Establishment profile
DESIGN AND PRODUCTION INCORPORATED
7110 RAINWATER PLACE, LORTON, VA, 22079
Operated by Design & Production, Inc · 1 of 2 establishments
339999 — All Other Miscellaneous Manufacturing
EIN 540492707
Summary
DESIGN AND PRODUCTION INCORPORATED has accumulated 56 OSHA violations across 4 inspections over 13 years of recorded history, with $40,490 in total assessed penalties.
The establishment sits in the 100th percentile for violations within its industry-state peer group of 413 employers. Inspection frequency runs at the 93rd percentile. The most recent enforcement activity was recorded 4 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
DESIGN AND PRODUCTION INCORPORATED appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 4 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 26 citations in this view · $40,000 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0303 B02 | 2 | 2 | $4,110 | Jun 2016 | Feb 2022 |
| 29 CFR 1910.1200 F06 II | 2 | 2 | $4,110 | Jun 2016 | Feb 2022 |
| 29 CFR 1910.0134 E01 | 2 | 2 | $1,575 | Jan 2013 | Jun 2016 |
| 29 CFR 1910.0107 B09 | 2 | 2 | $490 | Jan 2013 | Feb 2022 |
| 29 CFR 1910.0305 G02 III | 2 | 2 | — | Jun 2016 | Feb 2022 |
| 29 CFR 1910.1200 H01 | 2 | 2 | — | Jun 2016 | Feb 2022 |
| 29 CFR 1910.0243 A01 I | 1 | 1 | $3,460 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0107 C06 | 1 | 1 | $3,460 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0028 B12 I | 1 | 1 | $3,460 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0147 C01 | 1 | 1 | $2,595 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0022 A01 | 1 | 1 | $2,450 | Jun 2016 | Jun 2016 |
| 29 CFR 1910.0179 J03 | 1 | 1 | $2,380 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0242 B | 1 | 1 | $2,380 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0212 B | 1 | 1 | $2,055 | Feb 2022 | Feb 2022 |
| 29 CFR 1910.0101 B | 1 | 1 | $1,675 | Jun 2016 | Jun 2016 |
| 29 CFR 1910.0305 G01 IV | 1 | 1 | $1,200 | Jun 2016 | Jun 2016 |
| 29 CFR 1910.0303 G01 I A | 1 | 1 | $1,200 | Jun 2016 | Jun 2016 |
| 29 CFR 1910.0219 F03 | 1 | 1 | $1,200 | Jun 2016 | Jun 2016 |
| 29 CFR 1910.0106 E02 II | 1 | 1 | $1,200 | Jun 2016 | Jun 2016 |
| 29 CFR 1910.0037 B06 | 1 | 1 | $1,000 | Jun 2016 | Jun 2016 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer in NAICS 3399 within VA. Peer group: 413 employers. This establishment has 56 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 76 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for DESIGN AND PRODUCTION INCORPORATED. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 4+ years. Most recent activity: 4 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for DESIGN AND PRODUCTION INCORPORATED. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for DESIGN AND PRODUCTION INCORPORATED. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for DESIGN AND PRODUCTION INCORPORATED. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for DESIGN AND PRODUCTION INCORPORATED. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for DESIGN AND PRODUCTION INCORPORATED. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
DESIGN & PRODUCTION INC 7110 RAINWATER PL · LORTON, VA, 22079 | RCRA | No Violation Identified | 0 | 0 | — | Apr 2015 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for DESIGN AND PRODUCTION INCORPORATED. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseIGF::OT::IGF TASK ORDER FOR FABRICATION AND INSTALLATION OF EXHIBITS FOR THE NATIONAL MUSEUM OF THE ARMY.contract · Last action 2021-05-06$45,182,265
- Department of Homeland SecurityCOMPLETE SET UP OF MUSEUM EXHIBITS.contract · Last action 2025-09-23$19,829,723
