Establishment profile
APAC-KANSAS, INC.
7355 W. 162ND TERRACE, OVERLAND PARK, KS, 66085
324121 — Asphalt Paving Mixture and Block Manufacturing
Summary
APAC-KANSAS, INC. has accumulated 4 OSHA violations across 1 inspection over 15 years of recorded history, with $3,150 in total assessed penalties.
The establishment sits in the 64th percentile for violations within its industry-state peer group of 29 employers. The most recent enforcement activity was recorded 15 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
APAC-KANSAS, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Peer comparison
Above average violations in NAICS 3241 within KS. Peer group: 29 employers. This establishment has 4 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for APAC-KANSAS, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for APAC-KANSAS, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 15+ years. Most recent activity: 15 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for APAC-KANSAS, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in KS — for APAC-KANSAS, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other APAC-KANSAS, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 59S&S · 64 contractor · $54,252 proposed / $42,213 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9535253 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2022 | — | Yes | ModNegligence | $6,898 | $934 |
| 6459576 | HUTCHINSON SAND PLANT Reno, KS | Oct 2010 | — | Yes | HighNegligence | $4,440 | $4,440 |
| 9392521 | HUTCHINSON SAND PLANT Reno, KS | Feb 2019 | — | Yes | HighNegligence | $2,834 | $2,834 |
| 9574029 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Nov 2022 | — | Yes | HighNegligence | $2,790 | $2,790 |
| 9530272 | HUTCHINSON SAND PLANT Reno, KS | May 2021 | — | Yes | HighNegligence | $2,626 | $2,626 |
| 8937254 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Dec 2016 | — | No | ModNegligence | $1,508 | $958 |
| 8588057 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Feb 2012 | — | No | ModNegligence | $1,400 | $473 |
| 6324374 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Dec 2006 | — | No | ModNegligence | $963 | $963 |
| 8760690 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2014 | — | Yes | HighNegligence | $873 | $800 |
| 6459356 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Sep 2010 | — | Yes | HighNegligence | $873 | $873 |
| 9531671 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2021 | — | Yes | ModNegligence | $791 | $791 |
| 9392523 | HUTCHINSON SAND PLANT Reno, KS | Feb 2019 | — | Yes | HighNegligence | $768 | $768 |
| 8760689 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2014 | — | No | HighNegligence | $764 | $700 |
| 6447688 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Mar 2009 | — | Yes | ModNegligence | $687 | $687 |
| 5042903 | HUTCHINSON SAND PLANT Reno, KS | Apr 2026 | — | No | HighNegligence | $642 | — |
| 8759891 | Olathe Quarry Johnson, KS contractor: APAC-Kansas, Inc. | Sep 2014 | — | Yes | LowNegligence | $634 | $400 |
| 6593273 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | May 2011 | — | Yes | ModNegligence | $634 | $634 |
| 8833476 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Mar 2016 | — | No | ModNegligence | $585 | $131 |
| 8936675 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2015 | — | Yes | ModNegligence | $585 | $131 |
| 8760582 | Olathe Lone Elm Quarry Johnson, KS contractor: APAC-Kansas, Inc. | Feb 2015 | — | Yes | ModNegligence | $585 | $585 |
| 8760661 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $585 | $585 |
| 8760657 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $585 | $969 |
| 8760656 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $585 | $450 |
| 8760650 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $585 | $585 |
| 8760649 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $585 | $450 |
| 6593278 | Shawnee Quarry Johnson, KS | Jun 2011 | — | No | ModNegligence | $585 | $131 |
| 6447638 | Gardner Linn, KS | Nov 2008 | — | Yes | ModNegligence | $585 | $176 |
| 8829257 | HUTCHINSON SAND PLANT Reno, KS | Dec 2014 | — | Yes | ModNegligence | $540 | $540 |
| 6593269 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Apr 2011 | — | No | ModNegligence | $540 | $540 |
| 6459818 | Cedarapids 1 Portable Plant Johnson, KS contractor: Apac-Kansas Inc | Aug 2010 | — | Yes | ModNegligence | $540 | $540 |
| 6593304 | Cedarapids 1 Portable Plant Johnson, KS contractor: Apac-Kansas Inc | Jul 2011 | — | Yes | ModNegligence | $499 | $499 |
| 6593238 | Shawnee Quarry Johnson, KS | Dec 2010 | — | No | ModNegligence | $499 | $100 |
