Skip to main content

Establishment profile

JOHNSON ROCK PRODUCTS INC

10TH ST & 8TH TERRACE, COOS BAY, OR, 97420
237310Highway, Street, and Bridge Construction
EIN 930461038

Download as PDF →

OSHA inspections
18
over 42 years
Violations
24
$1,680 in penalties
SVEP
YES
Severe violator program
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
6 National Emphasis Program inspections

Summary

JOHNSON ROCK PRODUCTS INC has accumulated 24 OSHA violations across 18 inspections over 42 years of recorded history, with $1,680 in total assessed penalties.

The establishment sits in the 98th percentile for violations within its industry-state peer group of 706 employers. Inspection frequency runs at the 99th percentile. The most recent enforcement activity was recorded 13 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

JOHNSON ROCK PRODUCTS INC appears in OSHA workplace safety, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
18
0.4 / yr · last 42 yrs
Violations
24
0.6 / yr
Penalties
$1,680
$70 avg / violation
38% serious62% other
Inspection trigger · planned
18 of 18

61% of inspections at this establishment produced violations, with 8 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 20 citations in this view · $1,680 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0652 C11$375Apr 2010Apr 2010
29 CFR 1926.0601 B0411$265Sep 1997Sep 1997
29 CFR 1910.0147 C0111$165Nov 2001Nov 2001
29 CFR 1926.0651 K0111$150Jul 1991Jul 1991
29 CFR 1926.0652 A0111$150Jul 1991Jul 1991
29 CFR 1926.0302 B0111$120May 1993May 1993
29 CFR 1926.0652 H11$110Jun 1989Jun 1989
29 CFR 7833.43611$110Dec 1987Dec 1987
29 CFR 7833.57611$95Sep 1987Sep 1987
29 CFR 7030.100 A11$75Jun 1989Jun 1989
29 CFR 7833.45611$65Sep 1987Sep 1987
29 CFR 7020.22801 K11Nov 2001Nov 2001
29 CFR 7020.02203 F11Nov 2001Nov 2001
29 CFR 1910.0157 C0111Nov 2001Nov 2001
29 CFR 1926.0103 F0111Nov 2001Nov 2001
29 CFR 1926.0103 E0111Nov 2001Nov 2001
29 CFR 1926.0601 B1411Nov 2001Nov 2001
29 CFR 1926.0103 C0111Nov 2001Nov 2001
29 CFR 7020.04202 A11Nov 2001Nov 2001
29 CFR 1926.0103 H02 I11Nov 2001Nov 2001

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

98th

Worse on violations than nearly every other employer in NAICS 2373 within OR. Peer group: 706 employers. This establishment has 24 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
85th
peer median: $100
Inspection frequency
99th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.5
TRIR
5.1
vs industry
+2.6

Reported for 19 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.5
BLS SOII 2024
Industry avg DART
1.5
BLS SOII 2024
Self-reported TRIR
5.1
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
18

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for JOHNSON ROCK PRODUCTS INC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
13 years ago

No federal enforcement activity has been recorded against this establishment in 13+ years. Most recent activity: 13 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for JOHNSON ROCK PRODUCTS INC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in OR — for JOHNSON ROCK PRODUCTS INC, not this location alone

Violations
1
Assessed penalties
$807

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other JOHNSON ROCK PRODUCTS INC operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 1 citation · 1S&S · 1 contractor · $807 proposed / $807 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
8559553
Weekly Pit
Coos, OR
contractor: Johnson Rock Products Inc.
Mar 2011YesHighNegligence$807$807

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for JOHNSON ROCK PRODUCTS INC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for JOHNSON ROCK PRODUCTS INC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for JOHNSON ROCK PRODUCTS INC. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
350169
Operation
C

