Establishment profile
EASTERN CONCRETE MATERIALS, INC.
305 WEST FORT LEE ROAD, BOGOTA, NJ, 07603
327320 — Ready-Mix Concrete Manufacturing
Summary
EASTERN CONCRETE MATERIALS, INC. has accumulated 10 OSHA violations across 1 inspection over 16 years of recorded history, with $4,350 in total assessed penalties.
The establishment sits in the 69th percentile for violations within its industry-state peer group of 121 employers. The most recent enforcement activity was recorded 16 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
EASTERN CONCRETE MATERIALS, INC. appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 10 distinct standards shown · 10 citations in this view · $4,350 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0178 L01 II | 1 | 1 | $1,050 | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0023 A08 | 1 | 1 | $660 | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0023 A03 I | 1 | 1 | $660 | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0215 A04 | 1 | 1 | $660 | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0253 B04 III | 1 | 1 | $660 | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0303 B01 | 1 | 1 | $660 | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0215 B09 | 1 | 1 | — | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0145 C02 I | 1 | 1 | — | Nov 2009 | Nov 2009 |
| 29 CFR 1910.0144 A01 III | 1 | 1 | — | Nov 2009 | Nov 2009 |
| 29 CFR 1910.1200 F05 I | 1 | 1 | — | Nov 2009 | Nov 2009 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 3273 within NJ. Peer group: 121 employers. This establishment has 10 OSHA violations; peer median is 4.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for EASTERN CONCRETE MATERIALS, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for EASTERN CONCRETE MATERIALS, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 16+ years. Most recent activity: 16 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for EASTERN CONCRETE MATERIALS, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in NJ — for EASTERN CONCRETE MATERIALS, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other EASTERN CONCRETE MATERIALS, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 70S&S · 100 contractor · $152,674 proposed / $95,278 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9363748 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2017 | — | Yes | ModNegligence | $13,081 | $7,500 |
| 9363745 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2017 | — | Yes | ModNegligence | $13,081 | $7,500 |
| 9464824 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2019 | — | Yes | ModNegligence | $9,409 | $2,834 |
| 9464825 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2019 | — | Yes | ModNegligence | $8,468 | $2,551 |
| 8925191 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jun 2016 | — | No | HighNegligence | $5,475 | $5,475 |
| 6540657 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | HighNegligence | $4,689 | $988 |
| 6540652 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $4,689 | $1,412 |
| 6540646 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $4,689 | $3,244 |
| 6540645 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | No | HighNegligence | $4,689 | $947 |
| 6540644 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | No | HighNegligence | $4,689 | $947 |
| 8925182 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | May 2016 | — | Yes | ModNegligence | $3,996 | $2,797 |
| 6540675 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $3,996 | $243 |
| 6047763 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $3,405 | $3,405 |
| 8708864 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Dec 2012 | — | Yes | ModNegligence | $2,901 | $2,901 |
| 6061490 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Nov 2008 | — | No | HighNegligence | $2,901 | $585 |
| 6047756 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $1,944 | $1,944 |
| 9315269 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Feb 2017 | — | Yes | ModNegligence | $1,917 | $1,917 |
| 8916075 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2015 | — | Yes | HighNegligence | $1,530 | $1,530 |
| 6054586 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Apr 2008 | — | Yes | ModNegligence | $1,530 | $350 |
| 6001352 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Dec 2002 | — | Yes | HighNegligence | $1,428 | $1,428 |
| 8916078 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2015 | — | Yes | HighNegligence | $1,412 | $1,412 |
| 8708895 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | May 2013 | — | Yes | LowNegligence | $1,412 | $634 |
| 6540663 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $1,412 | $1,130 |
| 6540660 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | HighNegligence | $1,412 | $1,412 |
| 6540659 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $1,412 | $988 |