| 6421693 | Gardner Linn, KS | Nov 2007 | — | Yes | ModNegligence | $499 | $499 |
| 9578225 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Nov 2023 | — | Yes | ModNegligence | $407 | $407 |
| 8833334 | HUTCHINSON SAND PLANT Reno, KS | May 2015 | — | No | HighNegligence | $362 | $362 |
| 6459331 | Shawnee Quarry Johnson, KS | Aug 2010 | — | No | HighNegligence | $334 | $334 |
| 9340386 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jan 2018 | — | No | ModNegligence | $311 | $311 |
| 9340385 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jan 2018 | — | No | ModNegligence | $311 | $311 |
| 6325361 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Nov 2007 | — | Yes | ModNegligence | $308 | $308 |
| 8937215 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2016 | — | Yes | ModNegligence | $300 | $300 |
| 8936683 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Sep 2015 | — | Yes | ModNegligence | $293 | $100 |
| 6593275 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | May 2011 | — | No | ModNegligence | $285 | $100 |
| 6447689 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Mar 2009 | — | Yes | ModNegligence | $285 | $285 |
| 9578945 | HUTCHINSON SAND PLANT Reno, KS | Oct 2024 | — | No | HighNegligence | $280 | $280 |
| 8760678 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | No | ModNegligence | $263 | $263 |
| 8760677 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8760675 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | No | ModNegligence | $263 | $263 |
| 8760665 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | No | ModNegligence | $263 | $263 |
| 8760663 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | No | LowNegligence | $263 | $263 |
| 8760652 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8760651 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jul 2014 | — | Yes | ModNegligence | $263 | $250 |
| 8594300 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Oct 2012 | — | Yes | ModNegligence | $263 | $263 |
| 8586726 | HUTCHINSON SAND PLANT Reno, KS | Jul 2012 | — | Yes | ModNegligence | $263 | $263 |
| 8586710 | HUTCHINSON SAND PLANT Reno, KS | Jul 2012 | — | Yes | ModNegligence | $263 | $263 |
| 8587934 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Apr 2012 | — | Yes | LowNegligence | $263 | $131 |
| 8587932 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Apr 2012 | — | Yes | ModNegligence | $263 | $263 |
| 8587798 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Mar 2012 | — | Yes | ModNegligence | $263 | $263 |
| 6593935 | HUTCHINSON SAND PLANT Reno, KS | Apr 2011 | — | Yes | ModNegligence | $263 | $263 |
| 6459365 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Sep 2010 | — | Yes | ModNegligence | $263 | $263 |
| 6459364 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Sep 2010 | — | Yes | ModNegligence | $263 | $263 |
| 6459354 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Sep 2010 | — | Yes | ModNegligence | $263 | $263 |
| 8829258 | HUTCHINSON SAND PLANT Reno, KS | Dec 2014 | — | Yes | ModNegligence | $243 | $243 |
| 9392522 | HUTCHINSON SAND PLANT Reno, KS | Feb 2019 | — | No | HighNegligence | $230 | $230 |
| 6459804 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Aug 2010 | — | Yes | ModNegligence | $224 | $224 |
| 6459329 | Shawnee Quarry Johnson, KS | Jul 2010 | — | Yes | ModNegligence | $224 | $224 |
| 6459328 | Shawnee Quarry Johnson, KS | Jul 2010 | — | Yes | ModNegligence | $224 | $224 |
| 6449393 | Olathe Quarry Johnson, KS contractor: APAC-Kansas, Inc. | Dec 2009 | — | Yes | ModNegligence | $224 | $224 |
| 6429522 | HAYS PORTABLE PLANT #1 Thomas, KS | Feb 2009 | — | Yes | ModNegligence | $224 | $224 |
| 5042284 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jan 2026 | — | No | ModNegligence | $209 | — |
| 6287557 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Apr 2003 | — | Yes | ModNegligence | $207 | $207 |
| 9578572 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Oct 2024 | — | No | ModNegligence | $204 | $204 |
| 8937389 | Shawnee Quarry Johnson, KS | Jul 2017 | — | Yes | ModNegligence | $204 | $204 |
| 5042904 | HUTCHINSON SAND PLANT Reno, KS | Apr 2026 | — | No | ModNegligence | $193 | — |
| 5042043 | HUTCHINSON SAND PLANT Reno, KS | Jul 2025 | — | No | ModNegligence | $193 | $193 |
| 5042042 | HUTCHINSON SAND PLANT Reno, KS | Jul 2025 | — | No | ModNegligence | $193 | $193 |
| 5042040 | HUTCHINSON SAND PLANT Reno, KS | Jul 2025 | — | No | ModNegligence | $193 | $193 |
| 6318322 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | May 2006 | — | Yes | ModNegligence | $191 | $191 |
