 | $3,263 |
| 6189283 | Generator 350 KVA Brown, WI | Apr 2007 | — | No | HighNegligence | $2,901 | $1,500 |
| 8667598 | Eagle Wash Plant #1 Brown, WI | Jun 2025 | — | Yes | HighNegligence | $2,712 | $2,712 |
| 6558193 | Peters Wash Plant Brown, WI | May 2013 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 6187191 | Generator 350 KVA Brown, WI | Aug 2005 | — | Yes | HighNegligence | $1,100 | $660 |
| 6137349 | Generator 750 KW Brown, WI | Jun 2021 | — | Yes | ModNegligence | $729 | $729 |
| 6137346 | Generator 750 KW Brown, WI | Jun 2021 | — | Yes | ModNegligence | $729 | $729 |
| 9441972 | 500 KW Spare Brown, WI | Dec 2020 | — | Yes | ModNegligence | $729 | $729 |
| 8948040 | Generator 225 KW Brown, WI | Oct 2016 | — | Yes | ModNegligence | $684 | $307 |
| 6558616 | Generator 750 KW Brown, WI | May 2012 | — | Yes | ModNegligence | $651 | $651 |
| 6177917 | Portable Crusher #2 Brown, WI | Nov 2024 | — | No | ModNegligence | $592 | $592 |
| 6189286 | Generator 350 KVA Brown, WI | Apr 2007 | — | No | HighNegligence | $585 | $585 |
| 6187192 | Generator 350 KVA Brown, WI | Aug 2005 | — | Yes | HighNegligence | $525 | $315 |
| 6187525 | Generator 350 KVA Brown, WI | Sep 2006 | — | Yes | HighNegligence | $524 | $524 |
| 6187524 | Generator 350 KVA Brown, WI | Sep 2006 | — | Yes | HighNegligence | $524 | $524 |
| 6177187 | Peters Wash Plant Brown, WI | Jun 2005 | — | Yes | HighNegligence | $475 | $475 |
| 9440213 | Bonduel Wash Plant Shawano, WI | Nov 2018 | — | Yes | HighNegligence | $440 | $440 |
| 6187530 | Generator 350 KVA Brown, WI | Sep 2006 | — | No | ModNegligence | $440 | $440 |
| 6187527 | Generator 350 KVA Brown, WI | Sep 2006 | — | Yes | ModNegligence | $440 | $440 |
| 9440209 | Bonduel Wash Plant Shawano, WI | Nov 2018 | — | Yes | HighNegligence | $429 | $429 |
| 9440208 | Bonduel Wash Plant Shawano, WI | Nov 2018 | — | Yes | HighNegligence | $429 | $429 |
| 9627154 | Portable Crusher #2 Brown, WI | Feb 2024 | — | Yes | ModNegligence | $357 | $357 |
| 6139139 | Superior Wash Plant #1 Brown, WI | Apr 2003 | — | No | HighNegligence | $350 | $350 |
| 9626636 | Superior Wash Plant #1 Brown, WI | Jun 2023 | — | Yes | ModNegligence | $346 | $346 |
| 8948888 | Generator 750 KW Brown, WI | Nov 2017 | — | Yes | ModNegligence | $330 | $330 |
| 9626288 | Bonduel Wash Plant Shawano, WI | Aug 2022 | — | Yes | ModNegligence | $321 | $321 |
| 6137333 | Peters Wash Plant Brown, WI | May 2021 | — | Yes | ModNegligence | $302 | $302 |
| 8949171 | Peters Wash Plant Brown, WI | Sep 2018 | — | Yes | ModNegligence | $286 | $286 |
| 8948930 | Generator 225 KW Brown, WI | May 2018 | — | Yes | ModNegligence | $286 | $286 |
| 8948041 | Generator 225 KW Brown, WI | Oct 2016 | — | Yes | ModNegligence | $276 | $276 |
| 8893100 | Generator 225 KW Brown, WI | Oct 2015 | — | Yes | ModNegligence | $263 | $263 |
| 8846387 | Generator 750 KW Brown, WI | Apr 2015 | — | Yes | ModNegligence | $263 | $263 |
| 8846386 | Generator 750 KW Brown, WI | Apr 2015 | — | Yes | ModNegligence | $263 | $263 |
| 6187529 | Generator 350 KVA Brown, WI | Sep 2006 | — | No | ModNegligence | $247 | $247 |
| 6187528 | Generator 350 KVA Brown, WI | Sep 2006 | — | No | ModNegligence | $247 | $247 |
| 6187526 | Generator 350 KVA Brown, WI | Sep 2006 | — | No | ModNegligence | $247 | $247 |
| 6139829 | Generator 225 KW Brown, WI | Oct 2003 | — | Yes | ModNegligence | $247 | $133 |
| 6139828 | Generator 225 KW Brown, WI | Oct 2003 | — | Yes | ModNegligence | $247 | $133 |
| 6139827 | Generator 225 KW Brown, WI | Oct 2003 | — | Yes | ModNegligence | $247 | $133 |
| 6139826 | Generator 225 KW Brown, WI | Oct 2003 | — | Yes | ModNegligence | $245 | $170 |
