Skip to main content

Establishment profile

Cutting Edge Group LLC

14 Walkup Cutoff Road, Lake George, NY, 12845
Operated by Bausch & Lomb Corp · 1 of 271 establishments
237110Water and Sewer Line and Related Structures Construction

Download as PDF →

OSHA inspections
0
over 12 years
Violations
0
Penalties
$0
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

Cutting Edge Group LLC has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 6 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

Cutting Edge Group LLC appears in WHD wage enforcement and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for Cutting Edge Group LLC. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for Cutting Edge Group LLC. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
1.9
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Cutting Edge Group LLC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
6 years ago

No federal enforcement activity has been recorded against this establishment in 6+ years. Most recent activity: 6 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
2
Back wages owed
$3,481
Employees affected
9

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour breakdown by law

Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 2 statutes · 18 violations · $3,481 in backwages

StatutePeriodCasesViolationsWorkersBackwagesCivil penalty
FLSA — minimum wage & overtimeNov 2013152$1,911
Davis-Bacon (federal construction)Nov 20131139$1,570

Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; final payment may differ. 2 cases · $3,481 in backwages · 9 workers affected

Case periodIndustryBackwagesWorkers
May 2019 – Aug 2019Water and Sewer Line and Related Structures Construction0
May 2013 – Nov 2013Commercial and Institutional Building Construction$3,4819

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public.

Mine safety (MSHA)

No MSHA mine safety violations on file for Cutting Edge Group LLC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for Cutting Edge Group LLC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC)