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for JOHNSON ROCK PRODUCTS INC. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$7.8M
Obligated (all-time)
$20.4M
Awards
85
Top agency
Department of Agriculture
$18.4M
Top agencies by obligation (this location)
Department of Agriculture$18.4M
Department of the Interior$1.1M
Department of Transportation$876K
Largest awards (top 50 of 85)
  • Department of Agriculture
    PROVIDE ALL EQUIPMENT, LABOR, MATERIALS, SUPPLIES AND SUPERVISION TO REPAIR NINE ROAD FAILURE SITES WITHIN THE GOLD BEACH AND POWERS RANGER DISTRICTS APPROVED FOR THE 2019 ERFO EVENT IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS.
    contract · Last action 2024-05-29
    $3,080,516
  • Department of Agriculture
    GAOA - THIS PROJECT CONSISTS OF ALL WORK AND FURNISHING THE NECESSARY MATERIALS RELATING TO THE REMOVAL OF EXISTING ASPHALT, ROADWAY EXCAVATION AND BACKFILL, REMOVAL AND REPLACEMENT OF GUARDRAIL, INSTALLATION OF MECHANICALLY STABILIZED EARTH WALLS, P
    contract · Last action 2024-07-31
    $2,245,685
  • Department of Agriculture
    REPAIR WORK ON FOREST SERVICE ROAD 4800000 (HAPPY CAMP ROAD) ON THE WILD RIVERS RANGER DISTRICT IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS.
    contract · Last action 2024-12-09
    $1,401,978
  • Department of Agriculture
    ERFO 2017-1
    contract · Last action 2020-11-17
    $1,060,050
  • Department of Transportation
    IGF::CT::IGF OR FS ERFO 121-1901 AGNESS ROAD SLIDE REPAIR AT FSR 3348
    contract · Last action 2014-05-28
    $875,688
  • Department of Agriculture
    GAOA ODNRA ROAD REPAIRS
    contract · Last action 2022-03-10
    $848,819
  • Department of Agriculture
    SECOND CREEK-AQUATIC ORGANISM PASSAGE CULVERT REPLACEMENT
    contract · Last action 2018-09-25
    $825,982
  • Department of Agriculture
    RRS ERFO 2023 EAST ROAD REPAIRS
    contract · Last action 2025-04-16
    $636,042
  • Department of Agriculture
    UPPER ROGUE RIVER CORRIDOR ENHANCEMENTS ROGUE RIVER-SISKIYOU NATIONAL FOREST HIGH CASCADES RANGER DISTRICT
    contract · Last action 2013-09-16
    $625,741
  • Department of Agriculture
    AAP# 06SO1011 49251 M. GIULIANI RD MNTC-POWERS RD-FSR 33 AT MP 54.5
    contract · Last action 2012-02-06
    $603,506
  • Department of Agriculture
    IGF::OT::IGF FOR OTHER FUNCTIONS CLEARING, GRUBBING, EXCAVATION, AGGREGATE BASE, WALL CONSTRUCTION AND EROSION CONTROL OF SITE.
    contract · Last action 2016-07-11
    $434,464
  • Department of Agriculture
    MULTI-AGENCY ROAD CONSTRUCTION IDIQ (2016) - ERFO 2017-2 - WILD RIVERS AND SISKIYOU MOUNTAIN RANGER DISTRICTS, ROGUE RIVER-SISKIYOU NF JACKSON AND JOSEPHINE COUNTIES, OREGON THIS INDIVIDUAL PROJECT TASK ORDER CONTRACT INCLUDES THE TERMS AND CONDITI
    contract · Last action 2020-06-18
    $401,673
  • Department of Agriculture
    RD 3500 AND 3505 PAYCO, TASK ORDER TO IDIQ CONSTRUCTION CONTRACT
    contract · Last action 2009-06-26
    $388,334
  • Department of Agriculture
    FRISSELL BOAT LAUNCH IGF::OT::IGF
    contract · Last action 2016-04-22
    $385,364
  • Department of Agriculture
    FY11 LEGACY FS ROAD 1200 CULVERT REPLACEMENT
    contract · Last action 2012-10-25
    $312,495
  • Department of Agriculture
    IGF::OT::IGF
    contract · Last action 2014-11-19
    $268,013
  • Department of the Interior
    WEST FORK CANYON CREEK BRIDGE REPLACEMENT
    contract · Last action 2010-01-14
    $262,595
  • Department of Agriculture