| 6540647 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | HighNegligence | $1,412 | $1,000 |
| 9496016 | Quinton Twp Pit Salem, NJ contractor: Eastern Concrete Materials Inc | Aug 2020 | — | Yes | LowNegligence | $1,404 | $631 |
| 8925185 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | May 2016 | — | Yes | ModNegligence | $1,337 | $1,337 |
| 8796388 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Apr 2012 | — | Yes | LowNegligence | $1,304 | $176 |
| 6540682 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | HighNegligence | $1,304 | $1,304 |
| 6540681 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | HighNegligence | $1,304 | $1,304 |
| 8925183 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | May 2016 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 8646134 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | May 2011 | — | No | ModNegligence | $1,203 | $243 |
| 6540674 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 6540664 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $1,203 | $842 |
| 9366222 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2017 | — | Yes | LowNegligence | $1,096 | $768 |
| 9663690 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Apr 2022 | — | Yes | ModNegligence | $1,069 | $1,069 |
| 9363500 | Cedar Bridge Sand Operation Ocean, NJ contractor: Eastern Concrete Materials Inc | Dec 2017 | — | Yes | ModNegligence | $1,031 | $1,031 |
| 8649288 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2011 | — | No | ModNegligence | $946 | $190 |
| 6540650 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | No | HighNegligence | $946 | $757 |
| 8705151 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Jul 2012 | — | Yes | ModNegligence | $873 | $873 |
| 6047762 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $873 | $873 |
| 6047760 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $873 | $873 |
| 6047758 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $873 | $873 |
| 9315271 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Feb 2017 | — | Yes | ModNegligence | $862 | $862 |
| 6540670 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | No | HighNegligence | $807 | $194 |
| 9363744 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2017 | — | No | ModNegligence | $795 | $450 |
| 6539830 | Cedar Bridge Sand Operation Ocean, NJ contractor: Eastern Concrete Materials Inc | Sep 2009 | — | Yes | ModNegligence | $745 | $745 |
| 8581830 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Nov 2010 | — | Yes | ModNegligence | $585 | $585 |
| 8581829 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Nov 2010 | — | Yes | ModNegligence | $585 | $585 |
| 8581828 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Nov 2010 | — | Yes | ModNegligence | $585 | $585 |
| 8581824 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Nov 2010 | — | Yes | ModNegligence | $585 | $585 |
| 6061491 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Nov 2008 | — | No | ModNegligence | $585 | $176 |
| 6047761 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $585 | $585 |
| 6047759 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | ModNegligence | $585 | $585 |
| 6047757 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2007 | — | No | HighNegligence | $585 | $585 |
| 9310466 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Jul 2016 | — | Yes | ModNegligence | $568 | $568 |
| 9466000 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2020 | — | Yes | ModNegligence | $567 | $567 |
| 6540672 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | No | ModNegligence | $540 | $109 |
| 9463703 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Jun 2019 | — | Yes | ModNegligence | $514 | $514 |
| 8928308 | Cedar Bridge Sand Operation Ocean, NJ contractor: Eastern Concrete Materials Inc | Mar 2016 | — | Yes | ModNegligence | $499 | $499 |
| 8711405 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2012 | — | Yes | ModNegligence | $499 | $499 |
| 9366223 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2017 | — | No | LowNegligence | $492 | $345 |
| 9363749 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2017 | — | No | ModNegligence | $492 | $300 |
| 9360772 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2017 | — | Yes | ModNegligence | $492 | $492 |
| 8808518 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Feb 2015 | — | Yes | ModNegligence | $460 | $460 |
| 8651139 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Aug 2011 | — | Yes | ModNegligence | $460 | $460 |
| 8569705 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $460 | $460 |
| 8569704 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $460 | $460 |
| 9465917 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2019 | — | Yes | ModNegligence | $440 | $440 |
| 8917191 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2015 | — | Yes | ModNegligence | $425 | $425 |
