Establishment profile
Central Southern Construction
2410 Harper Street, Jacksonville, FL, 32204
237310 — Highway, Street, and Bridge Construction
Summary
Central Southern Construction has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 5 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
Central Southern Construction appears in WHD wage enforcement and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for Central Southern Construction. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for Central Southern Construction. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Central Southern Construction. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 5+ years. Most recent activity: 5 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 1 violation · $0 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FLSA — minimum wage & overtime | Mar 2021 | 1 | 1 | — | — | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · 1 violations · $0 in backwages
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Mar 2019 – Mar 2021 | Highway, Street, and Bridge Construction | FLSA | 1 | 0 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
No MSHA mine safety violations on file for Central Southern Construction. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for Central Southern Construction. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for Central Southern Construction. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for Central Southern Construction. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Central Southern Construction. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of TransportationTHIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, ANcontract · Last action 2025-08-22$19,430,502
- Department of TransportationPROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITCcontract · Last action 2025-11-17$14,661,421
- Department of TransportationFUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.contract · Last action 2026-01-22$10,492,605
- Department of TransportationMS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING ANDcontract · Last action 2025-05-01$9,123,185
- Department of TransportationPROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPACcontract · Last action 2026-01-21$8,933,610
- Department of TransportationPROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.contract · Last action 2026-01-02$8,221,300
- Department of TransportationPROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVEcontract · Last action 2025-07-23$7,780,555
- Department of TransportationPROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONINcontract · Last action 2025-10-15$6,808,135
- Department of TransportationIGF::OT::IGF THIS INVITATION FOR BIDS IS FOR THE NATCHEZ TRACE PARKWAY, PROJECT NO. PRA-NATR 3F24, LOCATED IN WEBSTER AND CHICKASAW COUNTIES, MISSISSIPPI IN STRICT ACCORDANCE WITH THE SOLICITATION/CONTRACT INSTRUCTIONS, NOTICES, CLAUSES, PROVISIONS, ITEMS LISTED BELOW, AND FOR THE QUANTITIES OF WORK ACTUALLY PERFORMED AT THE UNIT PRICES AS BID IN THE BID SCHEDULE, INCLUDING ALL APPLICABLE FEDERAL, STATE, AND LOCAL TAXES. FP - STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS&BRIDGES ON FEDERAL HIGHWAY PROJECTS. BID SCHEDULE, SECTION B - PAGES B-1 THROUGH B-10. SPECIAL CONTRACT REQUIREMENTS, SECTION J - PAGES J-1 THROUGH J-51. PLANS, SHEETS 1 THROUGH 65. PAVEMENT REPORT, PAGES 1 THROUGH 49. SBA REQUIREMENT NUMBER: 0470-13-303100/01contract · Last action 2020-05-11$6,760,135
- Department of TransportationPROJECT NP SER PMS FY21(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN EVERGLADES NATIONAL PARK. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MARKING INScontract · Last action 2024-07-31$6,330,501
- Department of TransportationCONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.contract · Last action 2026-02-13$4,775,722
- Department of TransportationMI NP MUILTI PMS(1), PAVEMENT PRESERVATION MICHIGAN. WORK CONSISTS OF PATCHING, CRACK SEALING, AND RESURFACING OF ASPHALT SURFACES THROUGH PICTURED ROCKS NATIONAL LAKESHORE AND SLEEPING BEAR FUNES NATIONAL LAKESHORE.contract · Last action 2025-05-21$4,569,517
- Department of TransportationPROJECT NP-SER PMS FY22(1) THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF 29.57 MILES OF MAIN PARK ROAD INCLUDING PULL-OFF AREAS. THE WORK INCLUDES MICRO SURFACING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-02-29$4,483,496
- Department of TransportationPROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.contract · Last action 2026-01-12$4,309,500