    TAS::12 1102::TAS - RECOVERY - AGNESS ROAD PHASE II RECONSTRUCTION - ROGUE RIVER-SISKIYOU NATIONAL FOREST
    contract · Last action 2010-09-07
    $262,260
  • Department of Agriculture
    REGION 6 ROAD AND BRIDGE CONSTRUCTION BPA NO. 1204T020A0018 - NFSR 5000 PAVING - POWERS RANGER DISTRICT, ROGUE RIVER-SISKIYOU NF - COOS COUNTY, OREGON THIS INDIVIDUAL PROJECT BPA CALL ORDER CONTRACT INCLUDES ALL THE TERMS AND CONDITIONS OF THE R6 RO
    contract · Last action 2021-02-18
    $248,065
  • Department of Agriculture
    IGF::OT::IGF FOR OTHER FUNCTIONS COPPER SALMON WILDERNESS LEGACY ROADS PROJECT
    contract · Last action 2015-10-20
    $231,827
  • Department of Agriculture
    PROVIDES PLACEMENT OF SLURRY SEAL TO NFSR 2643
    contract · Last action 2025-08-19
    $229,393
  • Department of Agriculture
    IGF::OT::IGF 2014 TILLER RANGER DISTRICT AOP PROJECTS, CMLG15 TALLOW
    contract · Last action 2015-09-10
    $222,637
  • Department of Agriculture
    BIG B OPTED ROAD RECONSTRUCTION
    contract · Last action 2013-09-18
    $212,649
  • Department of Agriculture
    2016 MULTI-AGENCY ROAD CONSTRUCTION IDIQ FREMONT-WINEMA, MT. HOOD, ROGUE RIVER-SISKIYOU, SIUSLAW, UMPQUA AND WILLAMETTE NATIONAL FORESTS, COLUMBIA RIVER GORGE NATIONAL SCENIC AREA, COOS BAY, EUGENE, MEDFORD, ROSEBURG, AND SALEM DISTRICTS (BUREAU OF LAND MANAGEMENT) MINIMUM GUARANTEE IGF::OT::IGF
    contract · Last action 2020-07-06
    $196,340
  • Department of Agriculture
    3278 STWD/ERFO PROJECT
    contract · Last action 2009-11-19
    $194,574
  • Department of Agriculture
    ROAD 55 AND 32 PAYCO ROAD STABILIZATION PUBLIC WORKS CONTRACT
    contract · Last action 2013-07-17
    $190,109
  • Department of Agriculture
    FARMER-BUNN CREEK CULVERTS 2014, CMLG12 IGF::OT::IGF
    contract · Last action 2014-09-02
    $186,624
  • Department of Agriculture
    06SO1009 40310 REPAIR FSR 3348, MP 4.2 ON POWERS RANGER DISTRICT OF THE ROGUE RIVER-SISKIYOU NATIONAL FOREST
    contract · Last action 2010-09-15
    $176,338
  • Department of Agriculture
    ROAD 32 M.P. 4.9 ERFO IGF::OT::IGF
    contract · Last action 2015-08-14
    $171,805
  • Department of Agriculture
    NORTHROP - AAP # 06SO1011 51419 CULVERT REPLACEMENT, FSR 4611000
    contract · Last action 2013-06-07
    $162,311
  • Department of the Interior
    SMITH RIVER HELIPOND RESTORATION
    contract · Last action 2010-01-13
    $159,872
  • Department of Agriculture
    M. GIULIANI - ERFO REPAIRS - FSR 3300000, MP 53.1
    contract · Last action 2012-09-06
    $157,950
  • Department of Agriculture
    TAS::12 1102::TAS CIM-0612-06F RECREATION SITE SURFACING REHAB (PHASE 1) COASTAL TOURISM INFRASTRUCTURE RESTORATION. REMOVAL OF EXISTING BITUMINOUS SURFACE TREATMENT & ASPHALT CONCRETE, ROAD RECONDITIONING, SLURRY SEAL PLACEMENT, ASPHALT PLACEMENT, STRIPING, INSTALLING WHEELSTOPS, INSTALLING SIGNS, AND PAVEMENT MARKINGS.
    contract · Last action 2010-08-19
    $157,295
  • Department of Agriculture
    DEEP CREEK CULVERT REPLACEMENT
    contract · Last action 2012-02-01
    $151,988
  • Department of Agriculture
    NFSR 5840537 MP 0.3 SITE REPAIR AND NFSR 5850 MP 1.5 SITE REPAIR
    contract · Last action 2021-04-22
    $149,686
  • Department of the Interior
    SLIDE CK&CHINA CK CULVERT REPLACEMENTS
    contract · Last action 2012-12-09
    $146,220
  • Department of Agriculture
    FINN ROCK BRIDGE RAIL REPLACEMENT IGF::OT::IGF
    contract · Last action 2018-06-25
    $143,465