| 8845927 | Superior Wash Plant #1 Brown, WI | May 2015 | — | Yes | ModNegligence | $243 | $243 |
| 8845901 | Pioneer Crusher Brown, WI | Apr 2015 | — | Yes | HighNegligence | $243 | $243 |
| 8845829 | Generator 225 KW Brown, WI | Oct 2014 | — | Yes | ModNegligence | $243 | $243 |
| 8845827 | Generator 225 KW Brown, WI | Oct 2014 | — | Yes | ModNegligence | $243 | $243 |
| 8734701 | 500 KW Brown, WI | Sep 2014 | — | Yes | HighNegligence | $243 | $243 |
| 6137348 | Generator 750 KW Brown, WI | Jun 2021 | — | No | LowNegligence | $220 | $220 |
| 6187531 | Generator 350 KVA Brown, WI | Sep 2006 | — | No | ModNegligence | $203 | $203 |
| 6177155 | Generator 225 KW Brown, WI | May 2005 | — | Yes | ModNegligence | $203 | $203 |
| 6189292 | Generator 350 KVA Brown, WI | Apr 2007 | — | No | ModNegligence | $176 | $176 |
| 6189291 | Generator 350 KVA Brown, WI | Apr 2007 | — | No | ModNegligence | $176 | $176 |
| 6189290 | Generator 350 KVA Brown, WI | Apr 2007 | — | No | ModNegligence | $176 | $176 |
| 8667597 | Eagle Wash Plant #1 Brown, WI | Jun 2025 | — | Yes | ModNegligence | $165 | $165 |
| 9627161 | Portable Crusher #2 Brown, WI | Feb 2024 | — | No | HighNegligence | $164 | $164 |
| 9627478 | Superior Wash Plant #1 Brown, WI | Aug 2024 | — | Yes | ModNegligence | $161 | $161 |
| 9485536 | 600 KW Brown, WI | May 2023 | — | Yes | ModNegligence | $155 | $155 |
| 6177157 | Generator 225 KW Brown, WI | May 2005 | — | Yes | ModNegligence | $154 | $154 |
| 6140020 | Generator 750 KW Brown, WI | Apr 2004 | — | Yes | ModNegligence | $154 | $154 |
| 5117499 | Portable Crusher #2 Brown, WI | Feb 2026 | — | No | LowNegligence | $151 | — |
| 5117498 | Portable Crusher #2 Brown, WI | Feb 2026 | — | No | LowNegligence | $151 | — |
| 5117497 | Portable Crusher #2 Brown, WI | Feb 2026 | — | No | ModNegligence | $151 | — |
| 5117026 | Eagle Wash Plant #1 Brown, WI | Nov 2025 | — | No | ModNegligence | $151 | $151 |
| 5117421 | Portable Crusher #2 Brown, WI | Aug 2025 | — | No | LowNegligence | $151 | $151 |
| 8667596 | Eagle Wash Plant #1 Brown, WI | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 8667595 | Eagle Wash Plant #1 Brown, WI | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 8667594 | Eagle Wash Plant #1 Brown, WI | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 8667579 | Generator 225 KW Brown, WI | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 8667578 | Generator 225 KW Brown, WI | Jun 2025 | — | No | LowNegligence | $151 | $151 |
| 8667572 | Superior Wash Plant #1 Brown, WI | Jun 2025 | — | No | LowNegligence | $151 | $151 |
| 8667571 | Superior Wash Plant #1 Brown, WI | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 8667570 | Superior Wash Plant #1 Brown, WI | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 8667569 | Superior Wash Plant #1 Brown, WI | Jun 2025 | — | No | HighNegligence | $151 | $151 |
| 6177972 | 600 KW Brown, WI | Feb 2025 | — | No | ModNegligence | $151 | $151 |
| 6177971 | 600 KW Brown, WI | Feb 2025 | — | No | ModNegligence | $151 | $151 |
| 6177918 | Portable Crusher #2 Brown, WI | Nov 2024 | — | No | HighNegligence | $151 | $151 |
| 6177914 | Bonduel Wash Plant Shawano, WI | Nov 2024 | — | No | ModNegligence | $151 | $151 |
| 6177913 | Bonduel Wash Plant Shawano, WI | Nov 2024 | — | No | ModNegligence | $151 | $151 |
| 6177912 | Bonduel Wash Plant Shawano, WI | Nov 2024 | — | No | ModNegligence | $151 | $151 |
| 6177911 | Peters Wash Plant Brown, WI | Nov 2024 | — | No | ModNegligence | $151 | $151 |
| 9627746 | Portable Crusher #2 Brown, WI | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9627745 | Portable Crusher #2 Brown, WI | Sep 2024 | — | No | HighNegligence | $147 | $147 |
