Establishment profile
KNIFE RIVER CORPORATION-NORTHWEST
23505 PEORIA RD, HARRISBURG, OR, 97446
327390 — Other Concrete Product Manufacturing
Summary
KNIFE RIVER CORPORATION-NORTHWEST has accumulated 2 OSHA violations across 1 inspection over 7 years of recorded history, with $540 in total assessed penalties.
The establishment sits in the 37th percentile for violations within its industry-state peer group of 210 employers. The most recent enforcement activity was recorded 7 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
KNIFE RIVER CORPORATION-NORTHWEST appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $540 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0134 L01 | 1 | 1 | $270 | Apr 2019 | Apr 2019 |
| OAR 437-002-0161(5)(A)(A)(I) | 1 | 1 | $270 | Apr 2019 | Apr 2019 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Below average violations in NAICS 3273 within OR. Peer group: 210 employers. This establishment has 2 OSHA violations; peer median is 3.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 7+ years. Most recent activity: 7 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in OR — for KNIFE RIVER CORPORATION-NORTHWEST, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other KNIFE RIVER CORPORATION-NORTHWEST operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 68S&S · $246,125 proposed / $170,001 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8872509 | METRO PORTABLE #3 Columbia, OR | Sep 2023 | — | Yes | HighNegligence | $88,354 | $44,987 |
| 8877723 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Oct 2018 | — | Yes | HighNegligence | $30,456 | $15,550 |
| 8599426 | ROGUE PORTABLE #3 Jackson, OR | Nov 2010 | — | No | Reckless | $12,900 | $10,500 |
| 8693600 | ROGUE PORTABLE #3 Jackson, OR | Jan 2013 | — | Yes | HighNegligence | $8,000 | $3,784 |
| 8872511 | METRO PORTABLE #3 Columbia, OR | Sep 2023 | — | Yes | HighNegligence | $5,013 | $5,013 |
| 9617328 | METRO PORTABLE #5 Clackamas, OR | Aug 2022 | — | Yes | ModNegligence | $4,507 | $4,507 |
| 8599428 | ROGUE PORTABLE #3 Jackson, OR | Nov 2010 | — | Yes | HighNegligence | $4,500 | $4,500 |
| 8599427 | ROGUE PORTABLE #3 Jackson, OR | Nov 2010 | — | Yes | ModNegligence | $4,440 | $3,500 |
| 9439643 | METRO PORTABLE #3 Columbia, OR | Oct 2019 | — | Yes | HighNegligence | $4,121 | $4,121 |
| 7967314 | WILLAMETTE PORTABLE #1 Clatsop, OR | Jul 2009 | — | No | ModNegligence | $3,143 | $634 |
| 6479743 | REED PIT Marion, OR | Jul 2009 | — | Yes | HighNegligence | $2,341 | $1,100 |
| 6346753 | REED PIT Marion, OR | Jul 2003 | — | Yes | HighNegligence | $2,200 | $2,200 |
| 9376370 | METRO PORTABLE #2 Multnomah, OR | Jan 2019 | — | Yes | HighNegligence | $2,172 | $2,172 |
| 9891703 | ROGUE PORTABLE #9 Douglas, OR | Sep 2024 | — | Yes | HighNegligence | $2,079 | $2,079 |
| 9891702 | ROGUE PORTABLE #9 Douglas, OR | Sep 2024 | — | Yes | HighNegligence | $2,079 | $2,079 |
| 8993461 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Jul 2018 | — | Yes | HighNegligence | $2,007 | $2,007 |
| 6479742 | REED PIT Marion, OR | Jul 2009 | — | Yes | ModNegligence | $2,000 | $293 |