  • Department of Agriculture
    NORTH FORK SEDIMENT REDUCTION ROAD 48 SEGMENT 2
    contract · Last action 2008-10-30
    $125,334
  • Department of the Interior
    IGF::OT::IGF CAMP CREEK CULVERT REPLACEMENT, DOUGLAS COUNTY, COOS BAY DISTRICT, OREGON.
    contract · Last action 2017-10-11
    $123,621
  • Department of Agriculture
    IGF::OT::IGF JOHNSON ROCK PRODUCTS, INC.
    contract · Last action 2016-09-12
    $115,021
  • Department of the Interior
    ARMITAGE ROAD RECONSTRUCTION, EUGENE DISTRICT
    contract · Last action 2013-02-28
    $114,524
  • Department of Agriculture
    IGF::OT::IGF THIS PROJECT IS FOR SURFACE PATCH OF FSR 33, MP 20.3. THE WORK INCLUDES BUT IS NOT LIMITED TO EXCAVATION, PLACING CONSERVED MATERIAL AND BASE AGGREGATE, PAVING AND STRIPING.
    contract · Last action 2015-10-30
    $105,767
  • Department of the Interior
    BIG RIVER CULVERT
    contract · Last action 2008-08-20
    $103,637
  • Department of Agriculture
    TAS::12 1102::TAS RECOVERY CAMP THIN HAUL ROUTE RECONSTRUCTION, SIUSLAW NATIONAL FOREST, ALSEA, OR.
    contract · Last action 2010-12-21
    $95,900
  • Department of the Interior
    IGF::OT::IGF CB LOWER SMITH RIVER PAVING 3-BARNS COR.
    contract · Last action 2014-04-14
    $93,390
  • Department of Agriculture
    BAER BRATTAIN FIRE GUARDRAIL REPLACEMENT
    contract · Last action 2021-08-16
    $89,830
  • Department of Agriculture
    REPLACE THE EXISTING FAILED CULVERT ON FOREST SERVICE ROAD 3353 AT MILEPOST 5.4 WITH A 55-INCH-DIAMETER CULVERT IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS.
    contract · Last action 2025-07-11
    $89,744
  • Department of Agriculture
    TAS::12 1102::TAS FOR CAPITAL IMPROVEMENT & MAINTENANCE, ROAD 18 SHOULDER REPAIR, TILLER. WORK INCLUDES REMOVAL OF ASPHALT AND EXCAVTION OF SUBGRADE TO DEPTHS SHOWN ON PLANS; LAYOUT AND PLACEMENT OF GEOGRID AND WELDED WIRE FORMS FOR B, C, AND D SUBGRADE REPAIRS; FURNISHING AND PLACING AGGREGATE; REMOVAL OF AGGREGATE LEVELING COURSE; ASPHALT PLACEMENT AND CRACK SEALING.
    contract · Last action 2010-07-29
    $85,994
  • Department of Agriculture
    CAPE COVE TRAIL RECONSTRUCTION PHASE II
    contract · Last action 2009-11-30
    $83,097
  • Department of Agriculture
    ERFO ROAD 2553
    contract · Last action 2008-09-25
    $81,863

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2025-08-19. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2012-10-16Planned0$0
2010-04-13Planned11$375
2005-12-15Planned0$0
2005-10-24Planned0$0
2001-10-23Planned3$0
2001-10-17Planned21$165
2001-10-17Planned5$0
2000-10-31Planned0$0
1999-01-06Planned1$0
1998-12-14Planned0$0
1997-08-18Planned21$265
1993-04-12Planned21$120
1991-07-01Planned22$300
1989-06-06Planned21$185
1988-11-14Programmed Related0$0
1987-12-09Planned1$110
1987-09-02Planned32$160
1984-04-06Planned0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in highway, street, and bridge construction within OR, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on JOHNSON ROCK PRODUCTS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is JOHNSON ROCK PRODUCTS INC's OSHA violation history?
JOHNSON ROCK PRODUCTS INC has 18 OSHA inspections on record with 24 violations and $1,680 in total penalties.
How does JOHNSON ROCK PRODUCTS INC's safety record compare to its industry?
JOHNSON ROCK PRODUCTS INC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. JOHNSON ROCK PRODUCTS INC's self-reported DART rate is 0 compared to an industry average of 1.5.