No H-1B, H-2A, or H-2B labor condition applications on file for Cutting Edge Group LLC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for Cutting Edge Group LLC. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
1408467
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Cutting Edge Group LLC. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$6.3M
Obligated (all-time)
$62.3M
Awards
118
Top agency
Department of Defense
$31.2M
Top agencies by obligation (this location)
Department of Defense$31.2M
Department of the Interior$28.0M
General Services Administration$2.1M
Department of Agriculture$998K
Largest awards (top 50 of 118)
  • Department of Defense
    ALTERNATE CARE FACILITY (ACF): EAST ORANGE HOSPITAL - EAST ORANGE, NJ
    contract · Last action 2020-05-29
    $11,078,257
  • Department of the Interior
    IGF::OT::IGF G:NOGRN NAMA 151059A - REHABILITATE WATER SYSTEMS FOR EMERGENCY AND POTABLE WATER SUPPLY IN POTOMAC PARK
    contract · Last action 2018-02-06
    $3,682,958
  • Department of the Interior
    CONSTRUCT DELAWARE WATER GAP SWIM BEACH
    contract · Last action 2010-01-05
    $3,670,731
  • Department of the Interior
    VARIOUS ITEMS, P 71, FAR 5223-2 THE WORK OF THIS CONTRACT IS FOR PAVEMENT MANAGEMENT OF THE ROADS AND STORM WATER MANAGEMENT WITHIN THE DELAWARE WATER GAP NATIONAL RECREATION AREA. AMENDMENT #2 - CONTRACTOR QUESTIONS AND NPS RESPONSES - MARCH
    contract · Last action 2020-05-05
    $3,412,552
  • Department of Defense
    TAS::21 2022::TAS ARRA::YES::ARRA RECOVERY PROJECT#325269 UPGRADE AND REPAIR TO PICATINNY LAKE DAM AND DEMARK LAKE DAM AT PICATINNY ARSENAL, NEW JERSEY.
    contract · Last action 2012-09-13
    $3,012,447
  • Department of the Interior
    REHABILITATE OF CHILDS PARK TO INCLUDE REFORRESTATION, PEDESTRIAN BRIDGES AND WALKWAYS, COMFORT STATION AND PARKING LOT
    contract · Last action 2013-01-04
    $2,978,791
  • Department of Defense
    REPAIR SEAWALL
    contract · Last action 2010-12-15
    $2,198,287
  • Department of the Interior
    VAMA REPLACE WATER SUPPLY SYSTEM
    contract · Last action 2026-02-14
    $1,722,194
  • Department of Defense
    BUILD OUT
    contract · Last action 2022-02-24
    $1,714,440
  • Department of Defense
    BID OPTION 1-PARKING LOT EXPANSION
    contract · Last action 2010-05-19
    $1,611,418
  • General Services Administration
    CONSTRUCTION SITE PREPARATION FOR INSTALLATION OF A GANTRY SYSTEM AT THE CHAMPLAIN, NEW YORK LPOE.
    contract · Last action 2013-01-02
    $1,550,489
  • Department of the Interior
    RECOVERY STLI 106096 "INSTALL POWER AND COMMUNICATION LINES" THE SELECTED FIRM WILL PROVIDE POWER AND COMMUNICATIONS INFRASTRUCTURE IMPROVEMENTS ON LIBERTY AND ELLIS ISLANDS. THE PROJECT WILL CONSIST OF INSTALLATION OF ELECTRICAL AND COMMUNICATION CONDUITS, WIRE AND FIBER OPTICS AROUND BOTH ISLANDS AS WELL AS PROVIDE A BACK-UP POWER SUPPLY (UPS) IN THE ELECTRICAL DISTRIBUTION SYSTEM TO ALLOW THE SYSTEM TO REMAIN OPERATIONAL DURING POWER OUTAGES AND FLUCTUATIONS. THESE LINES WILL BE INSTALLED IN AND AROUND HISTORIC AND CULTURALLY SENSITIVE STRUCTURES AS WELL AS IN HIGHLY VISIBLE AND PUBLIC USE AREAS. THIS PROJECT IS TO BE DONE IN PHASES SO AS TO MINIMIZE INTERFERENCE WITH THE VISITOR'S EXPERIENCE, AND REQUIRES COORDINATION WITH THE PARK PERSONNEL AS WELL AS OTHER CONTRACTORS AND PROJECTS WHICH WILL BE UNDERWAY AT THE SAME TIME.
    contract · Last action 2010-10-29
    $1,430,021
  • Department of Defense
    D/B FOR DOORS & WINDOWS REPLMNT, DFAS, ROME, NY
    contract · Last action 2012-01-05
    $1,264,224
  • Department of Defense
    HURRICANE IRENE FEMA MISSION
    contract · Last action 2012-05-14
    $1,159,450
  • Department of the Interior
    STLI PMIS #125783 "REPLACE ROOFTOP HVAC EQUIPMENT AT CONCESSION BUILDING ON LIBERTY ISLAND," STATUE OF LIBERTY NATIONAL MONUMENT, NEW YORK, NEW YORK. THE WORK CONTAINED IN THIS CONTRACT WILL ENTAIL THE FOLLOWING: REMOVAL OF ALL EXISTING HVAC EQUIPMENT LOCATED ON THE ROOF OF THE CONCESSION FACILITY. FACILITATION OF REPLACEMENT / REPAIRS TO THE ROOF UNDER THE HVAC EQUIPMENT, BOTH ON THE OUTSIDE AND INSIDE OF THE BUILDING. PERFORMING A BUILDING ASSESSMENT TO DETERMINE PROPER SIZING OF NEW HVAC EQUIPMENT. PERFORMING AN ASSESSMENT OF THE EXISTING DUCT SYSTEM TO DETERMINE NEEDED REPAIRS / EXPANSION. DESIGNING A NEW HVAC SYSTEM FOR THE CONCESSION FACILITY. INSTALLING THE NEW HVAC SYSTEM WITHIN THE EXISTING APPROXIMATELY 1,600 SQ-FT AREA ON THE ROOF. FACILITATION OF REPAIRS / MODIFICATIONS TO THE INTERIOR DUCT SYSTEM TO ACCOMMODATE THE NEW SYSTEM.