| 9627744 | Portable Crusher #2 Brown, WI | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9627743 | Portable Crusher #2 Brown, WI | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9627742 | Portable Crusher #2 Brown, WI | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9627741 | Portable Crusher #2 Brown, WI | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 8672283 | Generator 750 KW Brown, WI | Aug 2024 | — | No | LowNegligence | $147 | $147 |
| 9693985 | Peters Wash Plant Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627394 | Bonduel Wash Plant Shawano, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627480 | Superior Wash Plant #1 Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627479 | Superior Wash Plant #1 Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627477 | Superior Wash Plant #1 Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627476 | Generator 225 KW Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627475 | Generator 225 KW Brown, WI | Aug 2024 | — | No | LowNegligence | $147 | $147 |
| 9627474 | Generator 225 KW Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9627473 | Generator 225 KW Brown, WI | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9694153 | Kleemann 1 Brown, WI | Mar 2024 | — | No | ModNegligence | $147 | $147 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in WI — for PETERS CONCRETE COMPANY, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other PETERS CONCRETE COMPANY locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 representation
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 30-RD-001413 | Representation election | Jul 2004 | Sep 2004 | Closed | Region 18, Minneapolis, Minnesota |
| 30-RD-001392 | Representation election | Feb 2004 | Mar 2004 | Closed | Region 18, Minneapolis, Minnesota |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for PETERS CONCRETE COMPANY. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for PETERS CONCRETE COMPANY. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for PETERS CONCRETE COMPANY. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2017-08-17 | Planned | 0 | — | $0 | |
| 1997-09-18 | Planned | 3 | 2 | $100 | |
| 1992-06-15 | Unprogrammed Related | 5 | 5 | $1,250 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in water and sewer line and related structures construction within WI, ordered by federal enforcement volume:
- MUSSON BROTHERS INCTWO RIVERS — 3 federal enforcement records
- MICHELS CORPORATIONMILWAUKEE — 3 federal enforcement records
- SPEEDWAY SAND & GRAVEL, INC.MADISON — 3 federal enforcement records
- R & R WASH MATERIALS INCPOY SIPPI — 3 federal enforcement records
- MICHELS CORPORATIONMILWAUKEE — 3 federal enforcement records
- PETERS CONCRETE COMPANYGREEN BAY — 3 federal enforcement records
- SPEEDWAY SAND & GRAVEL, INC.VERONA — 3 federal enforcement records
- PETERS CONCRETE COMPANYBRILLION — 3 federal enforcement records
- NORTHERN INTERSTATE CONSTRUCTION INCSUPERIOR — 3 federal enforcement records
- SPEEDWAY SAND & GRAVEL, INC.MADISON — 3 federal enforcement records
Related searches
- Water and Sewer Line and Related Structures ConstructionAll employers in this industry
- Employers in WIState-wide enforcement data
- Water and Sewer in WIIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on PETERS CONCRETE COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is PETERS CONCRETE COMPANY's OSHA violation history?
- PETERS CONCRETE COMPANY has 3 OSHA inspections on record with 8 violations and $1,350 in total penalties.
- How does PETERS CONCRETE COMPANY's safety record compare to its industry?
- PETERS CONCRETE COMPANY operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9.