- National Archives and Records AdministrationEXHIBIT FABRICATION CONSULTING FOR BUILDABILITY (PRE-FABRICATION SERVICES) FOR SIGNATURE GALLERY AND LEARNING CENTERcontract · Last action 2025-09-22$13,166,865
- Department of DefenseEXHIBIT FABRICATION AND INSTALLATIONcontract · Last action 2016-07-07$12,808,838
- Smithsonian InstitutionNATIONAL AIR AND SPACE MUSEUM (NASM) TO PROVIDE EXHIBIT DESIGN COMPLETION, FABRICATION, AND INSTALLATION SERVICES FOR SIX STATE-OF-THE-ART EXHIBITIONS AND COMMON AREAScontract · Last action 2025-08-20$9,921,123
- Smithsonian InstitutionFABRICATION&INSTALLATION OF THE INAUGURAL EXHIBITS OF NMMAHC IGF::OT::IGFcontract · Last action 2017-09-11$7,070,801
- Department of Homeland SecurityTASK TO COMPLETE NEXT PHASE OF THE USCG NATIONAL MUSEUM.contract · Last action 2024-09-30$5,661,168
- Department of Homeland SecurityTASK ORDER AWARD FOR PROGRAM MANAGEMENT, DESIGN, AND CONSERVATION SERVICES UNDER IDIQ 70Z02322D09230001contract · Last action 2025-09-04$3,688,913
- Department of DefenseEXHIBIT FABRICATION-LONG LEAD PRODUCTIONcontract · Last action 2024-11-18$2,785,402
- Smithsonian InstitutionDESIGN/BUILD CONTRACT FOR THE OCEAN HALL EXHIBITION, NATURAL MUSEUM OF NATURAL HISTORY, PHASE 1 - FAMILIARIZATION/SCHEMATIC DESIGNcontract · Last action 2013-10-22$1,961,860
- Smithsonian InstitutionEXHIBIT DESIGN AND FABRICATION SERVICES FOR THE HUMAN GENOME PROJECTcontract · Last action 2014-12-09$1,749,717
- Department of DefenseAUDIO VISUAL MEDIA SOFTWAREcontract · Last action 2024-09-17$1,496,057
- Department of DefenseEXHIBIT DESIGNcontract · Last action 2025-05-21$1,476,746
- Smithsonian InstitutionSERVICE AND MAINTENANCE OF MULTI MEDIA LIGHTING ELEMENTScontract · Last action 2010-07-29$1,107,625
- Department of Homeland SecurityTASK ORDER #2 DESIGN STEM/QUAL PROGRAMcontract · Last action 2024-02-02$1,079,160
- Smithsonian InstitutionIGF::OT::IGF DEEP TIME EXHIBIT FABRICATIONcontract · Last action 2022-04-22$657,088
- Department of DefenseNATIONAL MUSEUM OF THE UNITED STATES ARMY (NMUSA) REVOLUTIONARY WAR EXHIBIT SERVICEScontract · Last action 2025-04-09$549,998
- National Archives and Records AdministrationEXHIBIT PREVENTATIVE MAINTENANCE AND REPAIR SERVICES FOR THREE EXHIBITS IN THE NATIONAL ARCHIVES MUSEUM LOCATED AT ARCHIVES I (WASHINGTON, D.C.): THE PUBLIC VAULTS, RECORDS OF THE RIGHTS, AND ORIENTATION PLAZA. IGF::OT::IGFcontract · Last action 2025-06-04$372,882
- Department of DefenseMUSEUM EXHIBIT DESIGN, FABRICATION, AND INSTALLATION SERVICES IN SUPPORT OF A NEW EXHIBIT COMMEMORATING THE 25TH ANNIVERSARY OF 9/11 FOR THE NMUSA.contract · Last action 2025-09-19$345,000
- Department of DefenseDESIGN, FABRICATION, AND INSTALLATION SERVICES TO UPDATE EXHIBIT PANELS, LABELS, AND GRAPHICS LOCATED AT THE NATIONAL MUSEUM OF THE UNITED STATES ARMY'S (NMUSA) AS DEFINED IN THE PERFORMANCE WORK STATEMENT (PWS).contract · Last action 2025-09-24$315,000
- National Archives and Records AdministrationTHIS CONTRACT IS FOR PREVENTATIVE MAINTENANCE OF EXHIBIT STRUCTURES AND EXHIBIT TECHNICAL SYSTEMS AT THE NATIONAL ARCHIVES MUSEUM WITH A PERIOD OF PERFORMANCE OF SEPTEMBER 29, 2022 THROUGH SEPTEMBER 28, 2023 PLUS FOUR (4) OPTION YEARS.contract · Last action 2025-08-25$297,061
- Smithsonian InstitutionPHASE 1 OF WEST COURT EXHIBIT MOVE- ARTIFACT AND TOTEM MOVE.contract · Last action 2018-04-13$241,133
- Department of DefensePAGING SYSTEM UPGRADEcontract · Last action 2021-11-10$189,742
- Smithsonian InstitutionIGF::OT::IGF EXHIBITION DESIGN AND FABRICATION SERVICES REQUIRED BY THE SMITHSONIAN INSTITUTION ("SI").contract · Last action 2014-09-29$185,000
