Establishment profile
GEORGE C. HALL & SONS, INC.
WADSWORTH STREET, THOMASTON, ME, 04861
237310 — Highway, Street, and Bridge Construction
Summary
GEORGE C. HALL & SONS, INC. has accumulated 0 OSHA violations across 1 inspection over 14 years of recorded history.
The most recent federal enforcement activity was recorded 14 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
GEORGE C. HALL & SONS, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2373 within ME. Peer group: 383 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for GEORGE C. HALL & SONS, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for GEORGE C. HALL & SONS, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for GEORGE C. HALL & SONS, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in ME — for GEORGE C. HALL & SONS, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other GEORGE C. HALL & SONS, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 34S&S · 100 contractor · $32,785 proposed / $16,586 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9364234 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Aug 2017 | — | Yes | LowNegligence | $2,438 | $1,119 |
| 9364246 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | No | ModNegligence | $2,250 | — |
| 9364243 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | Yes | ModNegligence | $2,250 | $442 |
| 9364242 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | Yes | ModNegligence | $2,250 | $2,014 |
| 9364241 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | No | ModNegligence | $2,250 | $204 |
| 9311997 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | HighNegligence | $1,078 | $1,078 |
| 9364285 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Nov 2017 | — | No | ModNegligence | $1,010 | $204 |
| 9364245 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | No | LowNegligence | $1,010 | — |
| 8919956 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2015 | — | Yes | HighNegligence | $897 | $897 |
| 9311995 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | ModNegligence | $722 | — |
| 9311994 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | ModNegligence | $722 | — |
| 9311993 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | ModNegligence | $722 | — |
| 9364247 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | No | ModNegligence | $504 | — |
| 9364231 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Aug 2017 | — | Yes | LowNegligence | $492 | $492 |
| 9417884 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Apr 2019 | — | Yes | LowNegligence | $474 | $474 |
| 9719165 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2023 | — | Yes | ModNegligence | $376 | — |
| 9311990 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | HighNegligence | $324 | — |
| 8919954 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2015 | — | Yes | ModNegligence | $308 | $308 |
| 6538385 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Dec 2009 | — | Yes | ModNegligence | $308 | $308 |
| 8583213 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Nov 2010 | — | No | ModNegligence | $285 | $100 |
| 8802108 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8802106 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8802103 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8798899 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8919957 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2015 | — | Yes | ModNegligence | $243 | $243 |
| 8919953 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2015 | — | Yes | ModNegligence | $243 | $243 |
| 8583249 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Nov 2010 | — | Yes | ModNegligence | $243 | $243 |
| 8583246 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Nov 2010 | — | Yes | LowNegligence | $243 | $100 |
| 6063040 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2008 | — | No | HighNegligence | $224 | $224 |
| 9525645 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | HighNegligence | $217 | $217 |
| 9311998 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | No | HighNegligence | $216 | — |
| 9417883 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Apr 2019 | — | No | ModNegligence | $214 | $214 |
| 9364244 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | No | LowNegligence | $204 | — |
| 9852189 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Dec 2023 | — | Yes | ModNegligence | $189 | $189 |
| 8919955 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2015 | — | No | HighNegligence | $181 | $181 |
| 9804429 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2024 | — | No | HighNegligence | $164 | — |
| 8805407 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2014 | — | No | HighNegligence | $162 | $162 |
| 9666586 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | May 2022 | — | Yes | LowNegligence | $155 | — |
| 9808752 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2025 | — | No | LowNegligence | $151 | $151 |
| 9801996 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 9801995 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 9801994 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 9801993 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jan 2025 | — | Yes | LowNegligence | $151 | $151 |
| 9805283 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2024 | — | No | ModNegligence | $151 | $151 |
| 9805282 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2024 | — | No | ModNegligence | $151 | $151 |
| 9804428 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2024 | — | No | ModNegligence | $147 | — |
| 9804406 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Jun 2024 | — | No | ModNegligence | $147 | — |
| 9804405 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Jun 2024 | — | No | ModNegligence | $147 | — |
| 9804404 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Jun 2024 | — | No | ModNegligence | $147 | — |
| 9804403 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Jun 2024 | — | No | LowNegligence | $147 | — |
| 9852188 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Dec 2023 | — | No | ModNegligence | $147 | $147 |
| 9311996 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | ModNegligence | $145 | $76 |
| 9311992 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | ModNegligence | $145 | — |