- Department of TransportationIGF::OT::IGF PROJECT: CHCH 11(1), 954(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3.3 MILES OF LAFAYETTE ROAD, 0.1 MILES OF THE VISITOR CENTER ACCESS ROAD, AND VARIOUS PULL-OFFS AND PARKING AREAS, ALL WITHIN THE CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, SELECT FULL-DEPTH ASPHALT AND CONCRETE PAVEMENT REPLACEMENT, ASPHALT PAVEMENT WIDENING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, DRAINAGE IMPROVEMENTS, CONCRETE BRIDGE REPAIRS, STONE MASONRY REPAIRS, TRAFFIC SIGNAL REPLACEMENT, AND OTHER MISCELLANEOUS WORK.contract · Last action 2016-04-11$3,580,685
- Department of TransportationPROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED AREcontract · Last action 2025-02-26$3,495,405
- Department of DefenseIGF::OT::IGF ROADWAY REPAIRS - EAST SARATOGA AVENUEcontract · Last action 2016-07-28$2,886,557
- Department of DefenseREPAVE YORKTOWN AVENUE, NASJAX, FLcontract · Last action 2020-05-28$2,741,825
- Department of DefenseDREDGE MATERIAL MANAGEMENT AREA DIKE REPAIRS IGF::CT::IGFcontract · Last action 2019-09-28$2,621,524
- Department of TransportationPROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MScontract · Last action 2025-12-02$2,592,163
- Department of TransportationPROJECT NP SER PMS FY21(2): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN BIG CYPRESS NATIONAL PRESERVE. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MAcontract · Last action 2024-11-14$2,555,354
- Department of TransportationFL ERFO NPS GUIS 2020-1(1) THE PROJECT CONSISTS OF THE REPAIR STORM DAMAGE ON J. EARLE BOWDEN WAY, FORT PICKENS ROAD, JOHNSON BEACH ROAD, AND BEACH PARKING #6 WITHIN THE GULF ISLANDS NATIONAL SEASHORE, FLORIDA DISTRICT. THE WORK INCLUDES ASPHALT PAcontract · Last action 2026-02-23$2,534,156
- Department of TransportationNC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TOcontract · Last action 2025-09-17$2,279,350
- Department of TransportationPROJECT NP-EVER 219(1), 222(1): THE PROJECT CONSISTS OF THE ASPHALT PAVEMENT MILLING AND OVERLAY, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKING, RAISED PAVEMENT MARKER, CULVERT AND MANHOLE REPLACEMENT, REMOVE AND REST INLET FRAME AND GRATE, REPLACEMENcontract · Last action 2025-03-12$2,276,875
- Department of DefenseIGF::OT::IGF ROADWAY REPAIRS - WEST SARATOGA AVENUEcontract · Last action 2016-07-28$2,221,702
- Department of DefenseIGF::OT::IGF REPAIR FIRE WATER LINES CC RD.contract · Last action 2015-09-30$1,864,466
- Department of TransportationGA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREGcontract · Last action 2026-03-05$1,843,125
- Department of TransportationIGF::OT::IGF PROJECT: SER PMS FY16(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION OF EXISTING ROADWAYS AND PARKING AREAS WITHIN THE CANAVERAL NATIONAL SEASHORE. THE WORK INCLUDES ASPHALT PAVEMENT REPAIRS CONSISTING OF FULL-DEPTH PAVEMENT PATCHING, CRACK CLEANING AND SEALING, CHIP SEALING, AND ASPHALT PAVEMENT OVERLAY. THE WORK ALSO INCLUDES PORTLAND CEMENT CONCRETE PAVEMENT JOINT REPAIRS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-06-01$1,806,288
- Department of DefenseIGF::OT::IGF REPAIR WATER LINES, NW INDUSTRIAL AREAcontract · Last action 2017-06-28$1,773,584
- Department of TransportationPROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2026-03-11$1,703,080
- Department of TransportationPROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2026-01-20$1,582,756
- Department of TransportationPROJECT NP-DEWA 14(18) 121(1) CONSISTS OF THE REHABILITATION AND PREVENTATIVE MAINTENANCE OF BRIDGES IN THE DELAWARE WATER GAP NATIONAL RECREATION AREA. THE WORK INCLUDES ROADWAY EXCAVATION, RIPRAP PLACEMENT, ASPHALT CONCRETE PATCHING, CONCRETE REPAIcontract · Last action 2024-08-05$1,543,004
- Department of DefenseKISSIMMEE RIVER RESTORATION RIVER ACRES SUPPLEMENTAL WORK OKEECHOBEE COUNTY FLORIDAcontract · Last action 2016-08-26$1,355,403
- Department of TransportationIGF::OT::IGF PROJECT SER-PMS FY16(2) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION OF EXISTING ROADWAYS AND PARKING AREAS WITHIN THE FORT MATANZAS NATIONAL MONUMENT, CASTILLO DE SAN MARCOS NATIONAL MONUMENT, FORT CAROLINE NATIONAL MEMORIAL, TIMUCUAN ECOLOGICAL AND HISTORIC PRESERVE, FORT FREDERICA NATIONAL MONUMENT, FORT PULASKI NATIONAL MONUMENT, AND FORT SUMTER NATIONAL MONUMENT. THE WORK INCLUDES FULL-DEPTH ASPHALT AND PARTIAL DEPTH PORTLAND CEMENT CONCRETE PAVEMENT PATCHING AND REPAIRS, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT CHIP SEALING AND OVERLAY, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-03-05$1,336,832
- Department of DefenseDMMA DYSON ISLANDcontract · Last action 2017-04-13$1,074,449
- Department of DefenseIGF::OT::IGF = OTHER FUNCTIONS X005 ASPHALT REPAIRS VARIOUS LOCATIONScontract · Last action 2019-07-23$1,022,239
