Skip to main content

Establishment profile

LAWRIE TECHNOLOGY, INC.

227 HATHAWAY STREET, GIRARD, PA, 16417

Download as PDF →

OSHA inspections
1
over 31 years
Violations
11
$4,500 in penalties
Penalties
$4,500
$409 avg

Summary

LAWRIE TECHNOLOGY, INC. has accumulated 11 OSHA violations across 1 inspection over 31 years of recorded history, with $4,500 in total assessed penalties.

The establishment sits in the 89th percentile for violations within its industry-state peer group of 72,992 employers. The most recent enforcement activity was recorded 31 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

LAWRIE TECHNOLOGY, INC. appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.0 / yr · last 31 yrs
Violations
11
0.4 / yr
Penalties
$4,500
$409 avg / violation
73% serious27% other
Inspection trigger · complaint
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 11 distinct standards shown · 11 citations in this view · $4,500 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0151 C11$1,500Mar 1995Mar 1995
29 CFR 1910.1200 E0111$1,500Mar 1995Mar 1995
29 CFR 1910.0134 A0211$1,500Mar 1995Mar 1995
29 CFR 1910.0134 F0111Mar 1995Mar 1995
29 CFR 1910.1025 D0211Mar 1995Mar 1995
29 CFR 1910.1027 D01 I11Mar 1995Mar 1995
29 CFR 1910.1200 F05 I11Mar 1995Mar 1995
29 CFR 1910.1200 F05 II11Mar 1995Mar 1995
29 CFR 1910.1200 H11Mar 1995Mar 1995
29 CFR 1910.0134 B0111Mar 1995Mar 1995
29 CFR 1910.0134 B0311Mar 1995Mar 1995

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

89th

Worse on violations than most other employers. Peer group: 72,992 employers. This establishment has 11 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
97th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for LAWRIE TECHNOLOGY, INC.. Verify directly with OSHA Injury Tracking Application

Inspection breakdown

Complaint
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for LAWRIE TECHNOLOGY, INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
31 years ago

No federal enforcement activity has been recorded against this establishment in 31+ years. Most recent activity: 31 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for LAWRIE TECHNOLOGY, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for LAWRIE TECHNOLOGY, INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for LAWRIE TECHNOLOGY, INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for LAWRIE TECHNOLOGY, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for LAWRIE TECHNOLOGY, INC.. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
1863058
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for LAWRIE TECHNOLOGY, INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$1.6M
Awards
7
Top agency
National Aeronautics and Space Administration
$972K
Top agencies by obligation (this location)
National Aeronautics and Space Administration$972K
Department of Defense$580K
Largest awards
  • National Aeronautics and Space Administration
    FULLY INTEGRAL, FLEXIBLE COMPOSITE DRIVESHAFT AN ALL-COMPOSITE DRIVESHAFT INCORPORATING INTEGRAL FLEXIBLE DIAPHRAGMS IS DESCRIBED AND PROPOSED FOR PHASE II PRIME CONRACTOR TESTING. THE APPROACH OBSOLETES THE SPLIT LINES REQUIRED TO ATTACH METALLIC FLEX ELEMENTS AND EITHER METALLIC OR COMPOSITE SPACING TUBES IN CURRENT SOLUTIONS. SUB-CRITICAL DRIVESHAFT WEIGHTS HALF THAT OF INCUMBENT TECHNOLOGY ARE ACHIEVABLE FOR TYPICAL ROTARY WING SHAFT LENGTHS. SPACING TUBES ARE DESCRIBED, WHICH COMPRISE AN INTEGRAL PART OF THE INITIAL TOOLING BUT WHICH REMAIN PART OF THE FINISHED SHAFT AND CONTROL NATURAL FREQUENCIES AND TORSIONAL STABILITY. A CONCURRENTLY ENGINEERED MANUFACTURING PROCESS AND DESIGN FOR PERFORMANCE IS DESCRIBED WHICH COMPETES WITH INCUMBENT SOLUTIONS AT SIGNIFICANTLY LOWER WEIGHT AND WITH THE PROBABILITY OF IMPROVED DAMAGE TOLERANCE AND FATIGUE LIFE. THIS PHASE II PROPOSAL SEEKS TO PRODUCE ADDITIONAL FATIGUE TEST ARTICLES TO SUPPLEMENT THE PAIR OF SHAFTS PROVIDED DURING PHASE I FOR STATIC EVELAUATION. THE PHASE II EFFORT WILL ALSO SUPPORT THE PRIME CONTRACTOR TEST PROGRAM DESIGNED TO RAISE TECHNOLOGY READINESS LEVEL TO 6-7.
    contract · Last action 2011-07-27
    $750,000
  • Department of Defense
    RESEARCH AND DEVELOPMENT
    contract · Last action 2020-07-16
    $499,588
  • National Aeronautics and Space Administration
    AN ALL-COMPOSITE DRIVESHAFT INCORPORATING INTEGRAL FLEXIBLE DIAPHRAGMS IS DESCRIBED AND PROPOSED FOR FURTHER REFINEMENT. AN APPROACH IS EXPLORED WHICH OBSOLETES THE SPLIT LINES AND ASSOCIATED FASTENERS REQUIRED TO ATTACH METALLIC FLEX ELEMENTS AND EITHER METALLIC OR COMPOSITE SPACING TUBES IN CURRENT SOLUTIONS. SUB-CRITICAL DRIVESHAFT WEIGHTS HALF THAT OF INCUMBENT TECHNOLOGY ARE PROJECTED FOR TYPICAL ROTARY WING SHAFT LENGTHS. SPACING TUBES ARE DESCRIBED, WHICH COMPRISE AN INTEGRAL PART OF THE INITIAL TOOLING BUT WHICH REMAIN PART OF THE FINISHED SHAFT AND CONTROL NATURAL FREQUENCIES AND TORSIONAL STABILITY. A CONCURRENTLY ENGINEERED MANUFACTURING PROCESS AND DESIGN FOR PERFORMANCE IS PROPOSED WHICH COMPETES WITH INCUMBENT SOLUTIONS AT SIGNIFICANTLY LOWER WEIGHT AND WITH THE PROBABILITY OF IMPROVED DAMAGE TOLERANCE AND FATIGUE LIFE. THIS PHASE I PROPOSAL SEEKS TO FURTHER REMOVE MANUFACTURING COST AND TO PRODUCE TEST ARTICLES SUITABLE FOR CONCEPT VERIFICATION AND SUBSEQUENTLY FLIGHT QUALIFICATION DURING PHASE II.
    contract · Last action 2008-01-30
    $99,999
  • Department of Defense
    IGF::OT::IGF STATUS REPORT
    contract · Last action 2015-09-28
    $80,000
  • National Aeronautics and Space Administration
    IGF::OT::IGF ANALYSES SUPPORT OF NASA MECHANICAL TEST INCLUDING PERFORMANCE WITH BALLISTIC DAMAGE
    contract · Last action 2016-10-24
    $50,000
  • National Aeronautics and Space Administration
    FLEXIBLE COMPOSITE COUPLING
    contract · Last action 2012-05-30
    $46,500
  • National Aeronautics and Space Administration
    FABRICATED VACUUM TUBES
    contract · Last action 2021-01-27
    $25,730

Federal contract dollars to this establishment. Primary NAICS: 541712 - RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY). Last action: 2021-01-27. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1995-01-12Complaint118$4,500

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on LAWRIE TECHNOLOGY, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is LAWRIE TECHNOLOGY, INC.'s OSHA violation history?
LAWRIE TECHNOLOGY, INC. has 1 OSHA inspection on record with 11 violations and $4,500 in total penalties.