| 8917190 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2015 | — | Yes | ModNegligence | $425 | $425 |
| 8711476 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Mar 2013 | — | Yes | LowNegligence | $425 | $425 |
| 9417052 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Feb 2019 | — | No | HighNegligence | $405 | $405 |
| 8928306 | Cedar Bridge Sand Operation Ocean, NJ contractor: Eastern Concrete Materials Inc | Mar 2016 | — | Yes | ModNegligence | $392 | $392 |
| 8571788 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Mar 2010 | — | No | ModNegligence | $392 | $100 |
| 6536290 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Aug 2009 | — | Yes | ModNegligence | $392 | $117 |
| 6536289 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Aug 2009 | — | No | ModNegligence | $392 | $100 |
| 9315270 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Feb 2017 | — | No | ModNegligence | $387 | $387 |
| 6032715 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Apr 2006 | — | Yes | HighNegligence | $375 | $375 |
| 8658339 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Mar 2012 | — | Yes | ModNegligence | $362 | $362 |
| 8658338 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Mar 2012 | — | Yes | HighNegligence | $362 | $362 |
| 8658337 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Mar 2012 | — | Yes | ModNegligence | $362 | $362 |
| 8569096 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Jul 2010 | — | Yes | ModNegligence | $362 | $362 |
| 6540677 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $362 | $362 |
| 6540673 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $362 | $362 |
| 6540671 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $362 | $362 |
| 6540665 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $362 | $362 |
| 9711581 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Dec 2022 | — | No | ModNegligence | $346 | $346 |
| 9711580 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Dec 2022 | — | No | ModNegligence | $346 | $346 |
| 9463702 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Jun 2019 | — | Yes | ModNegligence | $344 | $344 |
| 8651140 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Sep 2011 | — | Yes | ModNegligence | $334 | $334 |
| 8583327 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Dec 2010 | — | Yes | ModNegligence | $334 | $334 |
| 6539831 | Cedar Bridge Sand Operation Ocean, NJ contractor: Eastern Concrete Materials Inc | Sep 2009 | — | No | ModNegligence | $334 | $334 |
| 6047006 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Jan 2007 | — | Yes | ModNegligence | $324 | $324 |
| 9663691 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Apr 2022 | — | Yes | ModNegligence | $321 | $321 |
| 6001375 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Jan 2003 | — | Yes | LowNegligence | $317 | $317 |
| 9369902 | Cedar Bridge Sand Operation Ocean, NJ contractor: Eastern Concrete Materials Inc | Dec 2017 | — | No | ModNegligence | $311 | $311 |
| 8569703 | Hamburg Quarry Sussex, NJ contractor: Eastern Concrete Materials, Inc. | Oct 2009 | — | Yes | ModNegligence | $308 | $308 |
| 9465918 | Glen Gardner Quarry Hunterdon, NJ contractor: Eastern Concrete Materials Inc | Oct 2019 | — | No | ModNegligence | $293 | $293 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in NJ — for EASTERN CONCRETE MATERIALS, INC., not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other EASTERN CONCRETE MATERIALS, INC. locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 3 cases · 2 ULP · 1 representation
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 22-CA-247335 | Unfair labor practice | Aug 2019 | Nov 2019 | Closed | Region 22, Newark, New Jersey |
| 04-RC-218518 | Representation election | Apr 2018 | Apr 2018 | Closed | Region 04, Philadelphia, Pennsylvania |
| 22-CA-125385 | Unfair labor practice | Mar 2014 | Apr 2014 | Closed | Region 22, Newark, New Jersey |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for EASTERN CONCRETE MATERIALS, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for EASTERN CONCRETE MATERIALS, INC.. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
EASTERN CONCRETE MATERIALS 305 WEST FORT LEE ROAD · BOGOTA, NJ, 07603 | — | — | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
In the news
Related searches
- Ready-Mix Concrete ManufacturingAll employers in this industry
- Employers in NJState-wide enforcement data
- Ready-Mix Concrete Manufacturing in NJIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on EASTERN CONCRETE MATERIALS, INC. from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is EASTERN CONCRETE MATERIALS, INC.'s OSHA violation history?
- EASTERN CONCRETE MATERIALS, INC. has 1 OSHA inspection on record with 10 violations and $4,350 in total penalties.
- How does EASTERN CONCRETE MATERIALS, INC.'s safety record compare to its industry?
- EASTERN CONCRETE MATERIALS, INC. operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.