Summary
AIRLOCK INC has accumulated 7 OSHA violations across 1 inspection over 45 years of recorded history, with $300 in total assessed penalties.
The establishment sits in the 77th percentile for violations within its industry-state peer group of 25,052 employers. The most recent enforcement activity was recorded 45 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
AIRLOCK INC appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Peer comparison
Above average violations. Peer group: 25,052 employers. This establishment has 7 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for AIRLOCK INC. Verify directly with OSHA Injury Tracking Application →
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for AIRLOCK INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 45+ years. Most recent activity: 45 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for AIRLOCK INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for AIRLOCK INC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for AIRLOCK INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for AIRLOCK INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for AIRLOCK INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for AIRLOCK INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- National Aeronautics and Space AdministrationHELMET, NECK RING AND EXTRAVEHICULAR VISOR ASSEMBLY (EVVA)contract · Last action 2024-06-27$2,746,014
- National Aeronautics and Space AdministrationLARGE HUT ASSEMBLYcontract · Last action 2022-12-12$1,665,203
- National Aeronautics and Space AdministrationOCSS SUIT HARDGOODScontract · Last action 2021-11-16$862,110
- National Aeronautics and Space AdministrationOCSS SUIT HARDGOODScontract · Last action 2022-07-28$737,130
- National Aeronautics and Space AdministrationFABRICATION FOR XLCVG CONNECTORScontract · Last action 2020-02-10$692,934
- National Aeronautics and Space AdministrationIGF::OT::IGF AIR-LOCK'S PHASE I EFFORT TESTED THE EFFECTS OF BALL INDUCED CONTACT STRESSES ON TITANIUM BEARING RACES. THE CONTACT STRESS DESIGN LIMIT THAT WOULD ACHIEVE A PLANETARY EXPLORATION SUITS REQUIRED CYCLE LIFE WAS DETERMINED. THESE TESTS WERE PERFORMED ON UNIFORMLY LOADED FLAT THRUST BEARING STYLE TEST PLATES. THE PHASE II EFFORT WILL TAKE THIS INFORMATION AND USE IT IN A REAL WORLD APPLICATION, EXISTING ADVANCED PLANETARY EXPLORATION SUITS BEARINGS. SPECIFICALLY FOCUSING ON THE Z-1 SERIES SUITS HIP AND WAIST, AND ALSO THE Z-2 SERIES HIP BEARINGS. THESE ARE AREAS THAT ARE KNOWN TO HAVE LARGE CONTACT STRESSES DUE TO NON-UNIFORM LOADING THROUGH AXIAL RESTRAINT LINES. THIS LOADING YIELDS INCREASED STRESSES IN DIFFERENT AREAS OF THE RACE. WITH AN UNDERSTANDING OF THE MAX EXPECTED STRESS, THE BEARING DESIGN CAN BE MADE TO ACCOMMODATE ALL CONTACT STRESSES APPLIED TO THE RACE. THE PHASE II EFFORT WILL CONSIST OF FINDING THE MAXIMUM EXPECTED CONTACT STRESSES IN THESE BEARINGS THROUGH BOTH TEST AND FEA SIMULATION. THE BEARING DESIGNS CAN THEN BE OPTIMIZED TO REDUCE THE CONTACT STRESSES IN THESE AREAS. AIR-LOCK WILL MANUFACTURE DVT UNITS IN ORDER TO CYCLE TEST THE OPTIMIZED BEARINGS. THE TASK WILL BE FINALIZED WITH THE DELIVERY OF OPTIMIZED BEARINGS CAPABLE OF BEING USED ON THE Z-1 SERIES AND Z-2 SERIES SUITS.contract · Last action 2019-09-20$675,004