| 6479741 | REED PIT Marion, OR | Jul 2009 | — | Yes | HighNegligence | $2,000 | $1,000 |
| 8993076 | ROGUE PORTABLE #3 Jackson, OR | Apr 2018 | — | Yes | HighNegligence | $1,806 | $1,806 |
| 8559783 | Ball Road Quarry Clackamas, OR | Oct 2024 | — | Yes | ModNegligence | $1,773 | $1,773 |
| 8994000 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Oct 2018 | — | Yes | ModNegligence | $1,666 | $1,666 |
| 6398628 | METRO PORTABLE #3 Columbia, OR | Aug 2008 | — | Yes | HighNegligence | $1,657 | $1,657 |
| 6398627 | METRO PORTABLE #3 Columbia, OR | Aug 2008 | — | Yes | HighNegligence | $1,657 | $1,657 |
| 8694409 | METRO PORTABLE #2 Multnomah, OR | Nov 2013 | — | Yes | HighNegligence | $1,412 | $1,412 |
| 7967312 | WILLAMETTE PORTABLE #1 Clatsop, OR | Jul 2009 | — | No | ModNegligence | $1,412 | $127 |
| 8604187 | Farmington Pit Washington, OR | Jan 2025 | — | No | ModNegligence | $1,320 | $1,320 |
| 6346754 | REED PIT Marion, OR | Jul 2003 | — | Yes | HighNegligence | $1,300 | $1,300 |
| 6389745 | REED PIT Marion, OR | Dec 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6389744 | REED PIT Marion, OR | Dec 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6389742 | REED PIT Marion, OR | Nov 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383613 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383612 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383611 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383610 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383606 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383605 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 6383602 | REED PIT Marion, OR | Feb 2006 | — | No | ModNegligence | $1,238 | $1,238 |
| 9439456 | WILLAMETTE PORTABLE #2 Douglas, OR | Oct 2019 | — | Yes | ModNegligence | $1,175 | $1,175 |
| 6383609 | REED PIT Marion, OR | Feb 2006 | — | Yes | LowNegligence | $963 | $963 |
| 8559077 | WATERVIEW Columbia, OR | Apr 2010 | — | Yes | ModNegligence | $946 | $128 |
| 8559679 | REED PIT Marion, OR | Jan 2023 | — | Yes | ModNegligence | $927 | $927 |
| 9891484 | Farmington Pit Washington, OR | Aug 2024 | — | Yes | ModNegligence | $861 | $861 |
| 9612425 | WATERVIEW Columbia, OR | May 2021 | — | Yes | ModNegligence | $856 | $856 |
| 9612306 | METRO PORTABLE #3 Columbia, OR | Jan 2021 | — | No | ModNegligence | $856 | $856 |
| 9891224 | KIRTLAND Jackson, OR | Apr 2024 | — | No | ModNegligence | $797 | $165 |
| 9891222 | KIRTLAND Jackson, OR | Apr 2024 | — | Yes | ModNegligence | $797 | $797 |
| 8877727 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Oct 2018 | — | No | ModNegligence | $768 | $768 |
| 9376312 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Nov 2018 | — | No | ModNegligence | $749 | $749 |
| 8877724 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Oct 2018 | — | No | ModNegligence | $749 | $749 |
| 6398626 | METRO PORTABLE #3 Columbia, OR | Aug 2008 | — | Yes | HighNegligence | $745 | $745 |
| 9376926 | ROGUE PORTABLE #6 Klamath, OR | Jul 2019 | — | No | ModNegligence | $708 | $400 |