    contract · Last action 2012-08-17
    $1,104,944
  • Department of Defense
    ALL WORK ASSOCIATED WITH THE CONTRACT
    contract · Last action 2012-05-10
    $1,098,440
  • Department of the Interior
    REPLACEMENT OF FT. TILDEN WATER DISTRIBUTION SYSTEM
    contract · Last action 2010-05-24
    $1,025,290
  • Department of Defense
    ALL COSTS IN CONNECTION WITH ALL REPAIRS
    contract · Last action 2013-09-10
    $961,169
  • Department of Agriculture
    GMNF/ ROCHESTER DISTRICT/ 0920 / TEXAS FALLS ACCESSIBILITY IMPROVEMENTS
    contract · Last action 2025-03-12
    $913,651
  • Department of the Interior
    GATE 11310 - PHASE 2B OF THE SANDY HOOK MULTI USE PATHWAY.DESIGN BUILD
    contract · Last action 2010-06-16
    $880,620
  • Department of the Interior
    RECOVERY -VAFO-152410C REHABILITATE VEGETATED BASINS
    contract · Last action 2011-05-31
    $828,094
  • Department of Defense
    TAS::21 2022::TAS PROJECTNUMBER#325240 MDIFICATION TO SPILLWAY, LAKE FREDERICK DAM, WEST POINT, NEW YORK.
    contract · Last action 2010-06-17
    $807,500
  • Department of Defense
    FSC: Z1EC INSTALL FIRE PROTECTION SYSTEM BUILDINGS 38 AND 114, WATERVLIET ARSENAL
    contract · Last action 2012-06-20
    $784,482
  • Department of the Interior
    PIPELINE REPLACEMENT
    contract · Last action 2024-01-30
    $715,682
  • Department of the Interior
    SARATOGA NATIONAL HISTORICAL PARK REPAVE SOUTH GATE PARKING LOT
    contract · Last action 2024-07-29
    $701,000
  • Department of the Interior
    IGF::OT::IGF GATEWAY NATIONAL RECREATION AREA SANDY HOOK STORM DAMAGE REPAIRS - VARIOUS LOCATIONS OF THE MULTI-USE PATHWAY (GATE-195080/197249) DESIGN-BUILD SANDY HOOK UNIT, MONMOUTH COUNTY, NEW JERSEY
    contract · Last action 2013-11-15
    $695,153
  • Department of the Interior
    GATEWAY NATIONAL RECREATION AREA, DESIGN-BUILD REHABILITATE RIIS BOARDWALK, REPAIR THE SHIP'S RAIL ALONG THE BOARDWALK AND REPAIR THE WALKWAYS AS PART OF THE BACK MALL NEAR THE GOLF COURSE.
    contract · Last action 2012-11-07
    $680,247
  • Department of Defense
    ALL WORK FOR THE EMERGENCY WALL REPAIR
    contract · Last action 2010-07-21
    $569,368
  • Department of the Interior
    DESIGN-BUILD OF MULTI-USE PATHWAY
    contract · Last action 2009-05-21
    $522,278
  • General Services Administration
    REIMBURSABLE RECOVERY ACT - CONSTRUCTION MANAGEMENT SERVICES FOR CBP LAND PORT OF ENTRY (LOPE) CONSTRUCTION PROJECT NEAR CHURUBUSCO, NEW YORK NORTHERN BORDER.
    contract · Last action 2013-01-15
    $482,562
  • Department of the Interior
    REHABILITATION OF TOWPATH TRAIL, UPPER DELAWARE SCENIC AND RECREATIONAL RIVER, SULLIVAN COUNTY, NEW YORK, UPDE - 029927
    contract · Last action 2009-08-06
    $459,939
  • Department of Defense
    DESIGN AND CONSTRUCTION OF A SPLASH PARK, INCLUDING CONCRETE, PIPING, PUMP SYSTEM, AND FEATURES AT FT. RILEY, KANSAS.
    contract · Last action 2012-06-29
    $453,517
  • Department of the Interior
    HOFR WATER METER PIT CONTROL ASSEMBLY
    contract · Last action 2024-08-15
    $435,000
  • Department of the Interior
    ASBESTOS ABATEMENT AND DEMOLITION OF BUILDING 85 AT FLOYD BENNETT FIELD, GATEWAY NATIONAL RECREATION AREA, GATE-023605
    contract · Last action 2010-07-16
    $378,528
  • Department of Defense
    WORK IN ACCORDANCE WITH BASE CLIN 0005 DESCRIPTION.
    contract · Last action 2012-07-19
    $370,927
  • Department of the Interior
    THE SCOPE OF THIS WORK INVOLVES THE DESIGN AND CONSTRUCTION OF VARIOUS COMPONENTS RELATED TO THE RESTORATION OF THE RYAN VISITOR CENTER. THIS PROJECT WILL RESTORE NEW AND HISTORIC FINISHES AND CREATE EDUCATIONAL AND VISITOR SERVICE FACILITIES. SPECIFICALLY FOR THIS CONTRACT, THE WORK WILL INCLUDE CARPENTRY MILLWORK, ELECTRICAL WIRING, FIXTURES, AND VARIOUS TYPES OF GRAPHIC PANELS AND SIGNAGE.
    contract · Last action 2011-10-26