- National Aeronautics and Space AdministrationFABRICATION FOR DVT WEDGE AND HUT VENTS OF THE EXPLORATION EXTRAVEHICULAR MOBILITY UNIT ASSEMBLY COMPONENTScontract · Last action 2019-09-05$578,140
- National Aeronautics and Space AdministrationZ 2.5 HARD UPPER TORSO (HUT) ASSEMBLYcontract · Last action 2018-11-15$425,500
- National Aeronautics and Space AdministrationHARD UPPER TORSO (HUT) ASSEMBLYcontract · Last action 2020-03-12$400,240
- National Aeronautics and Space AdministrationUMBILICAL INTERFACE CONNECTORScontract · Last action 2021-12-14$349,770
- National Aeronautics and Space AdministrationXEMU AUXILIARY THERMAL LOOP CONNECTOR (ATLC) MULTIPLE WATER CONNECTOR (MWC)contract · Last action 2018-12-13$249,980
- National Aeronautics and Space AdministrationXEMU EXPLORATION LIQUID COOLING AND VENTILATION GARMENT XLCVG CONNECTORScontract · Last action 2021-06-21$201,040
- Department of Defense8509984486!VALVE,PNEUMATIC INFcontract · Last action 2023-06-30$193,806
- National Aeronautics and Space AdministrationXEMU HELMET FABRICATIONcontract · Last action 2022-10-06$184,800
- Department of Defense8507755248!VALVE,PNEUMATIC INFcontract · Last action 2021-12-07$182,400
- National Aeronautics and Space AdministrationMK-III PROTOTYPE SPACE SUIT HARDWARE AND SPAREScontract · Last action 2011-12-06$178,409
- National Aeronautics and Space AdministrationXEXTRAVEHICULAR MOBILITY UNIT (EMU) EXTRAVEHICULAR VISOR ASSEMBLY (EVVA)contract · Last action 2018-01-19$163,500
- Department of Defense4518332519!VALVE,PNEUMATIC INFcontract · Last action 2011-07-06$149,500
- Department of Defense8501462424!VALVE,PNEUMATIC INFcontract · Last action 2014-10-24$145,452
- Department of Defense4523844387!PV IRAQcontract · Last action 2013-03-01$143,900
- Department of Defense4521355322!BOAcontract · Last action 2012-05-21$138,500
- Department of Defense4520539460!BOAcontract · Last action 2012-02-28$138,500
- Department of Defense4520138891!BOAcontract · Last action 2012-01-17$138,500
- National Aeronautics and Space AdministrationIGF::OT::IGF AS HUMAN SPACEFLIGHT ONCE AGAIN MOVES TOWARD PLANETARY EXPLORATION, SPACE SUIT HARDWARE MUST BE READY TO FACE THE HARSH ENVIRONMENTAL CONDITIONS OF THESE SURFACES. THIS IS ESPECIALLY TRUE FOR HIGH PRESSURE OXYGEN QUICK DISCONNECTS. THESE SYSTEMS ARE CRITICAL LIFE SUPPORT ITEMS THAT ENABLE THE FLOW OF BREATHING GAS, WATER, AND ELECTRICAL&COMMUNICATION SIGNALS FROM THE SUIT TO THE VEHICLE OR HABITAT. LUNAR AND MARTIAN DUST AND REGOLITH CAN HAVE A DETRIMENTAL EFFECT RANGING FROM AN ANNOYANCE DURING MATE&DEMATE, TO A SEVERE HAZARD THROUGH CONTAMINATION OF THE BREATHING GAS LINES. THE WORK PROPOSED IN THIS EFFORT WILL FOCUS ON DUST MITIGATION STRATEGIES THAT CAN BE USED IN A VARIETY OF HIGH PRESSURE OXYGEN QUICK DISCONNECTS. AS A TEST BED FOR THIS EFFORT, AIR-LOCK WILL FOCUS ON THE EXISTING CONNECTOR DESIGNS OF THE EMU SCU/DCM MULTIPLE CONNECTORS, AND THE CSSS T-HANDLE MULTIPLE CONNECTOR. HOWEVER, THE TASK WILL DETERMINE DUST MITIGATION STRATEGIES THAT WILL BE EXTENSIBLE TO ANY EXISTING OR FUTURE CONNECTOR DESIGN. THE FIRST STEP IN THIS PROCESS IS IDENTIFYING THE EFFECTS THAT DUST AND REGOLITH WILL HAVE. THE NEXT STEP WILL BE A MULTIFACETED APPROACH, WE WILL LOOK TO MITIGATE DUST THROUGH 1) MATERIAL AND COATING TECHNOLOGIES 2) MECHANICAL DESIGN FEATURES SUCH AS PURGES, WIPERS, AND DUST SEALS 3) CONNECTOR COVERING AND SHIELDING. AFTER A VARIETY OF DUST MITIGATION OPTIONS ARE DEVELOPED, THE THIRD STEP IN THIS PROCESS WILL BE IMPLEMENTATION OF THE STRATEGIES INTO THE CONNECTOR DESIGNS. THE FINAL STEP IN THIS PROCESS WILL BE TESTING OF THE STRATEGIES THROUGH SAMPLES AND MOCK-UPS IN A SIMULATED DIRTY ENVIRONMENT.contract · Last action 2016-06-07$124,821