| 8760081 | Olathe Quarry Johnson, KS contractor: APAC-Kansas, Inc. | Mar 2014 | — | Yes | ModNegligence | $190 | $190 |
| 9578946 | HUTCHINSON SAND PLANT Reno, KS | Oct 2024 | — | No | ModNegligence | $189 | $189 |
| 9578944 | HUTCHINSON SAND PLANT Reno, KS | Oct 2024 | — | No | ModNegligence | $189 | $189 |
| 9574502 | HUTCHINSON SAND PLANT Reno, KS | Jun 2023 | — | No | ModNegligence | $182 | $182 |
| 9574501 | HUTCHINSON SAND PLANT Reno, KS | Jun 2023 | — | No | ModNegligence | $182 | $182 |
| 9574162 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | May 2023 | — | No | ModNegligence | $182 | $182 |
| 8833804 | Olathe Lone Elm Quarry Johnson, KS contractor: APAC-Kansas, Inc. | Oct 2015 | — | No | HighNegligence | $176 | $176 |
| 6593216 | Olathe Quarry Johnson, KS contractor: APAC-Kansas, Inc. | Oct 2010 | — | Yes | ModNegligence | $176 | $176 |
| 6287556 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Apr 2003 | — | Yes | ModNegligence | $173 | $173 |
| 6321331 | Cedarapids 1 Portable Plant Johnson, KS contractor: Apac-Kansas Inc | Jan 2006 | — | Yes | ModNegligence | $165 | $165 |
| 6321330 | Cedarapids 1 Portable Plant Johnson, KS contractor: Apac-Kansas Inc | Jan 2006 | — | Yes | ModNegligence | $165 | $165 |
| 6321332 | Cedarapids 1 Portable Plant Johnson, KS contractor: Apac-Kansas Inc | Jan 2006 | — | Yes | ModNegligence | $165 | $165 |
| 6321329 | Cedarapids 1 Portable Plant Johnson, KS contractor: Apac-Kansas Inc | Jan 2006 | — | Yes | ModNegligence | $165 | $165 |
| 6593268 | Louisburg Quarry Miami, KS contractor: Apac-Kansas Inc | Apr 2011 | — | No | ModNegligence | $162 | $162 |
| 9820960 | HAYS PORTABLE PLANT #1 Thomas, KS | Jul 2024 | — | No | ModNegligence | $161 | $161 |
| 6289805 | HAYS PORTABLE PLANT #1 Thomas, KS | Aug 2004 | — | Yes | ModNegligence | $154 | $154 |
| 5042906 | HUTCHINSON SAND PLANT Reno, KS | Apr 2026 | — | No | ModNegligence | $151 | — |
| 5042905 | HUTCHINSON SAND PLANT Reno, KS | Apr 2026 | — | No | LowNegligence | $151 | — |
| 5042902 | HUTCHINSON SAND PLANT Reno, KS | Apr 2026 | — | No | ModNegligence | $151 | — |
| 5042285 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jan 2026 | — | No | ModNegligence | $151 | — |
| 5042041 | HUTCHINSON SAND PLANT Reno, KS | Jul 2025 | — | No | ModNegligence | $151 | $151 |
| 9769725 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 9769724 | Bonner Springs Quarry Wyandotte, KS contractor: APAC-Kansas, Inc. | Jun 2025 | — | No | ModNegligence | $151 | $151 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for APAC-KANSAS, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for APAC-KANSAS, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for APAC-KANSAS, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for APAC-KANSAS, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of Defense500 TONS OF 1.5" GRAVELcontract · Last action 2011-09-20$16,057
- Department of DefenseTMS 9000E, CRANE&OPERATORcontract · Last action 2012-08-08$8,520
- Department of JusticeGRAVEL FOR CST SITEcontract · Last action 2011-03-07$7,249
- Department of JusticeGRAVEL FOR FIRING RANGEcontract · Last action 2011-01-06$4,380
- Department of JusticeROCKcontract · Last action 2011-08-30$3,842
- Department of DefenseTHIS IS A BPA FOR QUARRY MATERIALS AT VARIOUS LOCATIONS ALONG THE MISSOURI RIVER.contract · Last action 2013-05-14$0
Federal contract dollars to this establishment. Primary NAICS: 238910 - SITE PREPARATION CONTRACTORS. Last action: 2013-05-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2010-08-27 | Planned | 4 | 4 | $3,150 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in asphalt paving mixture and block manufacturing within KS, ordered by federal enforcement volume:
- HOLLAND CORPORATION, INC.OLATHE — 1 federal enforcement record
- HERZOG CONTRACTING CORP.ELWOOD — 1 federal enforcement record
- AMERICAN WASTE MANAGEMENT, INC.WINFIELD — 1 federal enforcement record
Related searches
- Asphalt Paving Mixture and Block ManufacturingAll employers in this industry
- Employers in KSState-wide enforcement data
- Asphalt Paving Mixture in KSIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on APAC-KANSAS, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is APAC-KANSAS, INC.'s OSHA violation history?
- APAC-KANSAS, INC. has 1 OSHA inspection on record with 4 violations and $3,150 in total penalties.
- How does APAC-KANSAS, INC.'s safety record compare to its industry?
- APAC-KANSAS, INC. operates in the asphalt paving mixture and block manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.2.