| 7967373 | FISHER ISLAND PLANT Benton, OR | Feb 2010 | — | Yes | HighNegligence | $687 | $687 |
| 6485551 | FISHER ISLAND PLANT Benton, OR | Jul 2009 | — | No | HighNegligence | $687 | $154 |
| 9617104 | COFFEE LAKE POND Washington, OR | Jan 2022 | — | Yes | HighNegligence | $662 | $662 |
| 9376411 | KIRTLAND Jackson, OR | Jan 2019 | — | Yes | ModNegligence | $654 | $654 |
| 9617521 | ROGUE PORTABLE #8 Deschutes, OR | Apr 2025 | — | Yes | ModNegligence | $642 | $642 |
| 8599680 | WATERVIEW Columbia, OR | Jul 2011 | — | Yes | ModNegligence | $634 | $634 |
| 9891939 | ROGUE PORTABLE #3 Jackson, OR | Nov 2024 | — | Yes | ModNegligence | $626 | $626 |
| 9891902 | ROGUE PORTABLE #8 Deschutes, OR | Oct 2024 | — | Yes | ModNegligence | $626 | $626 |
| 9504904 | KIRTLAND Jackson, OR | Aug 2020 | — | Yes | ModNegligence | $615 | $615 |
| 6389743 | REED PIT Marion, OR | Dec 2006 | — | No | LowNegligence | $614 | $614 |
| 6383608 | REED PIT Marion, OR | Feb 2006 | — | No | LowNegligence | $614 | $614 |
| 6383604 | REED PIT Marion, OR | Feb 2006 | — | No | LowNegligence | $614 | $614 |
| 8568462 | WILLAMETTE PORTABLE #3 Linn, OR | Feb 2023 | — | Yes | ModNegligence | $606 | $606 |
| 6479745 | REED PIT Marion, OR | Jul 2009 | — | Yes | ModNegligence | $585 | $585 |
| 6479744 | REED PIT Marion, OR | Jul 2009 | — | Yes | ModNegligence | $585 | $585 |
| 6479737 | REED PIT Marion, OR | Jul 2009 | — | Yes | ModNegligence | $585 | $585 |
| 6398351 | REED PIT Marion, OR | May 2008 | — | No | ModNegligence | $585 | $585 |
| 8877880 | KIRTLAND Jackson, OR | Dec 2016 | — | Yes | ModNegligence | $577 | $577 |
| 9612427 | WATERVIEW Columbia, OR | May 2021 | — | Yes | ModNegligence | $574 | $574 |
| 9439642 | METRO PORTABLE #3 Columbia, OR | Oct 2019 | — | Yes | ModNegligence | $558 | $558 |
| 9376580 | ROGUE PORTABLE #4 Jackson, OR | Apr 2019 | — | Yes | HighNegligence | $558 | $558 |
| 6479518 | WATERVIEW Columbia, OR | Jul 2009 | — | Yes | ModNegligence | $540 | $540 |
| 9612267 | ROGUE PORTABLE #3 Jackson, OR | Jun 2021 | — | Yes | ModNegligence | $530 | $530 |
| 9439457 | WILLAMETTE PORTABLE #2 Douglas, OR | Oct 2019 | — | Yes | ModNegligence | $527 | $527 |
| 9439493 | ROGUE PORTABLE #5 Jackson, OR | Dec 2019 | — | Yes | LowNegligence | $523 | $261 |
| 8993437 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Jun 2018 | — | Yes | ModNegligence | $502 | $502 |
| 8993436 | CENTRAL OREGON PORTABLE #2 Deschutes, OR | Jun 2018 | — | Yes | ModNegligence | $502 | $502 |
| 8559904 | REED PIT Marion, OR | Aug 2011 | — | No | ModNegligence | $499 | $499 |
| 8599653 | FISHER ISLAND PLANT Benton, OR | Apr 2011 | — | No | ModNegligence | $499 | $499 |
| 6398618 | METRO PORTABLE #3 Columbia, OR | Aug 2008 | — | Yes | ModNegligence | $499 | $499 |
| 6430466 | METRO PORTABLE #3 Columbia, OR | Feb 2008 | — | Yes | ModNegligence | $499 | $499 |
| 9612601 | METRO PORTABLE #5 Clackamas, OR | May 2021 | — | Yes | ModNegligence | $487 | $487 |
| 9612195 | METRO PORTABLE #5 Clackamas, OR | May 2021 | — | Yes | HighNegligence | $487 | $487 |
| 9612193 | METRO PORTABLE #5 Clackamas, OR | May 2021 | — | Yes | ModNegligence | $487 | $487 |