- National Aeronautics and Space AdministrationIGF::OT::IGF IN RESPONSE TO NASA 2015 SBIR TOPIC H4.02, AIR-LOCK PROPOSES TO DEFINE THE MAXIMUM ALLOWABLE CONTACT STRESS FOR TITANIUM BEARINGS. THE MODULUS OF TITANIUM IS LOWER THAN LEGACY SPACESUIT BEARING MATERIALS (STAINLESS STEEL). DUE TO THIS, TITANIUM BEARINGS ARE MORE SUSCEPTIBLE TO DEFLECTION UNDER MAN AND PLUG LOAD SCENARIOS. BEARING DEFLECTION CAUSES A LIMITED NUMBER OF BALLS TO ABSORB THE FULL LOAD AND RESULTS IN HIGHER, LOCALIZED, CONTACT STRESSES. LOCALIZED CONTACT STRESS IS BELIEVED TO BE THE MAIN CONTRIBUTOR TO THE BEARING RACE DEGRADATION OBSERVED DURING NASA'S 2014 OXYGEN COMPATIBILITY TESTING. IN PHASE 1, WE WILL CORRELATE ANALYTICAL CONTACT STRESS DATA WITH SAMPLE BEARING TEST DATA. THIS CORRELATION WILL CHARACTERIZE BEARING WEAR AND DEGRADATION RELATIVE TO BALL CONTACT STRESS. MULTIPLE TEST ITERATIONS WILL BE PERFORMED TO CLEARLY IDENTIFY THE CONTACT STRESS THAT DEGRADES A TITANIUM RACE. WE WILL ALSO DETERMINE IF THERE ARE COMMERCIAL SURFACE TREATMENTS (COATINGS) THAT MAY ENHANCE TITANIUM WEAR RESISTANCE. AT THE CONCLUSION OF PHASE 1, WE SHALL HAVE IDENTIFIED THE MAXIMUM ALLOWABLE BEARING CONTACT STRESS. THIS DATA POINT WILL SERVE AS A VALUABLE DESIGN GUIDELINE FOR FUTURE BEARING DESIGNS AND SHOULD YIELD REDUCED CERTIFICATION AND DEVELOPMENT COSTS.contract · Last action 2015-06-09$124,085
- National Aeronautics and Space AdministrationNRE NON-RECURRING ENGINEERING CHARGES FOR MOBILE LTA ADAPTER ASSEMBLYcontract · Last action 2019-10-21$122,620
- National Aeronautics and Space AdministrationOT - HUT, HATCH AND TEST SAMPLEScontract · Last action 2018-03-22$119,060
- National Aeronautics and Space AdministrationIGF::OT::IGF THE CURRENT NASA SPACESUIT COMMUNITY IS FOCUSING ON UTILIZING A 13" HEMISPHERICAL HELMET FOR THE NEXT GENERATION OF EXTRAVEHICULAR ACTIVITY SPACESUITS. THIS HELMET ARCHITECTURE PRESENTS THE END USER WITH A MYRIAD OF POSITIVE ATTRIBUTES, INCLUDING A LARGE FIELD OF VIEW, ENHANCED CO2 WASHOUT AND IMPROVED COMPONENT DURABILITY/OPERATIONAL LIFE. THE 13" DOME HELMET ARCHITECTURE HAS PROVEN THESE ATTRIBUTES VIA THE NASA MK-III AND Z-1 ADVANCED EVA SPACESUIT TEST BEDS. AIR-LOCK'S 2012 SBIR PROPOSAL ADVANCES THE 13" DOME HELMET FROM NASA PROTOTYPE/TEST BED TO EVA ACCEPTABILITY FOR USE BY ENHANCING THE DESIGN WITH A FULLY FUNCTIONAL EXTRAVEHICULAR VISOR ASSEMBLY (EVVA). PHASE I WILL SEE AIR-LOCK ENGINEERS LEVERAGE CURRENT HELMET/EVVA TECHNOLOGIES, INFUSE THE DESIGN WITH LESSONS LEARNED FROM THE EMU PROGRAM AND IMPLEMENT THE RESULTANT DESIGN INTO A 13" HEMISPHERICAL HELMET ARCHITECTURE; HERETOFORE REFERRED TO AS THE ADVANCED EXTRAVEHICULAR HELMET ASSEMBLY (AEHA). IN ADDITION TO THE DESIGN FACET OF THE PHASE I TASK, AIR-LOCK ENGINEERS WILL DEVELOP A VERIFICATION AND VALIDATION TEST PLAN (V&V) BASED ON CURRENT EMU S/AD AND CARD REQUIREMENTS ALONG WITH HIGHER ADVANCED EVA OPERATING PRESSURES (8.0 PSI). THIS TEST PLAN WILL LAY THE FOUNDATION FOR PHASE 2 ACCEPTABILITY FOR USE TESTING TO FACILITATE THE USE OF THE AEHA ABOARD THE INTERNATIONAL SPACE STATION IN SUPPORT OF NASA'S PLANNED 2017 ISS ADVANCED SPACESUIT DEMONSTRATION TEST.contract · Last action 2013-05-17$117,809