- Department of DefenseFULL RESTORATION AND/OR REPLACEMENT OF ALL 17 STAINLESS STEEL PYLONS LOCATED AT THE MUSEUMS MAIN ENTRANCE AND THE MEDAL OF HONOR TERRACE.contract · Last action 2025-09-17$165,000
- Department of Homeland SecurityMERLETTI BUILDING DISPLAY CASE. TO OFF SMITHSONIAN IDIQ.contract · Last action 2024-09-23$136,009
- Smithsonian InstitutionLIGHTING CONTROLcontract · Last action 2023-08-25$125,759
- Smithsonian InstitutionTHIS WORK ORDER NUMBER 13 AGAINST IDIQ CONTRACT NO. F0336CC10018 IS FOR SERVICES REQUIRED BY SMITHSONIAN INSTITUTION NATIONAL MUSEUM OF NATURAL HISTORY. THIS WORK ORDER HAS BEEN ASSIGNED A UNIQUE CONTRACT NUMBER, F10CW10078 FOR ALL CORRESPONDENCE AND INVOICING PURPOSES. ALL OF THE TERMS AND CONDITIONS OF F0336CC10018 SHALL APPLY TO THIS WORK ORDER CONTRACT. I. SCOPE OF WORK A. CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, EQUIPMENT AND MATERIALS (COLLECTIVELY "SERVICES") FOR THE UPGRADE OF THE KENNETH E. BEHRING FAMILY HALL OF MAMMALS (MAMMAL HALL) AUDIO VISUAL SYSTEM, AS DESCRIBED IN THE ATTACHED SMITHSONIAN INSTITUTION'S SCOPE OF WORK DATED JULY 15, 2009 AND THE CONTRACTOR'S PROPOSAL DATED AUGUST 12, 2009. NOTE: THIS SHORT DESCRIPTION SHALL NOT IN ANY WAY BE CONSTRUED AS A LIMITATION ON THE CONTRACTOR'S OBLIGATION TO COMPLY WITH THE WITH THE CONTRACT SPECIFICATIONS. II. PRICE/COST A. CONTRACTOR SHALL BE PAID A FIRM, FIXED PRICE OF EIGHTY-SIX THOUSAND DOLLARS ($86,000.00) FOR ALL SERVICES REQUIRED IN PARAGRAPH I ABOVE. III. PERIOD OF PERFORMANCE A. ALL WORK SHALL BEGIN WITHIN FORTY-FIVE (45) DAYS AFTER RECEIPT OF THE NOTICE TO PROCEED AND SHALL BE COMPLETED WITHIN TEN (10) DAYS AFTER THE START OF THE WORK. THE SIGNED EXECUTION OF THIS WORK ORDER CONTRACT BY THE CONTRACTING OFFICER SHALL SERVE AS THE NOTICE TO PROCEED. ALL WORK SHALL BE COMPLETED BY MARCH 5, 2010. B. WORK FOR THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE SMITHSONIAN INSTITUTION'S SCOPE OF WORK DATED JULY 15, 2009.contract · Last action 2010-01-19$86,000
- Smithsonian InstitutionCREATIVE AND TECHNICAL DESIGN AND EQUIPMENT FOR AGE OLD CITIES EXHIBITION.contract · Last action 2023-12-19$84,524
- Department of DefenseTASK ORDER 0002 FOR CONSERVATION/RESTORATION OF MACRO ARIFACTS AND FABRICATION OF UNIFORMS FOR THE NMUSA.contract · Last action 2015-08-28$55,246
- Smithsonian InstitutionAUDIO-VISUAL INSTALLATION SERVICES, FOR A SPLENDID LAND: PAINTINGS FROM ROYAL UDAIPUR AT NMAAcontract · Last action 2024-06-01$52,583
- Smithsonian InstitutionREPAIR OF THE SQUID TANK IN THE OCEAN HALLcontract · Last action 2012-09-12$50,000
- National Archives and Records AdministrationUPGRADE DVD PLAYERS TO ALCORN MCBRIDE VIDEO BINLOOP MPEG2 PLAYER.contract · Last action 2011-09-07$48,900
- Smithsonian InstitutionSERVICE, QUARTERLY MAINTENANCE FOR AV SYSTEMS.contract · Last action 2024-02-01$45,167
- Smithsonian InstitutionECR REPROGRAMMING AND MAINTENANCEcontract · Last action 2010-12-03$42,421
- Smithsonian InstitutionLELAWI THEATER AND DIKER PAVILION AV SYSTEM RENOVATION FOR NMAI.contract · Last action 2024-05-22$39,800
- Smithsonian InstitutionPROVIDE MECHO SHADES (MOTORIZED WINDOW)contract · Last action 2019-08-13$37,811
- Smithsonian InstitutionUPGRADE MASTER CONTROL TO AMX FOR SCHEDULING, REMOTE ACCESScontract · Last action 2012-09-24$25,000
- Smithsonian InstitutionAV EQUIPMENT AND SUPPLIEScontract · Last action 2008-12-18$24,151
- Smithsonian InstitutionMOUNT MAKER AND INSTALLERS FOR EXHIBITION AND ARTIFACT INSTALLATIONcontract · Last action 2012-03-16$13,025
- Smithsonian InstitutionUPGRADE OF THE A/V CENTRAL SCHEDULING AND CONTROL SYSTEM.contract · Last action 2009-09-24$11,862
- Smithsonian InstitutionIGF::OT::IGF PROJECTORcontract · Last action 2014-08-19$9,995