| 9504757 | REED PIT Marion, OR | Aug 2020 | — | Yes | LowNegligence | $448 | $448 |
| 6389770 | METRO PORTABLE #3 Columbia, OR | Dec 2006 | — | Yes | ModNegligence | $440 | $440 |
| 8782464 | METRO PORTABLE #2 Multnomah, OR | Apr 2014 | — | Yes | ModNegligence | $425 | $425 |
| 8782144 | ROGUE PORTABLE #2 Klamath, OR | Apr 2014 | — | Yes | ModNegligence | $425 | $425 |
| 8694408 | METRO PORTABLE #2 Multnomah, OR | Nov 2013 | — | Yes | ModNegligence | $425 | $425 |
| 9612225 | ROGUE PORTABLE #1 Jackson, OR | Mar 2021 | — | No | ModNegligence | $416 | $416 |
| 6362681 | REED PIT Marion, OR | Jun 2004 | — | Yes | ModNegligence | $409 | $409 |
| 8694444 | ROGUE PORTABLE #3 Jackson, OR | Jan 2014 | — | Yes | ModNegligence | $392 | $392 |
| 8685565 | ROGUE PORTABLE #1 Jackson, OR | Aug 2013 | — | Yes | ModNegligence | $392 | $392 |
| 8559637 | WILLAMETTE PORTABLE #1 Clatsop, OR | Apr 2013 | — | Yes | ModNegligence | $392 | $392 |
| 8604626 | ROGUE PORTABLE #7 Crook, OR | Feb 2012 | — | Yes | ModNegligence | $392 | $392 |
| 9612424 | WATERVIEW Columbia, OR | May 2021 | — | No | ModNegligence | $383 | $383 |
| 9612004 | FISHER ISLAND PLANT Benton, OR | Oct 2020 | — | No | HighNegligence | $378 | $378 |
| 6389741 | REED PIT Marion, OR | Nov 2006 | — | No | LowNegligence | $375 | $375 |
| 9439640 | METRO PORTABLE #3 Columbia, OR | Oct 2019 | — | No | HighNegligence | $372 | $372 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for KNIFE RIVER CORPORATION-NORTHWEST. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2019-01-22 | Complaint | 2 | 2 | $540 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in other concrete product manufacturing within OR, ordered by federal enforcement volume:
- KNIFE RIVER CORPTROUTDALE — 2 federal enforcement records
- KNIFE RIVER CORPORATION - NORTHWESTLAKE OSWEGO — 2 federal enforcement records
- OREGON WILBERT VAULT & CASKET CO DBACLACKAMAS — 2 federal enforcement records
- PLYCEM USA LLCWHITE CITY — 1 federal enforcement record
- SC CONCRETE PRODUCTS INCPORTLAND — 1 federal enforcement record
- SUHOR INDUSTRIES INCCLACKAMAS — 1 federal enforcement record
- JERZY INCPORTLAND — 1 federal enforcement record
- KNIFE RIVER CORPORATION - NORTHWESTMCMINNVILLE — 1 federal enforcement record
- MORSE BROS INCLEBANON — 1 federal enforcement record
- JENSEN ENTERPRISES INCPORTLAND — 1 federal enforcement record
Related searches
- Other Concrete Product ManufacturingAll employers in this industry
- Employers in ORState-wide enforcement data
- Other Concrete Product in ORIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on KNIFE RIVER CORPORATION-NORTHWEST from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is KNIFE RIVER CORPORATION-NORTHWEST's OSHA violation history?
- KNIFE RIVER CORPORATION-NORTHWEST has 1 OSHA inspection on record with 2 violations and $540 in total penalties.
- How does KNIFE RIVER CORPORATION-NORTHWEST's safety record compare to its industry?
- KNIFE RIVER CORPORATION-NORTHWEST operates in the other concrete product manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 4.9.