- Department of Defense8511014111!VALVE,PNEUMATIC INFcontract · Last action 2024-11-20$115,992
- National Aeronautics and Space AdministrationIGF::OT::IGF DESIGN&DEVELOP HELMET&EVA PROTOTYPEcontract · Last action 2017-06-02$100,800
- National Aeronautics and Space AdministrationINTERCHANGEABLE BEARINGS FOR PROFILE AND WEIGHT TRADE STUDIES AIR-LOCK, INCORPORATED IS PROPOSING TO DESIGN FULLY SEALED SHOULDER AND ARM BEARINGS WITH INTERCHANGEABLE BEARING HOUSINGS. THE INTERCHANGEABLE HOUSINGS SHALL BE UTILIZED IN TRADE STUDIES TO DETERMINE THE OPTIMAL BEARING PROFILE AND WEIGHT RELATIVE TO THE SHOULDER AND ARM POSITION. IT IS ASSUMED THAT THE NEXT GENERATION OF NASA PRESSURE SUITS WILL REQUIRE THE CREWMEMBER TO UTILIZE THEIR SUIT IN BOTH THE PRESSURIZED AND UNPRESSURIZED MODE. HISTORIC, KEY DESIGN DRIVERS HAVE ALWAYS BEEN SUITED COMFORT IN THE UNPRESSURIZED MODE AND SUIT MOBILITY IN THE PRESSURIZED MODE. AS A MINIMUM, BEARINGS WILL BE NEEDED AT THE SHOULDER, BICEP, AND WRIST TO SATISFY PRESSURIZED MOBILITY REQUIREMENTS. TO PLACATE UNPRESSURIZED COMFORT, THE OPTIMAL BEARING DESIGN SHALL BE LIGHTWEIGHT AND LOW PROFILE; OFTEN CONFLICTING CHARACTERISTICS IN BEARING DESIGN. THIS SBIR PROPOSAL WILL PROVIDE NASA WITH A BEARING DESIGN THAT FACILITATES QUICK TRADE STUDIES TO DETERMINE THE OPTIMAL BEARING PROFILE AND WEIGHT.contract · Last action 2009-01-15$97,782
- National Aeronautics and Space AdministrationUNDER PHASE 1 OF SUBJECT SBIR, AIR-LOCK, INCORPORATED WILL DESIGN A SELF DONNING AND DOFFING REAR ENTRY HARD UPPER TORSO (REHUT) THAT INTERFACES WITH A SUIT PORT. THIS DESIGN WILL ALLOW SUITED, PRESSURIZED CREWMEMBERS TO MATE/DEMATE THEIR SUITS TO/FROM SUIT PORTS LOCATED ON LUNAR OR PLANETARY HABITATS, ROVERS, ETC. THIS IS A SIGNIFICANT ACTIVITY BECAUSE IT MINIMIZES CONCERNS OVER DUST ENTERING THE HABITAT DURING CREWMEMBER ENTRY/EXIT AND IT MAXIMIZES THE HABITAT'S WORKING VOLUME BY ELIMINATING THE NEED FOR AIRLOCKS. FOR THE PURPOSE OF THIS SBIR, THE BASELINE ARCHITECTURE BEING WILL FOCUS ON NASA JSC'S MK-III ADVANCED SPACESUIT AND THE SUIT PORT BEING UTILIZED BY THE LUNAR ELECTIRC ROVER (LER).contract · Last action 2011-08-12$97,633
- National Aeronautics and Space AdministrationADVANCED CREW ESCAPE SUIT - ACES NECK RINGS AND WRIST DISCONNECTScontract · Last action 2010-03-10$95,800
- Department of Defense8503490942!VALVE,PNEUMATIC INFcontract · Last action 2016-08-02$95,580
- National Aeronautics and Space AdministrationHARD UPPER TORSO SHOULDER JOINT DESIGN FOR CREW MEMBER SIZING ADJUSTMENT AND ENHANCED MOBILITY.contract · Last action 2008-02-01$93,703
- Department of Defense4523101204!VALVE,PNEUMATIC INFcontract · Last action 2012-12-04$79,580