- Department of the InteriorFONE 05893contract · Last action 2009-05-06$9,279
- Smithsonian InstitutionSERVICE, TO REMOVE INTERIOR BASE PANELS IN 4 MEYCVAERT CASES AND REMOVE CARPET FROM UNDER THE CASES. REMOVE AND REPLACE THREE PIECE GRAPHIC PANEL.contract · Last action 2008-01-16$6,500
- Smithsonian InstitutionCURLY MAPLE A1 VENEER FOR THE ECR MONITOR ENCLOSUREScontract · Last action 2019-09-05$5,042
- Smithsonian InstitutionIGF::OT::IGF REQUIRED SERVICES ARE NOT PROVIDED BY AGENCY EMPLOYEES.contract · Last action 2013-08-13$5,000
- Department of the InteriorTROUBLE-SHOOT AND REPAIR THE AUDIO/VISUAL CONTROL SYSTEM AT THE FORT NECESSITY NATIONAL BATTLEFIELD VISITOR CENTER.contract · Last action 2008-02-15$4,500
- Department of Defense20"(W) X 28"(H) DISPLAY PANELcontract · Last action 2009-07-29$4,200
- Department of the InteriorDIAGNOSE PROBLEMS OCCURRING IN VISITOR CENTER EXHIBITScontract · Last action 2010-08-11$3,624
- Smithsonian InstitutionMOUNT MAKING AND INSTALLATION FOR EXHIBITcontract · Last action 2012-03-13$3,500
Federal contract dollars to this establishment. Primary NAICS: 339999 - ALL OTHER MISCELLANEOUS MANUFACTURING. Last action: 2025-12-02. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2021-10-19 | Planned | 18 | 18 | $20,440 | |
| 2021-10-19 | Planned | 10 | 5 | $7,570 | |
| 2016-02-08 | Complaint | 21 | 12 | $11,500 | |
| 2012-12-12 | Planned | 7 | 4 | $980 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
DESIGN AND PRODUCTION INCORPORATED is one of 2 establishments rolled up under the parent organization Design & Production, Inc.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Design & Production, Inc across all 2 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in all other miscellaneous manufacturing within VA, ordered by federal enforcement volume:
- GOLDEN ART SUPPLIES INC.DUMFRIES — 1 federal enforcement record
- QMT ASSOCIATES, INC.MANASSAS PARK — 1 federal enforcement record
- GOLDEN ART SUPPLIES, INC.WOODBRIDGE — 1 federal enforcement record
- BREG OIL SPONGE INTERNATIONAL, INC.FREDERICKSBURG — 1 federal enforcement record
- VIRGINIA PROSTHETICS, INC.ROANOKE — 1 federal enforcement record
- HARNETT MANUFACTURING LLCCHESTERFIELD — 1 federal enforcement record
- SHENANDOAH FRAMING, INC.LEXINGTON — 1 federal enforcement record
- INDUSTRIAL FABRICATORS INCROANOKE — 1 federal enforcement record
- VACUUM RESEARCH CORPORATIONNEWPORT NEWS — 1 federal enforcement record
- HANGER CLINICRICHMOND — 1 federal enforcement record
Other locations under this parent
Other establishments operated by Design & Production, Inc, ordered by federal enforcement volume:
- DESIGN & PRODUCTION INCAlexandria, VA — 1 federal enforcement record
Related searches
- All Design & Production, Inc locationsParent rollup
- All Other Miscellaneous ManufacturingAll employers in this industry
- Employers in VAState-wide enforcement data
- All Other Miscellaneous in VAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on DESIGN AND PRODUCTION INCORPORATED from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Design & Production, Inc, which operates 2 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is DESIGN AND PRODUCTION INCORPORATED's OSHA violation history?
- DESIGN AND PRODUCTION INCORPORATED has 4 OSHA inspections on record with 56 violations and $40,490 in total penalties.
- How does DESIGN AND PRODUCTION INCORPORATED's safety record compare to its industry?
- DESIGN AND PRODUCTION INCORPORATED operates in the all other miscellaneous manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.4. DESIGN AND PRODUCTION INCORPORATED's self-reported DART rate is 0 compared to an industry average of 1.5.