    $359,951
  • Department of Defense
    CACTF II REPAIRS
    contract · Last action 2009-06-17
    $352,586
  • Department of Defense
    TROOP STORE RELOCATION, BLDG. 1861D, FORT RILEY, KANSAS
    contract · Last action 2011-12-30
    $343,333
  • Department of Defense
    RENOVATE MEN'S & WOMEN'S LOCKER RMS, NOSC, SYRACUSE, NY
    contract · Last action 2011-04-01
    $337,882
  • Department of the Interior
    GOVERNORS ISLAND NATIONAL MONUMENT, REROOF FORT JAY BUILDINGS, NEW YORK COUNTY, NY GOIS 105620
    contract · Last action 2009-09-01
    $331,427
  • Department of the Interior
    DESIGN-BUILD REPAIR ROOF AT BLDG 30 AND ELECTRICAL SYSTEMS AT BLDGS 57 AND 30
    contract · Last action 2010-12-21
    $261,368
  • Department of Defense
    FSC: Z111 RENOVATE BLDG 25
    contract · Last action 2009-02-25
    $227,960
  • Department of Defense
    REPLACE STEAM & CONDENSATE LINE AT WATERVLIET ARMY ARSENAL, WATERVLIET, NY
    contract · Last action 2009-12-29
    $227,615
  • Department of the Interior
    SPOT ROAD REPAIR/MAINTENANCE
    contract · Last action 2009-02-02
    $222,500
  • Department of Defense
    ROAD AND UTILITY REPAIRS SARATOGA NSU
    contract · Last action 2010-05-27
    $216,358
  • Department of the Interior
    STLI PMIS# 104370 "REPLACE SEWAGE GRINDER PUMPS ON LIBERTY ISLAND," STATUE OF LIBERTY NATIONAL MONUMENT, NEW YORK, NEW YORK. THE WORK CONTAINED IN THIS CONTRACT INCLUDES THE FOLLOWING: REPLACING TWO (2) EXISTING 7-1/2 HP GRINDER PUMPS WITH TWO (2) NEW 15 HP GRINDER PUMPS. REPLACING EXISTING GUIDE RAILS TO ACCOMMODATE NEW PUMPS. REPLACING EXISTING ELECTRICAL SERVICE FOR PUMP STATION. PROVIDING NEW CONTROL SYSTEM WHICH WILL BE COMPATIBLE WITH PARK S BUILDING MANAGEMENT SYSTEM (BMS). ASCERTAINING IF NEW PUMPS CAN UTILIZE SOFT START TECHNOLOGY. CONNECTING HIGH LEVEL FLOAT FROM NEW SYSTEM TO NEW PAVILION PUMP STATION TO SHUT PAVILION SYSTEM DOWN IN THE EVENT OF NPS WET WELL OVERFILL. FACILITATING REPAIRS / REPLACEMENT OF FRACTURED SEWER LINE IN WATER / SEWER PIT ON LIBERTY ISLAND.
    contract · Last action 2012-06-14
    $215,647
  • Department of the Interior
    MULTI USE TRAIL WORK
    contract · Last action 2012-06-20
    $209,781
  • Department of Defense
    DEMO BLD 110 AND RENOVATION BLD 105
    contract · Last action 2010-02-25
    $204,187
  • Department of Defense
    REPLACE UNDERGROUND WATER LINES AT WATERVLIET ARMY ARSENAL
    contract · Last action 2009-07-21
    $183,870
  • Department of the Interior
    DEWA - PMIS #147933A - THE WORK OF THIS CONTRACT CONSISTS OF THE GENERAL CONSTRUCTION TO DEMOLISH AND DISPOSE TWO EXISTING TRUCK LIFT AT BUSHKILL MAINTENANCE COMPOUND AUTO SHOP AND INSTALL TWO NEW SERVICE LIFTS. WORK ALSO INCLUDES INSTALLATION OF TRUCK LIFT AT DINGMAN S MAINTENANCE POLE BARN COMPOUND. THE WORK OF THIS PROJECT IS NOT LIMITED TO ALL MATERIALS, LABOR, EQUIPMENT, AND SUPERVISION; ALL PERFORMING OPERATIONS REQUIRED TO COMPLETE THE PROJECT ARE UNDER A SINGLE CONTRACT.
    contract · Last action 2010-08-30
    $170,379

Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2026-03-12. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Part of a larger organization

Cutting Edge Group LLC is one of 271 establishments rolled up under the parent organization Bausch & Lomb Corp.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Bausch & Lomb Corp across all 271 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in water and sewer line and related structures construction within NY, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Bausch & Lomb Corp, ordered by federal enforcement volume:

Related searches

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

About this data

This profile aggregates federal enforcement records on Cutting Edge Group LLC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Bausch & Lomb Corp, which operates 271 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Frequently asked

What is Cutting Edge Group LLC's OSHA violation history?
Cutting Edge Group LLC has no OSHA inspections on record.
How does Cutting Edge Group LLC's safety record compare to its industry?
Cutting Edge Group LLC operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9.