- National Aeronautics and Space AdministrationTHE OBJECTIVES OF PHASE III ARE: 1. DESIGN, ANALYZE, MANUFACTURE, AND DELIVER A PAIR EACH OF MOBILITY BEARINGS FOR THE SCYE JOINT (SHOULDER) AND ARM JOINT (ELBOW) OF THE EXPLORATION EXTRAVEHICULAR MOBILITY UNIT (XEMU) ADVANCED SPACE SUIT. 2. EVALUATION OF THESE BEARINGS IN A RELEVANT TEST ENVIRONMENT (DUST MITIGATION). TO MEET THE STATED OBJECTIVES, AIR-LOCK WILL PERFORM THE FOLLOWING TASKS: 1. HOLD A KICK OFF MEETING WITH A REQUIREMENT DECOMPOSITION OF THE XEMU SCYE JOINT AND ARM JOINT TO GAIN A FULL UNDERSTANDING OF THE BEARING S NEEDS RELATIVE TO DIAMETER, HEIGHT, HOLE PATTERN, LOADING, RESTRAINT LINE ATTACHMENT, CYCLE LIFE, DUST MITIGATION, SOFT GOODS ATTACHMENT AND SEALING. 2. CREATE CAD MODELS OF BOTH BEARING ASSEMBLIES. 3. PERFORM FINITE ELEMENT ANALYSIS (FEA) USING THE PHASE II DEVELOPED METHODS TO EVALUATE CONTACT STRESSES AND ENSURE PROPER MARGIN OF DURABILITY; UPDATE CAD MODELS AS REQUIRED. 4. ADAPT AND INTEGRATE NASA S DUST MITIGATION TECHNOLOGIES INTO THE CAD MODELS (SEE FIGURE 2). 5. CREATE DETAILED DRAWING PACKAGES FOR THE XEMU ARM AND SCYE BEARING ASSEMBLIES. 6. CREATE A VERIFICATION TEST PLAN FOR THE XEMU ARM AND SCYE BEARING ASSEMBLIES. 7. HOLD A MANUFACTURING READINESS REVIEW (MRR) WITH NASA PRIOR TO BUILD 8. FABRICATE (2) EACH XEMU SCYE BEARING ASSEMBLY 9. FABRICATE (2) EACH XEMU ARM BEARING ASSEMBLY 10. PERFORM NON-DESTRUCTIVE TESTING ON BEARING ASSEMBLIES INCLUDING DUST TESTING. WITHIN THE SCOPE OF THIS EFFORT, VARIOUS DUST SEAL MATERIALS WILL BE EVALUATED. 11. PERFORM MAINTENANCE AND CLEANING OF THE BEARINGS PRIOR TO DELIVERY. 12. DELIVERY OF ALL DATA AND HARD GOOD PRODUCTS TO THE ADVANCED EVA SPACE SUIT PROJECT GROUP.contract · Last action 2019-09-20$75,410
- Department of Defense4510408556!STRAP,WEBBINGcontract · Last action 2009-04-02$72,480
- Department of Defense8505383907!WYE,QUICK DISCONNECcontract · Last action 2018-04-09$67,314
- National Aeronautics and Space AdministrationEXTRAVEHICULAR MOBILITY UNIT SPACE SUIT WRIST BEARINGScontract · Last action 2012-08-10$64,500
- Department of Defense4516370773!STRAP,WEBBINGcontract · Last action 2010-12-09$57,870
- National Aeronautics and Space AdministrationECCENTRIC SHOULDER BEARINGScontract · Last action 2011-11-18$52,546
- Department of Defense8508138585!STRAP,WEBBINGcontract · Last action 2021-04-15$51,820
- Department of Defense4517647405!CONNECTOR,BAYONET,Ocontract · Last action 2011-04-25$51,660
- Department of Defense4508565774!COUPLINGcontract · Last action 2008-09-06$50,915
- Department of Defense8500562083!STRAP WEBBINGcontract · Last action 2016-03-29$50,311
- Department of Defense8509896021!WYE,QUICK DISCONNECcontract · Last action 2023-05-16$45,227
- Department of Defense8511396570!CONNECTOR,BAYONET,Ocontract · Last action 2025-05-22$44,395
- Department of Defense8506093109!BODY,VALVE,PNEUMATIcontract · Last action 2018-11-29$41,385
- Department of Defense8510392910!COUPLING HALF,QUICKcontract · Last action 2024-01-25$40,019
Federal contract dollars to this establishment. Primary NAICS: 332510 - HARDWARE MANUFACTURING. Last action: 2026-04-23. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1981-05-18 | Planned | 7 | 2 | $300 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Related searches
- Employers in CTState-wide enforcement data
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on AIRLOCK INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is AIRLOCK INC's OSHA violation history?
- AIRLOCK INC has 1 OSHA inspection on record with 7 violations and $300 in total penalties.