- Department of DefenseLSGA112025 REPAIR ROADS BASEWIDE, LSGA132004 REPAIR PARKING LOTS BASEWIDE, 125TH FW, JACKSONVILLE, BLcontract · Last action 2013-07-24$1,014,695
- Department of DefenseWIDEN SEVERAL INTERSECTIONS, NWC NAS JAXcontract · Last action 2022-04-02$936,952
- Department of TransportationSOEN: EMERGENCY REPAIR STORM-DAMAGED ON FORT PICKERNS ROAD AND J.E. BOWDEN WAY LOCATED IN GULF ISLAND NATIONAL SEASHORE AND ESCAMBIA COUNTY, FLORIDA.contract · Last action 2026-02-20$910,000
- Department of the InteriorCONSTRUCTION, REPAIR COLLAPSED STORM DRAIN AT CASTILLO DE SAN MARCOScontract · Last action 2025-08-13$775,675
- Department of DefenseIGF::OT::IGF LSGA092012 EXPANSION (NEW CONSTRUCTION AND REPAIR)contract · Last action 2014-11-28$723,933
- Department of TransportationPROJECT FIIS BURMA ROUTE: THE PROJECT CONSISTS OF THE RECONSTRUCTION OF AN APPROXIMATE 0.59 MILE SEGMENT OF BURMA ROUTE (ROUTE 0100). THE WORK INCLUDES EMBANKMENT CONSTRUCTION, RESURFACING WITH AGGREGATE BASE, SEPARATION-STABILIZATION GEOTEXTILE PLcontract · Last action 2022-09-22$710,526
- Department of TransportationIGF::OT::IGF PROJECT: GULF ISLAND NATIONAL SEASHORE. THIS PROJECT INVOLVES CLEANUP AND REPAIR OF STORM DAMAGE ON FORT PICKERNS ROAD AND J.E. BOWDEN WAY IN GULF ISLANDS NATIONAL SEASHORE.contract · Last action 2020-07-27$699,996
- Department of TransportationPROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOUcontract · Last action 2026-01-07$662,370
- Department of TransportationIGF::OT::IGF LOWER SUWANNEE NATIONAL WILDLIFE REFUGE PROJECT FW LOSU 100(1),101(1), SOLICITATION NUMBER DTFH71-13-B-00042, LOCATED IN LEVY COUNTY, FLORIDA. THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 0.7 MILES OF VISTA ROAD (ROUTE 100) AND PARKING AREAS (ROUTES 900 AND 901), AND MISCELLANEOUS WORK ON MAIN LOOP ROAD (ROUTE 010) AND POND 4 ROAD (ROUTE 101), WITHIN THE LOWER SUWANNEE NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES GRADING, EARTHWORK GEOTEXTILE, LIMEROCK AGGREGATE, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2017-01-19$511,455
- Department of TransportationIGF::OT::IGF:: PROJECT: PKR 10(2) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 2.8 MILES OF SUNSET DRIVE AND FOUR PARKING AREAS WITHIN THE PARKER RIVER NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES SCARIFICATION OF THE EXISTING AGGREGATE SURFACE, AGGREGATE RESURFACING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2017-01-11$511,191
- Department of DefenseIGF::OT::IGF REPAIR ROADWAYS AND CONTAINMENT AREAS, NAS JAX JACKSONVILLE, FLcontract · Last action 2016-06-15$492,299
- Department of TransportationPROJECT FW-EDFO 104(1), 906(1) THE PROJECT CONSISTS OF THE REHABILITATION AND WIDENING OF SCOTTS LANDING ROAD AND SCOTTS LANDING PARKING AREA WITHIN THE EDWIN B. FORSYTHE NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES GRADING, AGGREGATE BASE, ALUMINUMcontract · Last action 2024-10-24$489,380
- Department of TransportationPROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.contract · Last action 2026-03-11$477,370
- Department of TransportationNP-VICK 12(5), 20(2) THE PROJECT CONSISTS OF PAVEMENT REPAIR ON CONFEDERATE AVENUE (ROUTE 12) AND SLIDE REPAIR ON UNION AVENUE (ROUTE 20). THE WORK INCLUDES EARTHWORK, GABION WALL, AGGREGATE BASE, ASPHALT PAVING, CONCRETE PAVING, DRAINAGE, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-11-21$471,902
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-03-11. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within FL, ordered by federal enforcement volume:
- SGL CONSTRUCTORSMAITLAND — 3 federal enforcement records
- ANDERSON COLUMBIA CO., INC.LAKE CITY — 2 federal enforcement records
- ANDERSON COLUMBIA CO., INC.SAINT AUGUSTINE — 2 federal enforcement records
- ANDERSON COLUMBIA CO., INC.HOLT — 2 federal enforcement records
- RIPA & ASSOCIATES, L.L.C.VALRICO — 2 federal enforcement records
- COMMUNITY ASPHALT CORP.HIALEAH — 2 federal enforcement records
- MARKS BROTHERS, INC.HOLLYWOOD — 2 federal enforcement records
- WESTWIND CONTRACTING, INC.ELKTON — 2 federal enforcement records
- GULF COAST REBAR, INC.GIBSONTON — 2 federal enforcement records
- RINKER MATERIALSMIAMI — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in FLState-wide enforcement data
- Highway, Street, and in FLIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on Central Southern Construction from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is Central Southern Construction's OSHA violation history?
- Central Southern Construction has no OSHA inspections on record.
- How does Central Southern Construction's safety record compare to its industry?
- Central Southern Construction operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8.