| 9311988 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2016 | — | Yes | ModNegligence | $145 | — |
| 9526110 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2020 | — | Yes | ModNegligence | $144 | — |
| 9526109 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2020 | — | Yes | ModNegligence | $144 | — |
| 9719167 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Aug 2023 | — | No | ModNegligence | $143 | — |
| 9719166 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Aug 2023 | — | No | LowNegligence | $143 | $124 |
| 9719164 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2023 | — | No | ModNegligence | $143 | — |
| 9711791 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Nov 2022 | — | No | ModNegligence | $143 | $143 |
| 9711790 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Nov 2022 | — | No | ModNegligence | $143 | $143 |
| 9711789 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Nov 2022 | — | No | ModNegligence | $143 | $143 |
| 9418473 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Feb 2019 | — | No | ModNegligence | $142 | $142 |
| 8807191 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jun 2015 | — | No | ModNegligence | $127 | $127 |
| 8807190 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jun 2015 | — | No | ModNegligence | $127 | $127 |
| 8648579 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2011 | — | Yes | ModNegligence | $127 | $127 |
| 9660785 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9660784 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9660777 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9660776 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9660775 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9525674 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Nov 2020 | — | No | LowNegligence | $123 | $123 |
| 9525673 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Nov 2020 | — | No | LowNegligence | $123 | $123 |
| 9525652 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9525651 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | LowNegligence | $123 | $123 |
| 9525650 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | LowNegligence | $123 | $123 |
| 9525649 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9525648 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | HighNegligence | $123 | $123 |
| 9525647 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9525646 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Oct 2020 | — | No | LowNegligence | $123 | $123 |
| 9526108 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Mar 2020 | — | No | ModNegligence | $123 | — |
| 9526107 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Dec 2019 | — | No | ModNegligence | $123 | — |
| 9468288 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Nov 2019 | — | No | LowNegligence | $121 | $121 |
| 9468289 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2019 | — | No | LowNegligence | $121 | $121 |
| 9467920 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Sep 2019 | — | No | LowNegligence | $121 | $121 |
| 9462872 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2019 | — | No | LowNegligence | $121 | $121 |
| 9462871 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9462870 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9462869 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9418474 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Feb 2019 | — | No | LowNegligence | $121 | $121 |
| 9414582 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2018 | — | No | LowNegligence | $118 | $118 |
| 9414581 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2018 | — | Yes | ModNegligence | $118 | $118 |
| 9414580 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2018 | — | No | ModNegligence | $118 | $118 |
| 9414579 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Sep 2018 | — | No | ModNegligence | $118 | $118 |
| 9412456 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2018 | — | No | LowNegligence | $118 | — |
| 9412455 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2018 | — | No | ModNegligence | $118 | — |
| 9412454 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | Jul 2018 | — | No | ModNegligence | $118 | — |
| 8802102 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2014 | — | Yes | ModNegligence | $117 | $117 |
| 8802101 | Pease Pit Knox, ME contractor: George C Hall & Sons Inc | May 2014 | — | Yes | ModNegligence | $117 | $117 |
| 9364237 | Washington Pit #2 Knox, ME contractor: George C. Hall & Sons, Inc. | Aug 2017 | — | No | LowNegligence | $116 | $116 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for GEORGE C. HALL & SONS, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for GEORGE C. HALL & SONS, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for GEORGE C. HALL & SONS, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for GEORGE C. HALL & SONS, INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2012-01-24 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within ME, ordered by federal enforcement volume:
- THE LANE CONSTRUCTION CORP.CASWELL — 3 federal enforcement records
- THE LANE CONSTRUCTION CORP.BANGOR — 3 federal enforcement records
- LANE CONSTRUCTION CORPBANGOR — 3 federal enforcement records
- THE LANE CONSTRUCTION CORPBUCKSPORT — 3 federal enforcement records
- THE LANE CONSTRUCTION CORP.LINCOLN — 3 federal enforcement records
- SARGENT CORPORATIONCALAIS — 2 federal enforcement records
- MARRINERS, INC.BELFAST — 2 federal enforcement records
- CIANBRO CORPORATIONHERMON — 2 federal enforcement records
- THE LANE CONSTRUCTION CORPORATIONMORO PLANTATION — 2 federal enforcement records
- MAINE DEPARTMENT OF TRANSPORTATIONPOLAND — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in MEState-wide enforcement data
- Highway, Street, and in MEIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on GEORGE C. HALL & SONS, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is GEORGE C. HALL & SONS, INC.'s OSHA violation history?
- GEORGE C. HALL & SONS, INC. has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does GEORGE C. HALL & SONS, INC.'s safety record compare to its industry?
- GEORGE C. HALL & SONS, INC. operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.